Corporation Of Chennai - Tamil Nadu

34073985 e tender supply, erection , testing and commissioning of of 47nos of 6mt post with 48w led fittingscomplete set at cnk lane, th road 2nd lane, perumal mudali streetand various places in div114, 115 zone ix for improving the lighting facilities in public places for the safety of women under nirbhaya scheme 1 supplyof one no of 6 mt x 88.9 mm od x 4.05 mm thickstreet lamp post with one mtr single straight bracket, 1no. of 2 core smc fuse box with hot dip zinc galvanising 2 supplyof one no of 8 mtr. street lamp post with 2.0 mtrstraight doublebracket, 1 no. of 4 core smc fuse box with hot dip zinc galvanising 3 hdpe pipe of size 50 mm o.d x 38mmi.d 4 i.si.marked 4x16 sq.mm cable 5 48w led street light fitting with led 6 150w led street light fitting with led 7 cost of supply of double wall corregated duct 120 / 103.5mm orange or blue colour ( to be used instead of hume pipe ) 8 i.si.marked 31 / 2x35 sq.mm cable 9 i.si.marked 2x16sq.mm cable 10 cost of erection & materials required for 6 mtr street lamp pole with 1 mtr long single straight bracket with hot dip zinc galvanising anchor bolt & flats ) ( normal soil ) ( material ratio 1:1.5:3 ) 11 cost of erection & materials required for 8 mtr street lamp pole with2 mtr long double straight bracketwith hot dip zinc galvanising anchor bolt & flats ) ( normal soil ) ( material ratio 1:1.5:3 ) 12 road cutting by mechanized tool including carting & drawal of cable & hdpe dwc pipe 13 labour for laying of cable through hdpe pipe ( 50 mm od ) in plain cement concrete road including braking of cement concrete road & filling of plain cement concrete mix of 1:1.5:3 ( with 12 mm jelly ) including carting of cable &hdpe pipe ( trench size 100mm breadth x 150mm depth ) 14 laying of cable in center median through 50 mm dia.od h.d.pe. pipe including carting of cable & h.d.p.e pipe ( trench size 45 cm width x 40 cm depth ) 15 laying of cable along road / streetthrough 50mm o d, h.d.p.e. pipe ( trench size 45cm width x 75 cm depth ) ...

Tamil Nadu Transmission Corporation Limited - Tamil Nadu

34073457 specification for supply of materials, fabrications and erection of 230 kv bus side ab switch in 230 kv autotransformer i of theni 230 110 kv ss under theni operation division tantransco under psdf scheme ii 1 earth work excavating depositing on bank with an initial lead of 10m and lift of 2 m in ( as per pwd schedule of rates double rate for narrow excavation and data a ) hard stiff clay, stiff black cotton , hard red earth , shales muram, grave stoney earth and earth mixed with small size boulders and hard gravelly soil ( pwd sch .rates ) sl no 60 2 b ) soft disintegrated rock , latterite soft rock or kankar not requiring blastingsl.no: 62 3 c ) earth work excavating depositing on bank with an initial lead of 10m and lift of 2 m in medium rock and dense medium rock not requiring blasting ( as per pwd schedule of rates double rate for narrow excavating and data a ) sl no 64 4 pcc 1:3:6 using 40 mmhbs jelly including cost of all materials, lead, lift, etc., complete with form work. 5 pcc 1:3:6 using 40 mmhbs jelly including cost of all materials, lead, lift, etc., complete with form work. 6 plastering with cm 1:3, 12 mm thick including cost of all materials, lead, lift, curing etc., complete ( as per data d & g ) 7 supplypaint of reputed make and labour, consumables for first primer coat using red oxide paintand first finish coat of painting using aluminium paintincluding consumables, after proper surface preparation using appropriate machinery to remove rust / scales etc as directed by the field engineer 8 supply of paint of reputed make ( ieasian, dulux, nerolec paint ) and labour for second coat of painting using aluminium paint including consumables 9 white washing two coats using cement paint over primer coat using white cement including cost of all materials labour lead lift etc complete. 10 colour washing two coats with approved exterior emulsionover one coat of white cement primer for structure plinth including cost of all materials, labour, lead, lift etc., complete. 11 labour, machinery, consumables for the fabrication for steel structures.with electricity supplied by department at free of cost. a ) heavy section ( 14 kg / m and above ) 12 labour, machinery, consumables for the fabrication for steel structures.with electricity supplied by department at free of cost. b ) light section ( below 14 kg / m ) 13 labour for the erection of the fabricated steelstructures with electricity supplied by department at free of cost. a ) heavy section ( 14 kg / m and above ) 14 labour for the erection of the fabricated steelstructures with electricity supplied by department at free of cost. b ) light section ( below 14 kg / m ) 15 labour, machinery, consumables for fabrication, erection of earthmat, earth connection, earth electrode, earthspike ( including sharpening of earth spike ) . as directed by the field engineer with electricity supplied by department at free of cost. 16 labour for excavating and refilling of earth / trench for earthmat, cable, etc., of any size / depth narrow excavation as directed by the field engineer. normal clay / hard gravel soil. 17 labour for dismantling of isolators including accessories, cost ofconsumables and lubricants and as directed by the field engineer. with electricity supplied by department at free of cost. 230 kv with earth 18 labour for erection of isolators with proper allingmentsincluding accessories, meggering and cost ofconsumables and lubricants and as directed by the field engineer. with electricity supplied by department at free of cost. 230 kv with earth 19 labour for the dismantling of jumper / droppers using a ) moose / zebra / panther conductors including modification of end clamps, providing holes etc wherever necessary as directed by the field engineer. ( lc period 30 % extra ) 20 labour for the erection of jumper / droppers using a ) moose / zebra / panther conductors including modification of end clamps, providing holes etc wherever necessary as directed by the field engineer. ( lc period 30 % extra ) 21 supply and provision of m8, m10, m12 and m16 ( full / half thread ) g.i.bolt and nuts of various sizes including plate / spring washers as required and as directed by the field engineer. 22 supply of aluminium power connectors / clamps / fittings with ss bolts and nuts , freight including modification if any etc., confirming to isas per the drawing and specifications . ( sl 83 ) a ) acsr panther conductor 23 supply of steel items and ab switches as per tneb specification including cost of materials, loading, transporting, unloading and delivery at site, complete. a ) 50 x 8 mm m.s. flat 24 b ) 65 x 10 mm m.s. flat 25 c ) 200 x 100 mm r.s. joists 26 d ) 50 x 50 x 6 mm m.s. angle 27 f ) 100 x 50 mm m.s. channel...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34060020 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenance in puzhal sub division of avadi division 2 excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34059997 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenancein redhillssubdivision of avadi division 2 excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34059973 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenancein korattursubdivision of ambattur division excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Corporation Of Chennai - Tamil Nadu

