Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34128574 rate contract for execution of works for agri feeder segregation under rds scheme for udumalpet division, poolavady sub division thungavi section 1 excavation of pole pits / stay set: 2 for pole upto 8.00m length by using jcb / manually 3 for pole above 8.00m length by using jcb / manually 4 in hard soil ( common to all size of poles ) 5 in rocky area ( common to all size of poles ) by blasting / manually 6 excavation of stay pit of 4.5 to 5 depth using jcb / manually 7 excavation of stay pit in hard rock soil 8 excavation and back filling of stay pit in hard rock soil with out blasting 9 excavation and back fillingof stay pit inmedium rock and dense medium rock requires blasting 10 erection of poles and accessories 11 erection of rcc, rec, psc poles upto 8.00m length by using crane / manually 12 erection of rcc, rec, psc poles above 8.00m length by using crane / manually 13 erection of metal supports above 9m / rsj / rail pole / tubular poles 14 erection of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. 15 erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. 16 erection of stay set complete in the rock area by blasting 17 fixing of line materials 18 fixing v cross arm4.5 feet 19 fixing of lt s phase cross arm 20 fixing of lt 3 phase cross arm 21 fixing of ht / lt ti fitting 22 fixing of ht pin insulator with pin 22 kv 23 fixing of lt pin insulator 24 fixing of ht strain disc 11 kv 25 fixing of ht strain disc 22 kv 26 fixing of shackle 27 fixing of aluminium knob 28 fixing of ht las ( 3 nos. ) 29 fixing of tapping channal x arm 30 fixing of guarding channal x arm 31 lt open type fuse unit 32 dismandlingv cross arm4.5 feet 33 dismandling of lt s phase cross arm 34 dismandlingof lt 3 phase cross arm 35 dismandling of ht / lt ti fitting 36 dismandling of ht pin insulator with pin 22 kv 37 dismandlingof lt pin insulator 38 dismandling of ht strain disc 11 kv 39 dismandling of ht strain disc 22 kv 40 dismandlingof shackle 41 dismandling of aluminium knob 42 dismandlingof tapping channal x arm 43 dismandling of guarding channal x arm 44 dismandlingof dt below 200kva 45 dismandlingof dt above 200kva below 500kva 46 dismandlingof dt500kva 47 destruction of pole concreting at site 48 retrieving grill from deteriorated rcc pole 49 stringing of conductors: 50 paving and stringing of conductors of sizes upto 7 / 2.59 mm acsr or other equivalent conductor 51 paving and stringing of conductors ofabove7 / 2.59 mm acsr or other equivalent conductor upto 7 / 3.35mm acsr or other equivalent conductor 52 paving and stringing of conductors of7 / 4.09mm acsr or other equivalent conductor 53 dismantling of conductor ofupto 7 / 3.35 including transporting the conductors to the nearest road side and stocking in coils 54 dismantling of conductor ofabove 7 / 3.35 including transporting the conductors to the nearest road side and stocking in coils 55 erection of distribution transformers: 56 erection of distribution transformer structure complete as per tneb standard including painting, feeders arrangrment, colour washing of rcc poles etc.. fixing of poles type to be unit ht / lt las and jumpering 3 nos earth pits with earth trough except erection of distribution transformer. ( data as per annexure ii ) 57 erection of single pole transformer structure completeas per tneb standard including painting, feeders arrangrment, colour washing of rcc poles etc.. fixing of poles type to be unit ht / lt las and jumpering 3 nos earth pits with earth trough except erection of distribution transformer 58 erection of distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa. 59 ( i ) upto 25 kva distribution transformer / metering set. 60 ( ii ) above 25 kva to 100 kva 61 ( iii ) above 100 kva to 250 kva 62 ( iv ) 500 kva and above 63 ( v ) failed dt replacement below 100 kva 64 ( vi ) failed dt replacement 100 kva and above 65 erection of dp structure: 66 erection of dp structure with stay as per tneb standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., ( data as per annexure i ) ( i ) with 22 / 33 kv ab switch using all types of poles of size 9.14 m and above length 67 erection of single pole dp with completeand with single earth 68 concreting works: 69 concreting with 1:4:8 mix using 40 mm jelly including curing ( material + labour ) 70 ( i ) mass concreting of poles 71 ( ii ) sleeveconcreting 72 ( iii ) stay concreting 73 loading and unloading charges: 74 loading or unloading of distribution transformer 75 ( i ) upto 100 kva 76 ( ii ) above 100 kva and upto 500 kva 77 ( iii ) metering set of all ratios 78 loading or unloading of various sizes of poles 79 ( i ) rec, rcc, psc pole upto 8.00 m length 80 ( ii ) all rec, rcc pole above 8.00 m length 81 ( iii ) metal poles all sizes 82 loading of conductor 83 unloading of conductor 84 loading / unloading of iron & steel 85 loading / unloading of line materials 86 guarding arrangement 87 provision of guarding with two numbers earth pits excluding stay set erection 88 ( i ) flat guarding with earth pit 89 ( ii ) split neutral 90 transportation charges: 91 transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50 km 92 transportation of all type of poles by bullock cart or other vehicle ( for all sizes of poles including loading and unloading ) 93 ( i ) for a lead upto 5 km 94 ( ii ) above 5 km of lead of every km 95 transport of metal pole of all sizes by head loads in hill areas from road side to pole