34059967 engaging of pocline machine boat jcb lorry labour for removal of hyacinth and silt from the existing canals at myllai balaji nagar 4th block in dn 188 unit 42 zone 14 => limited...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34039701 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenanceinie ambattursubdivision of ambattur division 2 excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34039692 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenancein ambattursubdivision of ambattur division 2 excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34039541 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenancein avadi subdivision of avadi division erection of distribution transformer structure , excavation of structure pole pit 2x3x1 / 6 th of height , erection of 9.14 m rcc / 9.0 mtr psc / rsj pole , transporting of 9.14 m poles from road side to pole pit , structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. , erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. , excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete , sleeve concrete for stay set including all materials , erection of hg fuse set with transport , erection of 11 kv ab switch complete setwith transport , transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt , erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure , for triple pole and four pole structure , erection of l.t.open type fuse unit including cable jumpering upto the line. , providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. , erection of h.t. jumpering in dp structure complete , erection of h.t. las , erection of l.t. las , erection of dt excluing loading and unloading , upto 100 kva , above 100 kva , painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. , loading and unloading of distribution transformer at site and store. , dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) , upto 100 kva , above 100 kva , crane hire charges , laying of ht cable , excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., , normal road ( earth ) , tar road , concrete road , transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. , 3x300 sq mm xlpe ( 1 drum: 200 m ) , 3x120 sq mm xlpe ( 1 drum: 200 m ) , laying of ht cable , laying of 300 sq mm xlpe cable , laying of 120 sq mm xlpe cable , covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough , refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. , transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) , laying of lt cable , tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. , 240 sq.mm ( 1 drum 200 m ) , 120 sq. mm ( 1 drum 500 m ) , excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. , normal road ( earth ) , tar road , concrete road , laying of lt cable , laying of 240 sq.mm cable , laying of 120 sq.mm cable , laying of 25 sq.mm cable , laying of 16 sq.mm cable , refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. , erection of pillar box , erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., , 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m , 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) , 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) , 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) , cleaning & painting with aluminium paint 2 coats & numbering with fdr details , 8 way pillar box , 6 way pillar box , 4 way pillar box , mini way pillar box , dismantling of pillar box , dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. , 4 / 6 / 8 way pillar box , mini pillar box , miscellaneous oherection work , erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) , excavation ofpole pit for 7.5 / 8 meters , erection of pole pit for7.5 / 8 meters , excavaion of polepit for 9.14 meters , erection of polepit for 9.14 meters , base concerting 30 cm thick for one pole including of all materials , erection of v cross arm 3 1 / 2size , erection of v cross arm41 / 2 size , erection of tapping channel 5 size , erection of stay set complete , fixing of 11 kv ti fitting , fixing of 33 kv ti fitting , fixing of lt 3 phase cross arm , fixing of lt ti fitting , fixing of single phase cross arm , lt pin insulator with pin , lt shackle with strap sets , 11 kv pin insulator with gi pin , 33 kv pin insulator with gi pin , 11 kv strain disc with metal parts , 33 kv strain disc with metal parts , fixing of aluminium knob , providing of fly stay ( excluding pole erection and earth excavation ) , concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) , 7.5 meters / 8 meters pole , 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) , earthing of poles , paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. , upto 7 / 2.59 mm acsr / 7 / 2.50 aaac , upto 7 / 3.35 mm acsr / 7 / 3.15 aaac , raccoon 7 / 4.09 per , dog conductor 7 / 4.72 , numbering of location / each including cost of paint and labour , providing of guarding per span excluding of stay set erection , 2 wire flat guarding ( split neutral grounding ) , 4 wire flat guarding , craddle guarding including earthing and earth pit excavation , erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. , erection of cross bracing set , dp structure , tp structure , erection oftop channels , 10 centre , 15 centre , erection of33 kv centre rotating ab switch complete set , erection of11 kv centre rotating ab switch complete set , erection ofspacers , line seperators & jumpers , single phase spacer / line seperators , three phase spacer / line seperators , provision of paa jumper per phase for lt , provision of paa jumper per phase for ht , metering set loading & unloading , loading , un loading , erection ofmetering sets , up to 11 metering set , a ) .loading of poles , 7.5 / 8 meters pole / each , 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each , b ) .un loading of poles , 7.5 / 8 meters pole ( rcc / psc ) / each , 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each , loading of conductor drum , conductor drum of all sizes with conductor , conductor drum of all sizes without conductor , un loading of conductor drum , conductor drum of all sizes with conductor , conductor drum of all sizes without conductor , maintenance work , maintenance of dt structure for various capacity ( pole mounted structure ) , dp / tp structure maintenance , dt maintenance , replacement of ht bushing rod , replacement of lt bushing rod , replacement of gasket , structure earthi re wiring . , replacement of structure earthing in complete without material , dt structure yard cleaning , numbering of location including cost of paint and labour , maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. , 8 way pillar box / 6 way pillar box , 4 way pillar box , mini pillar box , fixingofmissing doors in pillars including materials , ms mini pillar door , ms 4 waypillar door , ms 6 way / 8 waypillar door , frp 4 way pillar door , maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . , 11 kv ab switch at structure in work site , 11 kv ab switch at ss , maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . , 33 kv ab switch at ss / structure , tree cutting ( tree clearance ) , cutting of big tree fouling on the line. , clearing of heavy bushes , jungle / bushes / velikathan clearence , straitening ofleanedht / lt poles , pin point location , cut point location , resagging of ht / lt lines for all conductor sizes , re sagging ( ht ) 7 / 4.72 mm , re sagging ( ht / lt ) 7 / 4.09 mm , re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm , re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm , dismantling works , dismantling of 9.14 mtr. poles / rsj / tubular poles , dismantling of8mtr / 7.5 mtr poles / , dismantling of stay set complete , dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side , dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side , dismantling of damaged 6 way / 4 waypillar box , dismatling of transformer structure materials , dismatling ofab switch with hg fuse set , releasingof v x arm , stacking of materials / scarp , substation maintenance , removing weed in substation / office premises per sq.mtr ( jungle clearance ) , hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. , transporting offilter machine unit& oil drum ( to&fro ) , cleaning of110 kv breakersincluding cts and allied maintenance work , cleaning of 110 kvlas , cleaning of 110 kvab switch and applying petroleum jelly , cleaning of 110 kv power transformer insulators and other maintenance work , cleaning of 110 kv bus insulators , cleaning of33 / 11 kv breakersincluding cts and allied maintenance work , cleaning of 33 kv / 11 kvlas , cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly , cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work , cleaning of 33 / 11 kvbus insulators , aluminium painting in substation , 33kvstructure , 11kv structure , power transformer , breaker , erection ofsingle poledtstructure , loading andunloading of rcc 9 / 9.14 mtrsquare pole , excavation ofpole pit for 3 x 3 x 6size , erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. , loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) , excavation of stay pit for 2 x 2 x 6 size , erection of stay set complete including base plate , single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. , erection oftransformerstructure materials , erection of hg fuse set , erection of 11 kv ab switch complete set , provision of mass concreting of pole with cement , sand and jelly , erection of h.t. las , erection of l.t. las , erection of h.t. jumpering in dt structure complete , erection of l.t.open type fuse unit including cable jumpering complete set. , erection of ab switch alone for dp switch...