pit location 96 ( i ) upto 1 km 97 ( ii ) above 1 km per each km 98 transporting of conductors of all sizes from road side to pit locations upto one km of conductor 99 ( i ) transporting of distribution transformer / line materials from stores to office / site upto 10 km distance by engaging 1 ton capacity minidor ( lorry ) 100 ( ii ) above 10 km 101 painting: 102 numbering of poles including base painting and with cost of paint 103 painting of iron poles up to 36 ft length with double coats including cost of paint 104 painting of iron poles up to 40 ft 200 / 100 length with double coats including cost of paint 105 painting of cement poles by distember coating including cost of distember 106 painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details ( items 1 to 6 brush to be owned by the contractor ) ( paint to be supplied by department ) 107 workshop charges: 108 manufacturing / altering of clamps 109 drilling of holes in the structure materials clamps etc., 110 ab switch or open type side arm stud, cutting and drilling holes 111 manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe 112 general: 113 jungle clearance such as kattu karuvai in the various area without uprooting 114 jungle clearance such as kattu karuvai in the various area with uprooting 115 clearing of tree braches of coconut trees 116 clearing of tree braches of neem, tamarin, country etc 117 leveling of ground using bul dozer 118 clearing of branches / trees with jcb 119 fencing of distribution transformer structure at road side fabrication and erection. ( including all materials ) 120 painting one coat of red oxide paint ( with out paint ) 121 painting two coat of aluminiumpaint over coat of primer paint ( with out paint ) ...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34111313 rate contract for execution of works for separation of double dts under rds scheme for angalakuruchi division, angalakuruchi sub division ae o and m rural anaimalai section 1 excavation of pole pits / stay set: 2 for pole upto 8.00m length by using jcb / manually 3 for pole above 8.00m length by using jcb / manually 4 in hard soil ( common to all size of poles ) 5 in rocky area ( common to all size of poles ) by blasting / manually 6 excavation of stay pit of 4.5 to 5 depth using jcb / manually 7 excavation of stay pit in hard rock soil 8 excavation and back filling of stay pit in hard rock soil with out blasting 9 excavation and back fillingof stay pit inmedium rock and dense medium rock requires blasting 10 erection of poles and accessories 11 erection of rcc, rec, psc poles upto 8.00m length by using crane / manually 12 erection of rcc, rec, psc poles above 8.00m length by using crane / manually 13 erection of metal supports above 9m / rsj / rail pole / tubular poles 14 erection of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. 15 erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. 16 erection of stay set complete in the rock area by blasting 17 fixing of line materials 18 fixing v cross arm4.5 feet 19 fixing of lt s phase cross arm 20 fixing of lt 3 phase cross arm 21 fixing of ht / lt ti fitting 22 fixing of ht pin insulator with pin 22 kv 23 fixing of lt pin insulator 24 fixing of ht strain disc 11 kv 25 fixing of ht strain disc 22 kv 26 fixing of shackle 27 fixing of aluminium knob 28 fixing of ht las ( 3 nos. ) 29 fixing of tapping channal x arm 30 fixing of guarding channal x arm 31 lt open type fuse unit 32 dismandlingv cross arm4.5 feet 33 dismandling of lt s phase cross arm 34 dismandlingof lt 3 phase cross arm 35 dismandling of ht / lt ti fitting 36 dismandling of ht pin insulator with pin 22 kv 37 dismandlingof lt pin insulator 38 dismandling of ht strain disc 11 kv 39 dismandling of ht strain disc 22 kv 40 dismandlingof shackle 41 dismandling of aluminium knob 42 dismandlingof tapping channal x arm 43 dismandling of guarding channal x arm 44 dismandlingof dt below 200kva 45 dismandlingof dt above 200kva below 500kva 46 dismandlingof dt500kva 47 destruction of pole concreting at site 48 retrieving grill from deteriorated rcc pole 49 stringing of conductors: 50 paving and stringing of conductors of sizes upto 7 / 2.59 mm acsr or other equivalent conductor 51 paving and stringing of conductors ofabove7 / 2.59 mm acsr or other equivalent conductor upto 7 / 3.35mm acsr or other equivalent conductor 52 paving and stringing of conductors of7 / 4.09mm acsr or other equivalent conductor 53 dismantling of conductor ofupto 7 / 3.35 including transporting the conductors to the nearest road side and stocking in coils 54 dismantling of conductor ofabove 7 / 3.35 including transporting the conductors to the nearest road side and stocking in coils 55 erection of distribution transformers: 56 erection of distribution transformer structure complete as per tneb standard including painting, feeders arrangrment, colour washing of rcc poles etc.. fixing of poles type to be unit ht / lt las and jumpering 3 nos earth pits with earth trough except erection of distribution transformer. ( data as per annexure ii ) 57 erection of single pole transformer structure completeas per tneb standard including painting, feeders arrangrment, colour washing of rcc poles etc.. fixing of poles type to be unit ht / lt las and jumpering 3 nos earth pits with earth trough except erection of distribution transformer 58 erection of distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa. 59 ( i ) upto 25 kva distribution transformer / metering set. 60 ( ii ) above 25 kva to 100 kva 61 ( iii ) above 100 kva to 250 kva 62 ( iv ) 500 kva and above 63 ( v ) failed dt replacement below 100 kva 64 ( vi ) failed dt replacement 100 kva and above 65 erection of dp structure: 66 erection of dp structure with stay as per tneb standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., ( data as per annexure i ) ( i ) with 22 / 33 kv ab switch using all types of poles of size 9.14 m and above length 67 erection of single pole dp with completeand with single earth 68 concreting works: 69 concreting with 1:4:8 mix using 40 mm jelly including curing ( material + labour ) 70 ( i ) mass concreting of poles 71 ( ii ) sleeveconcreting 72 ( iii ) stay concreting 73 loading and unloading charges: 74 loading or unloading of distribution transformer 75 ( i ) upto 100 kva 76 ( ii ) above 100 kva and upto 500 kva 77 ( iii ) metering set of all ratios 78 loading or unloading of various sizes of poles 79 ( i ) rec, rcc, psc pole upto 8.00 m length 80 ( ii ) all rec, rcc pole above 8.00 m length 81 ( iii ) metal poles all sizes 82 loading of conductor 83 unloading of conductor 84 loading / unloading of iron & steel 85 loading / unloading of line materials 86 guarding arrangement 87 provision of guarding with two numbers earth pits excluding stay set erection 88 ( i ) flat guarding with earth pit 89 ( ii ) split neutral 90 transportation charges: 91 transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50 km 92 transportation of all type of poles by bullock cart or other vehicle ( for all sizes of poles including loading and unloading ) 93 ( i ) for a lead upto 5 km 94 ( ii ) above 5 km of lead of every km 95 transport of metal pole of all sizes by head loads in hill areas from road side to pole pit location 96 ( i ) upto 1 km 97 ( ii ) above 1 km per each km 98 transporting of conductors of all sizes from road side to pit locations upto one km of conductor 99 ( i ) transporting of distribution transformer / line materials from stores to office / site upto 10 km distance by engaging 1 ton capacity minidor ( lorry ) 100 ( ii ) above 10 km 101 painting: 102 numbering of poles including base painting and with cost of paint 103 painting of iron poles up to 36 ft length with double coats including cost of paint 104 painting of iron poles up to 40 ft 200 / 100 length with double coats including cost of paint 105 painting of cement poles by distember coating including cost of distember 106 painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details ( items 1 to 6 brush to be owned by the contractor ) ( paint to be supplied by department ) 107 workshop charges: 108 manufacturing / altering of clamps 109 drilling of holes in the structure materials clamps etc., 110 ab switch or open type side arm stud, cutting and drilling holes 111 manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe 112 general: 113 jungle clearance such as kattu karuvai in the various area without uprooting 114 jungle clearance such as kattu karuvai in the various area with uprooting 115 clearing of tree braches of coconut trees 116 clearing of tree braches of neem, tamarin, country etc 117 leveling of ground using bul dozer 118 clearing of branches / trees with jcb 119 fencing of distribution transformer structure at road side fabrication and erection. ( including all materials ) 120 painting one coat of red oxide paint ( with out paint ) 121 painting two coat of aluminiumpaint over coat of primer paint ( with out paint ) ...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34073937 work contract for hvds work in 22 kv anaikaraipatty feeder in east / bodi section 1 loading or unloading metal poles all sizes 2 unloading of dt upto 100 kva 3 other tree branch clearance 4 alteration of stay clamp 5 erection of dt upto 25kva / metering set 6 dismandling of cross arm 7 cocount tree clearance branch 8 dismantling of dt upto 100 9 erection of psc pole upto 8 m 10 loadind of dt upto 100 11 stringing of conductor above 7 / 2.59 mm 12 earthing of pole gi 4 or 6 swg 13 loading / unloading of lt line material 14 drillijng of holes up to 3 / 4 15 excavation of pole upto 8.0m 16 transporting of conductor all sizes 17 painting of iron poles up to 40ft 18 dismandling of trannsformer structure material 19 loading / unloading of ht line material 20 loading of conductor 21 unloading of conductor 22 fixing of aluminium knob 23 stay concreting 24 fixing of shackle 25 erection of stay set complete 26 fixing of lt pin insulator 27 levelling of ground using bul dozer 28 erection of sp structure 29 erection of dp structure 30 erection of double pole dt structure complete 31 diamandling of metal and psc poles 32 loading / unloadng of psc pole upto 8mtr 33 transport of poles above 5 km ( 8km ) 34 fixing of ht / lt fitting 35 fixing of v cross arm 4.5 feet 36 loading / unloading of 22 kv strain disc 37 excavation of pit in hard soil 38 erection of dt above 25kva to 100 kva 39 transport of dt / line material upto 10 km 40 sleeve concreting 41 excavation of pole above 8 m 42 excavation of stay pit 4.5 to 5 43 dismandling of conductor upto 7 / 3.35 44 releasing and reerection of conductor 45 fixing of tapping channel cross arm 46 loading / unloading of psc pole above 8 m 47 alteration of back clamp 48 fixing of ht pin insulator 49 erection of psc pole above 8 m 50 provision of spike earthing arrangement 51 fixing of 22 kv strain disc 52 fixing of lt 3 phase cross arm 53 transport of pole for a lead upto 5 km...