Corporation Of Chennai - Tamil Nadu

34039201 outsourcing engaging private labours for cleaning campus and toilets of govt. girls. hr.sec. school as per g.o. ( ms ) no.77, school education ( s.e.4 ( 1 ) department dated 13.04.2015 ) at 9th avenue, ashok nagar in dn , 135 ( old div 132 ) , u 31, z 10 ( for one...

Ministry Of Railways - Tamil Nadu

34021498 bids are invited for custom bid for services labour cost for mcc of pm trains no of coaches 29930 , custom bid for services cost of consumables tools machineries uniforms and misc for mcc of pm trains no of coaches 29930 , custom bid for services labour cost for cleaning watering of coaches of pftr trains no of coaches 35770 , custom bid for services cost of consumables tools machineries uniforms and misc for pftr trains no of coaches 35770 , custom bid for services labour cost for pit cleaning depot premises cleaning de weeding fogging of yard of 53648 sqm for 730 days , custom bid for services cost of consumables tools machineries uniforms and misc for pit cleaning depot premises cleaning de weeding fogging of yard of 53648 sqm for 730 days , custom bid for services labour cost for watering of enroute pass through trains no of coaches 751170 , custom bid for services cost of consumables tools machineries uniforms and misc for watering of enroute pass through trains no of coaches 751170 work for mechanized cleaning of primary maintenance trains, cleaning of platform turn round trains, watering of pass through trains at station and cleaning of depot premises at erode coaching depot for a period of two years....

Indian Army - Tamil Nadu

33985071 bids are invited for manpower outsourcing services minimum wage semiskilled; others; mazdoor / labour , manpower outsourcing services minimum wage unskilled; others; mazdoor / labour...

Department of Defence Production - Tamil Nadu

33972668 bids are invited for manpower outsourcing services minimum wage unskilled; others; mazdoor / labour , manpower outsourcing services minimum wage semi skilled; others; attendant , manpower outsourcing services minimum wage skilled; others; driver lmv...

Rural Development And Panchayats Department - Tamil Nadu

33967944 construction of 200000 litre capacity sump with epl at construction of 200000 litre capacity sump with epl at molapalayam h / o pachapalayam panchayat package no.1 / mp lad / 2021 22 , 1.construction of 200000 litre capacity sump with epl at molapalayam h / o pachapalayam panchayat , earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils.hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation ss 20b. first depth of 2m , earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils.hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation ss 20b. 2nddepth of 2m 3m , levelling coarse incement concrete 1:4:8 ( one cement, four sand and eight aggregates ) using 40mm hbg stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. , rcc 1:1.5:3 ( one cement, one and half sand and three agreegates ) using 20mm hbg stone excluding cost of reinforce ment, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishsing, curing etc., complete.1.50m to 4.50m below g.l. , 0m to 1.50m below g.l. , 0m to 4.5m from gl , supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for rcc items using ms sheets or susitable size of bg.10 stiffened with welded ms angles of size 25mm x 25mm x 3mmof boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete plane surface0.00m to 3.30m , supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for rcc items using ms sheets or susitable size of bg.10 stiffened with welded ms angles of size 25mm x 25mm x 3mmof boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete plane surface3.3m to 4.30m , supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for rcc items using ms sheets or susitable size of bg.10 stiffened with welded ms angles of size 25mm x 25mm x 3mmof boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete for0.00 to 3.30 m ( curved surface ) , supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for rcc items using ms sheets or susitable size of bg.10 stiffened with welded ms angles of size 25mm x 25mm x 3mmof boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete for0.00 to 3.30 m ( for round column ) , supplying, fabricating and placing in position of hsd steel rods for reinforcement including the cost of steel and binding wire etc., complete.rts rod , supply, delivery and fixing of ci manhole frame with cover of following size including cost of all materials, fixing of ms clamps, bolt and nuts etc., complete and as directed by dept.officers.size 0.60m x0.60m , painting two coats using emulsionpaint including cost ofcement paint cost of all materials, labour charges, etc., complete and as directed by twad , refilling the foundation with gravel ( other than sand ) in layers of not more than 15cm thick, watering, well ramming, consolidating, complying with standard specification and as directed by dept.officers. , earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils.hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation ss 20b. first depth of 2m , supplying of 90mm 6ksc unplasticized pvc pipes for portable water supply as per is 4985 / 2000 etc., complete , lowering pvc rigid pipes and specials to trench and laying to proper grade and alignment, jointing with pvc couplers with cement paste. , refilling with excavated soil ( other than sand ) complying with the standard specification for filling in foundation and basement , cost and supply 10hp openwell submersible motor , cost and supply 10hp panel board , provision for erection of submersible motor , gst amount for providing service to government contract works for the above construction works. { gst amount is the total gst amount for total overall quoted amount above this row in column bb for all works in this package } ...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33967934 labour works contract for segregation of the 11kv goonipalayam feeder to be fed from 110 / 33 / 11 kv kunjalam ss into agri to non agri.feeders under rdss scheme in respect of west / uthukottai section in tiruvallur division part 1 labour works contract for segregation of the 11kv goonipalayam feeder to be fed from 110 / 33 / 11 kv kunjalam ss into agri to non agri.feeders under rdss scheme in respect of west / uthukottai section in tiruvallur division part 1...

Tamil Nadu Transmission Corporation Limited - Tamil Nadu

33948973 labour charges for erection of 1 no healthy 10 mva, 110 / 33 11 kv, ece make power transformer bearing sl no s 86007 at indalur 110 kv ss in chengalpattu edc towards 2nd unit labour charges for erection of 1 no healthy 10 mva, 110 / 33 11 kv, ece make power transformer bearing sl no s 86007 at indalur 110 kv ss in chengalpattu edc towards 2nd unit => limited...

Indian Rare Earths Limited - Tamil Nadu

33946833 1 supply, providing and fixing of aerolite / ramco calcium silicate false ceiling supply, providing and fixing of aerolite / ramco calcium silicate false ceiling. material: 8mm thick integral densified micro edged light weight calcium silicate false ceiling tiles with integral densified calcium silicate reinforced with fibre and natural filler false ceiling tiles of size 595x595 mm of approved texture, design and patterns having nrc ( noise reduction coefficient ) of 0.50 ( minimum ) as per is 8225:1987, light reflectance of 85% ( minimum ) . non combustible as per bs: 476 ( part 4 ) , fire performance as per bs:476 ( part 6 &7 ) , humidity resistance of 100%, thermal conductivity. as per sl.no 1 of scope of work 2 2 supplying, providing & fixing of upvc window specification: supplying and fixing upvc supplying, providing & fixing of upvc window specification: supplying and fixing upvc ( un plasticized polyvinyl chloride ) windows of casement ( open ) / sliding type from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with gi / 1mm 125gsm and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. the epdm rubber ( black colour ) covered with over all the edges of frame and shutter the shutter will be provided with espag multi power point locks and also it operates as handle. as per sl.no.2 in scope of work 3 3 supplying, providing and fixing of upvc un plasticized polyvinyl chloride door supplying, providing & fixing of upvc ( un plasticized polyvinyl chloride ) door: providing and fixing casement ( open ) / sliding doors fabricated from un plasticized polyvinyl chloride ( upvc ) sections. profiles: the profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. the window unit should be designed with all corner joints mitred and fusion welded. windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. the sash should be of 60 x102mm. the mullion should be of 60 x 74mm. the profiles should have co extruded seals. hardware: all the hardware like friction stays, handles should be screwed with self tapping screws. 4 4 supplying, providing and fixing of aluminium composite panel supplying, providing and fixing of aluminium composite panel ( acp ) 4 sided having 50 x 25 x 1.50mm frame work vertical and horizontals out of specially designed extruded sections withstand wind pressure of 180 kg / sq.m and fabricated fixed at all level elevation / interior / exterior wall panel and height upto 15m. the extruded section cutting and fixing required space extruded section shall be of 6063 and alloy of bsh 9 confirming t is 63400 rate shall included to fix the main frame with necessary clamps, fasteners, bolt nuts etc as per sl.no.4 in scope of work 5 5 supplying, providing and fixing frp chequered plate supplying, providing and fixing frp chequered plate ( yellow / green / grey colour ) of 10mm thick flooring over a steel structural surface at mcc electrical control room and fixing with suitable bolt & nuts with washer, fastener with necessary arrangements and proper levelling with neat finishing, etc. rates : the rate shall include the cost of all the materials and labor involved in all the operation described above including scaffolding etc, if any required etc. complete as per standard specification and as per the direction of engineer in charge. 6 6 fitter for miscellaneous works fitter for miscellaneous works such as dismantling of existing doors, windows, floor, side cladding, etc. as per the direction of engineer in charge. ( rate excluding the cost of materials ) .. 7 7 labour mazdoor for miscellaneous works labour ( mazdoor ) for miscellaneous works such as dismantling of existing doors, windows, floor, side cladding, etc. as per the direction of engineer in charge. ( rate excluding the cost of materials ) ....

Ministry Of Defence - Tamil Nadu

33944485 bids are invited for unskilled; others; mazdoor / labour total quantity :manpower outsourcing services minimum wage unskilled; others; mazdoor / labour...

Ministry Of Defence - Tamil Nadu

33944183 bids are invited for services manpower outsourcing services minimum wage semiskilled; admin; office supervisor , manpower outsourcing services minimum wage unskilled; others; mazdoor / labour...