Southern Railway - Tamil Nadu

34073459 auction sale of p.l. no. 98326030 condemned and unserviceable tractor with dozer ( without batteries, radiator fan, self starting motor ) . rc book not available. make : hmt, model: hmt 7511, year: 2004, engine no. 0400004, chassis no.0150. as is where is condition. total weight 4780 kgs approximately. rate per number should be quoted....

Neyveli Lignite Corporation Limited - Tamil Nadu

33788580 supply of 1. segment bolt and nut set for beml make bull dozer (d155 a) consisting of bolt 1 no. (part no.178 27 11150) and nut 1 no. (part no.01803 02430) 2. segment bolt for bp 100 pipelayer 3. segment nut for bp 100 pipelayer.....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33532687 running contract for the erection of works for lt overhead feeder, dismantling works, eos to aggl normal services, tatkal aggl services and sfs aggl services and natural calamities pertaining to south/kangayam sub division of kangayam division running contract for the erection of works for lt overhead feeder, dismantling works, eos to aggl normal services, tatkal aggl services and sfs aggl services and natural calamities pertaining to south/kangayam sub division of kangayam division , excavation of pole pits for pole upto 8.00m length by using jcb/manual , excavation of pole pits for pole above 8.00m length by using jcb/manual , erection of rcc, rec, psc poles upto 8.00m length by using crane / manual , erection of rcc, rec, psc poles above 8.00m length by using crane / manual , erection of metal supports above 9m / rsj / rail pole/tubular poles , excavation of stay pit of 4.5 to 5 depth using jcb / manual , erection of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. , fixing of v cross arm 3.5feet , fixing of lt s phase cross arm , fixing of lt 3 phase cross arm , fixing of ht / lt ti fitting , fixing of ht pin insulator with pin 11 kv , fixing of lt pin insulator , fixing o tapping channel cross arm/guarding cross arm , fixing of ht strain disc 11 kv , fixing of shackle , fixing of aluminium knob , fixing of open type fuse unit , fixing of ht las (3 nos.) , fixing of lt las (3 nos.) , fixing of lt capacitor , paving and stringing of conductors of sizes upto 7/2.59 mm acsr or other equivalent conductor , paving and stringing of conductors ofabove7/2.59 mm acsr or other equivalent conductor upto 7/3.35mm acsr or other equivalent conductor , erection of distribution transformer structure complete as per tneb standard including painting, feeders arrangrment, colour washing of rcc poles etc.. fixing of poles type to be unit ht / lt las and jumpering 3 nos earth pits with earth trough except erection of distribution transformer. , erection of distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa. , (i) upto 25 kva distribution transformer / metering set. , (ii) above 25 kva to 100 kva , (iii) above 100 kva to 250 kva , (iv) 500 kva and above , erection of 11 kv single pole structure including erection of dt complete without centre support , erection of 11 kv single pole structure including erection of dt complete with centre support , erection of dp structure with stay as per tneb standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., , (i) with 11 kv ab switch using all types of poles of size 9.14 m and above length , erection of single pole dp with completeand with single earth , concreting with 1:4:8 mix using 40 mm jelly including curing(material + labour) , (i) mass concreting of poles , (ii) sleeveconcreting , (iii) stay concreting , (i) earthing of poles with gi wires 4 or 6 swg by coil earthing , loading or unloading of distribution transformer , (i) upto 100 kva , (ii) above 100 kva and upto 500 kva , (iii) metering set of all ratios , loading of various sizes of poles , (i) rec, rcc, psc pole upto 8.00 m length , (ii) all rec, rcc pole above 8.00 m length , (iii) metal poles all sizes , unloading of various sizes of poles , (i) rec, rcc, psc pole upto 8.00 m length , (ii) all rec, rcc pole above 8.00 m length , (iii) metal poles all sizes , loading of conductor , unloading of conductor , loading / unloading of iron & steel , loading / unloading of oil , loading / unloading of line materials , loading / unloading of 11 kv strain disc , loading / unloading of lt pin insulator shackle, guy shackle, lt pin, metal parts, ht pin etc., , provision of guarding with two numbers earth pits excluding stay set erection , (i) flat guarding with earth pit , (ii) split neutral , transportation charges: , transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) , (i) for a lead upto 5 km , (ii) above 5 km of lead of every km , transport of metal pole of all sizes by head loads in hill areas from road side to pole pit location , (i) upto 1 km , (ii) above 1 km per each km , transporting of conductors of all sizes from road side to pit locations upto one km of conductor , (i) transporting of distribution transformer / line materials from stores to office / site upto 10 km distance by engaging 1 ton capacity minidor (lorry) , (ii) above 10 km , dismantling charges , dismantling of rcc, rec, psc & metal pole of all sizes including the closing of the pit , for breaking the mass concrete of all supports , dismantling of stay set complete , (i) including stay rod , (ii) without stay rod , dismantling of conductor ofupto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils , dismantling of conductor ofabove 7/3.35 including transporting the conductors to the nearest road side and stocking in coils , dismantling of transformer structure materials complete set and transporting the same from the location to the road side , dismantling of cross arm clamps ti fitting hardwares, insulators etc., , dismantling of h.t/l.t. t.i. fitting , dismantling of 3ph x arm , dismantling of 1ph x arm , dismantling of aluminium knob , dismantling of lt shackle with mp , dismantling of lt pin with insulator , dismantling of lt open type , dismantling of guarding cross arm , dismantling of tapping channel x arm , dismantling of 11kv pin with insulator , dismantling of 11kv composite disc with mp , releasing and erection 1 ph sc wire [during conductor or support change] , releasing and erection 3 ph sc wire [during conductor or support change] , destruction of pole concreting at site , retrieving grill from deteriorated rcc pole , engaging crane per hour (for handling of poles, metering set,dt etc) , engaging jcb per hour (for extension works & maintenance works etc) , manufacturing / altering of clamps , drilling of holes in the structure materials clamps etc., , ab switch or open type side arm stud, cutting and drilling holes , clearing of branches / trees with jcb/leveling of ground using bul dozer , sub total , epf @ 13% , esi @ 3.25% , sgst % , cgst % , igst %...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33213431 rdss scheme work contract for erection work of ht lt lines and dt structure with dts etc of kallapadi part i 11 kv feeder 110 33 11 kv pakkam ss under agriculture feeder segregation in pakkam section 1 excavation of pole pits / stay set: 2 for pole upto 8.0m length by using jcb / manual 3 for pole above 8.0m length by using jcb / manual 4 in hard soil ( common to all size of poles ) 5 in rocky area ( common to all size of poles ) byblasting / manual 6 excavation of stay pit of 4.5 to 5 depth using jcb / manual 7 erection of poles and accessories 8 erection of rcc, rec, psc poles upto 8.00m length by using jcb / manual 9 erection of rcc, rec, psc poles above 8.00m length by using jcb / manual 10 erection of metal supports above 9m / rsj / rail pole / tubular pole 11 erection of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. 12 erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. 13 fixing of line materials 14 fixing of ht vcross arms3 1 / 2, 4 1 / 2 & 5 feet 15 fixing of lt 3 phase cross arm 16 fixing of lt single phase cross arm 17 fixing of ht / ltti fitting 18 fixing of ht pin insulators ( 11 / 22 / 33kv ) 19 fixing of lt pin insulators 20 fixing of ht 11kv stain disc 21 fixing of two tapping cross arm per cut point upto 33kv line including fixing of discs, insulators and jumpering etc 22 set right of all siizes of leaning poles 23 fixing of lt shackle 24 fixing of aluminium knob 25 paving and stringing of conductor 26 paving and stringing of conductors of sizes upto 7 / 2.59 mm acsr or other equivalent conductor 27 paving and stringing of conductors of sizes above 7 / 2.59 mm acsr or other equivalent conductor upto 7 / 3.35mm acsr 28 paving and stringing of conductors of sizes 7 / 4.09 mm acsr or other equivalent conductor 29 erection of distribution transformers: 30 erection of 11kv single pole structure including erection of dt complete without centre support 31 erection of dp structure: 32 erection of dp structure with stay as per tneb standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., 33 earthing 34 earthing of poles with gi wires 4 or 6 swg by coil earthing 35 loading / unloading charges 36 loading of dt upto 100kva 37 unloading of dt upto 100kva 38 loading of various size of rec, rcc, psc poles upto 8.0m length 39 loading of various size of rec, rcc, psc poles above 8.0m length 40 loading of metal poles of all sizes 41 unloading of various size of rec, rcc, psc poles upto 8.0m length 42 unloading of various size of rec, rcc, psc poles above 8.0m length 43 unloading of metal poles of all sizes 44 loading of conductor 45 unloading of conductor 46 loading of line material 47 unloading of line material 48 loading of 11 kv strain disc 49 unloading of 11 kv strain disc 50 loading of lt pin insulator shackle, guy shackle, lt pin, metal parts, ht pin etc., 51 unloading of lt pin insulator shackle, guy shackle, lt pin, metal parts, ht pin etc., 52 transportation charges 53 transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50km 54 transport of metal pole of all size by head loads in hill areas from road side to polepit locationupto 1km 55 transporting of conductors of all size from road side to pit locations upto 1 km of conductor 56 transporting of distribution transformer / line materials from stores to office / site upto 10km distance by engaging 1 ton capacity minidor ( lorry ) 57 dismandling of line materials 58 dismandling of rcc, rec, psc & metal poles of all sizes including the closing of pit 59 dismandling of stay set complete including stay rod 60 dismandling of conductor of upto 7 / 3.35 including transporting the conductor to the nearest road side and stocking in coils 61 guarding arrangements 62 provision of guarding with two numbers earth pits excludig stay set erection flat guarding with earth pit 63 painting: 64 numbering of poles including base painting and with cost of paint 65 painting of iron poles up to 36 ft length with double coats including cost of paint 66 painting of cement poles by distember coating including cost of distember 67 workshop charges : 68 manufacturing / altering of clamps 69 drilling of holes in the structure materials clamps etc. 70 ab switch or open type side arm stud, cutting and drilling holes. 71 manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe 72 general 73 jungle clearance such as kattu karuvai in the various area without uprooting 74 jungle clearance such as kattu karuvai in the various area with uprooting 75 clearing of tree brances of coconut tree 76 clearing of tree brances of neem, tamerined, country etc 77 leveling of ground using bul dozer 78 cleaaring of branches / trees with jcb 79 fencing of distribution transformer structure at road side fabrication and erection. ( including all materials ) 80 e.p.f. @13 % should be entered by the bidder 81 e.s.i. @3.25 % should be entered by the bidder 82 g.s.t. @18% should be entered by the bidder...