National Institute Of Technology - Tamil Nadu

33899656 supply and installation of gun sprinkler work and its accessories in football ground at nit trichy , supplying, fixing and commissioning of 75 mm pvc pipe 6 kg as directed by the engineer in charge.. , supplying, fixing and commissioning of 63 mm pvc pipe 6 kg as directed by the engineer in charge. , supply of 1 1/4qcv along with its necessary accessories as directed by the engineer in charge. , supply of 1 1/4 handle for qcv along with its necessary fittings as directed by the engineer in charge. , supply of 1 1/4 gun sprinkler along with its necessary fittings as directed by the engineer in charge. , supply of 10 round valve box along with its necessary fittings as directed by the engineer in charge. , supply of 7 1/4 hp submersible pump along with its necessary fittings as directed by the engineer in charge. , supply of starter for pump along with its necessary fittings as directed by the engineer in charge. , excavating trenches of required width for laying of pipes, cables, etc , labour charges for installation of qcv, handle, gun sprinkler, round valve box, submersible pump, starter etc., complete as directed by engineer in charge....

Council Of Scientific And Industrial Research - Tamil Nadu

33898715 supply, installation and commissioning of 6.5 tons precision air conditioning unit with 20 kva 3 phase stabilizer , supply, installation and commissioning of 6.5 tons precision air conditioning unit with 20 kva 3 phase stabilizer , factory made dx type air cooled floor mountedcomplete precision air conditioning unit ( pacu ) with variable capacity scroll compressor ( the scroll compressor shall modulate its capacity from 20% to 100% without frequency variation ) & ec fan ( indoor + outdoor ) for better efficiency, coated cooling coil etc., along with matching air cooled anti corrosive condenser, ir / ultra sonic humidifier or equivalent & heaters, water leak detector sensor, g5 filters, expansion valves & drierswith micro processor controls, pre assembled, factory tested unit / completely installed system and ready for commissioning at site. the pacu shall have return air flow condition. the precision ac unit shall have icom control system to have highest capabilities of unit control communication & monitoring critical cooling unit which provides advanced diagnostic & maintenance support for precise control of temperature & humidity of required conditioned room. , installation, testing & commissioning of pacu including commissioning of necessary field devices, precision of potential free contact to trip individual unit on fire alarm signal, controllers & software. , supply & laying of `k’ type hard drawn hot gas & liquid line refrigerant copper piping, having a thickness of 18g with all fittings accessories & gi perforated tray for laying copper piping as per standard for interconnecting between indoor including all supporters, clamps & 3 nos pacu painting etc. with necessary civil work as per site condition. hot gas line should be insulated with 13 mm thick nitrile rubber insulation for 3 nos of pacu. , 4 core 2.5 sq.mmcopper control cable between indoor & outdoor unit of 3 nospacu with necessary supports and fittings etc. , earthing 8 swg copper from electrical isolator switch to pacu through stabilizers & between indoor & outdoor unit , charges for pressure &leak testing, charging of refrigerant gas for all 3 nos of pacu , supply, installation, testing & commissioning of 20kva 3 phase servo stabilizers floor mounted compact size model with latest energy efficient technology suitable for 3 nos of pacu of 6.5 ton. servo stabilizers should have over, under voltage & current protection relay range, input voltage 340 to 460 and output voltage 410 plus, minus 1%. suitable for all type of load, copper winding, efficiency 98%, quick response time, confirming to is 9815 & latest iso certificate, indore type complete in all respect, as directed by engineer in charge. , supply & laying of gi, b class drain piping with 6 mm thick nitrile rubber having aluminum foil facing on drain water pipes & fitting like valves, flanges & specification including necessary civil works as per site condition , ( a ) condensate drains piping 40 nb gi b class pipes for 3 pac units. , ( b ) humidifier water piping with 25 nb gi b – class pipe for 3 pac units , civil works related to indoor unit & stabilizers supporting stand & also supporting the condensing unit in cement pillar / angle support for 3 nos of pac units. , supply and installation of air supply provision to site fabricated rectangular viii gss ducting with 13 mm nitrile rubber insulation ( finally covered with colour aluminium foil shall be used for aesthetics ) including bends, collars, guiding vanes, dampers, hangers, steel supports, anchor fasteners, etc of the following sizes as per sma cna standards , ( i ) 24 swg galvanised steel sheet , ( ii ) 22 swg galvanised steel sheet , ( iii ) 9 mm open cell acoustic insulation , ( iv ) air grill with damper , ( v ) motorised damper for on / off , ( vi ) volume central damper ( vcd ) , packing & forwarding, insurance and transportation charges , comprehensive amc for the 2nd year , comprehensive amc for the 3rd year , labour amc for 4th year , labour amc for 5th year , labour amc for 6th year , labour amc for 7th year , labour amc for 8th year...