Ministry Of Coal - Tamil Nadu

33211259 bids are invited for crawler mounted dozers not less than of engine capacity 300 horse power (q3) total quantity : 12...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33030606 rate contract for erection work of ht, lt lines and distribution transformer structure with dt’s etc., of ex. a.k. mottur 11kv feeder at matrapalli 33 / 11kvss under agriculture feeder segregation ofrdssscheme in westtirupathur, west tirupathur sub division of tirupathur division of tirupathur edc 2 for pole upto 8.0m length by using jcb / manual 3 for pole above 8.0m length by using jcb / manual 4 in hard soil ( common to all size of poles ) 5 in rocky area ( common to all size of poles ) byblasting / manual 6 excavation of stay pit of 4.5 to 5 depth using jcb / manual 7 erection of poles and accessories 8 erection of rcc, rec, psc poles upto 8.00m length by using jcb / manual 9 erection of rcc, rec, psc poles above 8.00m length by using jcb / manual 10 erection of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. 11 fixing of line materials 12 fixing of ht vcross arms3 1 / 2, 4 1 / 2 & 5 feet 13 fixing of lt 3 phase cross arm 14 fixing of lt single phase cross arm 15 fixing of ht / ltti fitting 16 fixing of ht pin insulators ( 11 / 22 / 33kv ) 17 fixing of lt pin insulators 18 fixing of ht 11kv stain disc 19 fixing of two tapping cross arm per cut point upto 33kv line including fixing of discs, insulators and jumpering etc 20 set right of all siizes of leaning poles 21 fixing of lt shackle 22 fixing of aluminium knob 23 paving and stringing of conductor 24 paving and stringing of conductors of sizes upto 7 / 2.59 mm acsr or other equivalent conductor 25 paving and stringing of conductors of sizes above 7 / 2.59 mm acsr or other equivalent conductor upto 7 / 3.35mm acsr 26 erection of distribution transformers: 27 erection of 11kv single pole structure including erection of dt complete without centre support 28 concreting works 29 concreting with 1:4:8 mix using 40mm jelly including curing ( material +labour ) mass concreting of poles 30 stay concreting 31 earthing 32 earthing of poles with gi wires 4 or 6 swg by coil earthing 33 loading / unloading charges 34 loading of dt upto 100kva 35 unloading of dt upto 100kva 36 loading of various size of rec, rcc, psc poles upto 8.0m length 37 loading of various size of rec, rcc, psc poles above 8.0m length 38 unloading of various size of rec, rcc, psc poles upto 8.0m length 39 unloading of various size of rec, rcc, psc poles above 8.0m length 40 loading of conductor 41 unloading of conductor 42 loading of line material 43 unloading of line material 44 loading of 11 kv strain disc 45 unloading of 11 kv strain disc 46 loading of lt pin insulator shackle, guy shackle, lt pin, metal parts, ht pin etc., 47 unloading of lt pin insulator shackle, guy shackle, lt pin, metal parts, ht pin etc., 48 transportation charges 49 transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50km 50 transport of metal pole of all size by head loads in hill areas from road side to polepit locationupto 1km 51 transporting of conductors of all size from road side to pit locations upto 1 km of conductor 52 transporting of distribution transformer / line materials from stores to office / site upto 10km