Indian Army - Tamil Nadu

33896396 bids are invited for item no 1 lift operator skilled per person as per existing rates. item no 2 employees provident fund as per existing rates item no 3 employees state insurance as per existing rates item no 4 over head & profit on total of srl no 1 to 3 item no 5 gst as per existing rates on total of srl no 1 to 3 item no 6 labour welfare cess (lwc) on total of srl no 1 to 5 item no 7 comprehensive maintenance to electrically operated passenger lift at nandanam, make supriya elevators complete all as detailed in ser item no 3 of satc and scope of work. item no 8 comprehensive maintenance to electrically operated passenger lift at nandanam make omega elevators , complete all as detailed in ser item no 4 of satc and scope of work. item no 9 comprehensive maintenance to electrically operated passenger lift at seven wells make johnson, complete all as detailed in ser item no5 of satc and scope of work. item no 10 supply only main contactor 32a, 3 no + 1nc, 230v, 50hz complete all as specified and directed item no 11 supply only vvvf (variable voltage variable frequency) drive 3.7kw / 5hp complete all as specified and directed item no 12 supply only infrared door sensor for automatic door operating system complete all as specified and directed. item no 13 supply only limit switch 1 no + 1nc 230v ac complete all as specified and directed item no 14 supply only mother board down collective complete all as specified and directed item no 15 supply only main suspension rope 13mm dia complete all as specified and directed item no 16 supply only over speed governor rope 8mm dia complete all as specified and directed item no 17 supply only ard battery 12v 7ah complete all as specified and directed item no 18 supply only for travelling cable 12 core 0.5 sqmm, 1100v grade complete all as specified and directed item no 19 supply only pf & rr card 230v, 50hz ac complete all as specified and directed item no 20 supply only loft fan 12” 230v, 50 hz ac complete all as specified and directed item no 21 supply only auto door coupler complete all as specified and directed item no 22 supply only car operating panel (cop) complete all as specified and directed item no 23 supply only landing operator panel (lop) complete all as specified and directed item no 24 supply only door vvvf drive complete all as specified and directed item no 25 supply only over load warning device complete all as specified and directed total quantity : 12120...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33894555 supply of g.i back clamp suitable for 9 mtr psc pole as per tenderspecification , supply ofg.i back clamp for 9.00 mtr psc pole ( 300 kg ) , 0.6kva ups , g.i back clamp for 9.00 mtr psc pole ( 300 kg ) , pole pit for 9.0m and 9.14 m psc / rcc / all metal poles ( each pit ) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting / cheseling required [ specific approval should be obtained from concerned ee ] , stay pit , in ordinary soil [ 0.95 x 0.6 x 1.2m ] , semi rocky soil , stay pit in heavy rocky soil where blasting / cheseling reqiured [ specific approval should be obtained from concerned ee ] , erection of poles & stays ( including refilling of excavated earth ) , erection of 7.5m / 8.0m poles [ rcc / psc ] , erection of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. ( including stay pit excavation & refilling & erection ) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt / ht ti fitting , fixing of lt 3 ph x arm , fixing of 3 [ 1 / 2 ] v` x arm , fixing of4 [ 1 / 2 ] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc / polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [ including transport of condutor from road side to work spot ] per run , upto 7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , acsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , acsr 7 / 4.09 mm , above 7 / 4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit ] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [ double side earthing ] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [ including all materials ] . , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set ( 4 sets ) , mass concreting ( cement:sand:jelly supplied by the contractor ) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [ 2 nos channel ] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ ht side ] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [ two coat of red oxide ] all metal parts ( excluding cost of paint ) . , painting of stru. complete excluding dt [ one coat alu paint, excluding cost of paint ) , colour washing of 2 numbers structure pole [ excluding cost of distember / snowsem ] , painting name of ss at seating channel including paint. , painting of dt alone [ excluding painting ] with red oxide and double coating of aluminium paint. , dt metering arrangement ( without materials ) , erection of distribution transformer / dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [ black background and yellow letters ] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp / led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl / 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection / dismantling of metering set 11 kv / 22 kv / 33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5 / 8 , all size angles / channel above 5 / 8 , slot holes in flat / angles / channel upto 3 / 4 , slot holes in flat / angles / channel above 3 / 4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt [ pin point ] location , set right the leaning pole in both ht & lt [ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [ during conductor or support change ] , releasing and erection 3 ph sc wire [ during conductor or support change ] , destruction of pole concerting at site. , retrieving grill from detoriated pole [ grill separate from damaged pole ] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [ railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc / metal pole [ per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc / psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer / metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer / metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [ rcc / psc ] , dismantling of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt / ht ti fitting , dismantling of lt / ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3 [ 1 / 2 ] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc / polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7 / 4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Tamil Nadu Cooperative Sugar Federation Limited - Tamil Nadu

33888597 removal of filter bed materials cleaning and refilling of materials in the fly ash collection pits 4 nos and cleaning of water collection pit 1 removal of filter bed materials cleaning and refilling of materials in the fly ash collection pits 4 nos and cleaning of water collection pitfor our mills the terms and conditions are mentionedin the pdf. file 2 removal of all existing filter bed materials from the ash pit4 nos. cleaning and refilling of r.r. stone boulders 150mm to 250mm size, 40 mm jelly ( 100mm thick ) , 12mm hbg chips ( 100mm thick ) . and river sand the quantity of materials additionally required40mm, 20 mm jelly, 12mm chips jelly and river sand will be issued from the mills on non recoverable basis to the work. the rate should be quoted only for labour charge for providingfilter bed as stated above and to clear / desilt the water collection pit 1 no at west side of filter beds....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33879806 ttps – clearing of all kinds of wastage, debris, silt, fly ash etc., from the dustbins in stage i & ii area for the period from 08.10.2022 to 31.03.2023. clearing of all kinds of waste , garbages, debries, silt, fly ash etc., from dustbins and spilled arounddustbins areas in various places suchas power house area , switchyard, transformer yard, mill plant, boilerarea, ash handling plant area of unit i, ii & iii and disposing away with alead of 1km away from the site, asdirected by the engineer at site usingtractors with body height not less than0.60m, rate including for hire chargesfor tractor , cost of diesel , engine oil, wear & tear, labour, lead, lift, etc., complete. ( clearance to be done oncein a week or as directed for a periodof 6 ( six ) months. nets shall be usedto cover garbage’s while transporting ) ....

Rural Development And Panchayats Department - Tamil Nadu

33879473 cc with drain total no of work in 7 nos annur block, coimbatore district cc with drain total no of work in 7 nos annur block, coimbatore district , name of work:1.providing c.c. pavement from akkaraisengapalli bt road to chitra househ / o akkaraisengapalli panchayat , earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per ss 20 b for foundation ( 0m 0.30m ) , cement concrete 1:4:8 mix using 40mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , cement concrete 1:3:6 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , supplying erecting centering and shuttering for sides and including all and fixing labour charges etc., , cement concrete 1:2:4 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , name of work: 2.providing c.c. pavement near ramegoundanur murugan house h / o akkaraisengapalli panchayat , earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per ss 20 b for foundation ( 0m 0.30m ) , cement concrete 1:4:8 mix using 40mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , cement concrete 1:3:6 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , supplying erecting centering and shuttering for sides and including all and fixing labour charges etc., , cement concrete 1:2:4 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , name of work: 3.providingc.c.road with drainfromthottipalayam bt road to jothi house h / o akkaraisengapalli panchayat , earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per ss 20 b for foundation ( 0m 0.30m ) , cement concrete 1:4:8 mix using 40mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , cement concrete 1:3:6 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , supplying erecting centering and shuttering for sides and including all and fixing labour charges etc., , cement concrete 1:2:4 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , plastering with cement mortar 1:5mixto 20 mm thick includingcost and conveyance of all materials to site and all labour , name of work: 4.construction of drainfrompappal house to pallam h / o akkaraisengapalli panchayat , earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per ss 20 b for foundation ( 0m 0.30m ) , cement concrete 1:4:8 mix using 40mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , cement concrete 1:3:6 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , supplying erecting centering and shuttering for sides and including all and fixing labour charges etc., , plastering with cement mortar 1:5mixto 20 mm thick includingcost and conveyance of all materials to site and all labour , name of work: 5.providingc.c.road with drainfrombt road to ramesh house h / o akkaraisengapalli panchayat , earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per ss 20 b for foundation ( 0m 0.30m ) , cement concrete 1:4:8 mix using 40mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , cement concrete 1:3:6 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , supplying erecting centering and shuttering for sides and including all and fixing labour charges etc., , cement concrete 1:2:4 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , plastering with cement mortar 1:5mixto 20 mm thick includingcost and conveyance of all materials to site and all labour , name of work: 6.construction of drain @ akkaraisengapalli ad colony kumar house to vinayagar kovil h / o akkaraisengapalli panchayat , earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per ss 20 b for foundation ( 0m 0.30m ) , cement concrete 1:4:8 mix using 40mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , cement concrete 1:3:6 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , supplying erecting centering and shuttering for sides and including all and fixing labour charges etc., , plastering with cement mortar 1:5mixto 20 mm thick includingcost and conveyance of all materials to site and all labour , name of work: 7.construction of drain @ kunnipalayam ad colony 1st street and 2nd streeth / o akkaraisengapalli panchayat , earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per ss 20 b for foundation ( 0m 0.30m ) , cement concrete 1:4:8 mix using 40mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , cement concrete 1:3:6 mix using 20mm iss metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. , supplying erecting centering and shuttering for sides and including all and fixing labour charges etc., , plastering with cement mortar 1:5mixto 20 mm thick includingcost and conveyance of all materials to site and all labour , gst amount for providing service to government contract works for the above construction works. { gst amount is the total gst amount for total overall quoted amount above this row in column bb for all works in this package } ...