distance by engaging 1 ton capacity minidor ( lorry ) 53 dismandling of line materials 54 dismandling of rcc, rec, psc & metal poles of all sizes including the closing of pit 55 dismandling of conductor of upto 7 / 3.35 including transporting the conductor to the nearest road side and stocking in coils 56 dismandling of cross arm clamps, ti fittings hardwares, insulators etc. 57 painting: 58 numbering of poles including base painting and with cost of paint 59 painting of cement poles by distember coating including cost of distember 60 workshop charges : 61 manufacturing / altering of clamps 62 drilling of holes in the structure materials clamps etc. 63 ab switch or open type side arm stud, cutting and drilling holes. 64 manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe 65 general 66 jungle clearance such as kattu karuvai in the various area without uprooting 67 jungle clearance such as kattu karuvai in the various area with uprooting 68 clearing of tree brances of coconut tree 69 clearing of tree brances of neem, tamerined, country etc 70 leveling of ground using bul dozer 71 cleaaring of branches / trees with jcb 72 fencing of distribution transformer structure at road side fabrication and erection. ( including all materials ) ...

Southern Railway - Tamil Nadu

32845925 auction sale of 98326030 condemned and unserviceable tractor with dozer ( without batteries, radiator fan, self starting motor ) . rc book not available. as is where is condition. rate per number should be quoted. total weight 4780 kgs approximately for one number....

Corporation Of Chennai - Tamil Nadu

32523242 regulating the stored garbage disposal (using dozer) in kodungaiyur dumping ground in division 37, unit 09, zone iv z.o. iv.c.no.b3/0086/2022 regulating the stored garbage disposal (using dozer) in kodungaiyur dumping ground in division 37, unit 09, zone iv => limited...

Chennai Petroleum Corporation Limited - Tamil Nadu

32513531 dismantling of building structurals at cpcls cbr refinery premises dismantling of building and structurals at cpcls cbr refinery premises and loading bays ug vessels and lshs tanks at iocls cbmt muttam terminal and segregation of debris , part a dismantling works in cbr refinery & cbmt muttam terminal , hrd/ training center at cbr , association building with adjacent toilet bldg , plumber shed , contractors temoporary shed east of raw fire water reservoir , aaqms building 3 nos (gsu, uoc, watch tower 9 east of bullets) , operator cabin 3 nos.(p&u, cdu, lpg loading gantry) , warehouse including roof structurals , cement godown , diesel bunk in between gate 1 & gate 2 , eil/projects building , storage shed 2 nos.(near road m& 6 junction & near road 7 & e junction) , additional raw water reservoir , rco tank dyke wall , dismantling of lshs at cbmt , dismantling of rotary equipment at cbmt , dismantling of all pipeline at cbmt , dismantling and demolition of loading bays , part b segregation of debris/ scrap & shifting to scrap yard , supply of tractor breaker , tractor dozer , tracked mounted tractor with breaker/grapple/augur/crusher , jaw cum back hoe (jcb) , jcb with breaker , tipper lorry , tractor trailer , tractor with 20 feet trailer , tractor with 40 feet trailer , hydra , highly skilled workmen , semi skilled workmen...

Ministry Of Coal - Tamil Nadu

32494441 bids are invited for part no 778ax92197 , bearing for beml bh 35dumper. part no.985ax95724 , gasket kit, cy. headassy. part no.10z9900048 , transmission pumpassembly part no.125hm01004 , steering pump assyfor beml make d155 dozer part no.125hm01029 ,hydraulic pump assembly part no. 125hm01037 , bd155torque converter assy. bearing kit partno.125zz00538 , air filter part no.376ai91104 , brakelining kit part no.376ax91631 , transmision oil filterelement part no.376tm03029 , element hyd.oil filterpart no.376hs02035 , corner tooth lh for bucket inbl200 1 wheel loader part no.375ll31575 , cornertooth rh for bucket in bl200 1 wheel loader partno.375ll31583 , tooth for bucket in bl200 1 wheelloader part no.375ll31567 , bolt for tooth fittingin bl200 1 wheel loader part no.375ll11008 , nutfor tooth fitting in bl200 1 wheel loader partno.cfn4311422 , hose assy part no.456ph04071 , hoseassembly part no.456ph04103 , hose assembly partno.456ph04022 , hose assy part no.456ph04047 , hoseassy, hyd. piping part no.456ph04063 , brake assy partno.376ax91623 , rear axle assembly for bl200 1wheel loader part no.376ax02003. , packing, trackassembly part no.171tf61428 , ring back up, trackassembly part no.171tf61436 , seal dust partno.0701621400 , ring back be700 backhoe track assy.part no.171tf61411 , packing part no.2093015210 ,ring back up idler cushion 2 2 part no.chs02 05140 ,seal dust part no.chs1001008 , bushing be700 partno.csb0201035proprietary spares for maintenance of beml make fm total quantity : 670...

Chennai Petroleum Corporation Limited - Tamil Nadu

32450957 disposal of surplus earth debris from manali refinery of cpcl to amullaivoyal / vaikkadu village ( part b ) disposal of surplus earth debris from manali refinery of cpcl to amullaivoyal / vaikkadu village ( part b ) , note: the following guidelines to be strictly followed during execution of work : 1.truck / tipper / jcb / poclain / dozer / tractor or any other vehicles engaged for disposal of surplus earth / debris / muck etc.shall have valid registration certificate / permit documents. 2. the drivers / operators of vehicles / machinery i.e. truck / tipper / jcb / poclain / dozer or any other heavy vehicles / machinery engaged for disposal of surplus earth / debris / muck etc. shall possess valid heavy vehicle driving license. 3. ppe / safety norms of cpcl shall be followed strictly by the contractor at loading point in cpcl refinery premises / etp / ttp and at unloading / disposal site at cpcl land in amullaivoyal / vaikkadu villages. 4. the contractor shall collect the dispatch slip book from cpcl. 5. loading of surplus earth / debris / muck / concrete & brick debris etc. shall be carried out by the contractor with valid work permit from cpcl. 6. the contractor shall obtain clearance for each trip of loading in dispatch slip from cpcl. 7. contractor shall obtain cisf witness signature at the time of loading in cpcl premises. 8. dispatch slip shall be signed and stamped by the cisf at cpcl gate while leaving refinery / etp / ttp premises. 9. vehicle shall be allowed to enter amullaivoyal gate after signing the gate entry register by the security person deployed by cpcl admin. 10. after unloading at amullaivoyal, the dispatch slip and unloading record slip of cpcl shall be signed by the security person deployed by admin, truck driver, supervisor of contractor and authorised representative from project civil. 11. next day loading permit shall be issued after submission of previous day dispatch slips to cpcl. 12. cpcl shall maintain the records of dispatch slips & unloading record slip for billing purpose. 13. cpcl will arrange to take photos at amullaivoyal / vaikkadu village site during unloading of each and every tipper to register date and time. 14.all the formats will be shared with the successful contractor on award of work. , transporting & disposing the surplus earth, concrete debris, rebar scraps including shrubs and vegetations from construction areato the designated area ( amullaivoyal / vaikkadu village ) outside the refinery premises up to a lead of 7 km including re excavating the deposited soil excavated earlier & stacked, transportation, loading, unloading, laying at all depths & heights, stackingcomplete with all liftsusing mechanical means ( hydraulic excavators / trucks ) / manuallyas directedby engineer in charge.minimum 8 nos.of truck to be mobilised at site daily as instructed by eic. ( note: the payment shall be made on quantities, measured on truck basis with 30% deductions for voids ) , supply of backhoe loaders, trenchers etc. like jcbon hire basis including fuel / oil / lubricantsfor collecting the debris and dumping it by excavating pits / spreading at designated places, levelling both areas ( viz., from where the earth is transported and where it is deposited ) to required levels and slopes. the quoted rate should include mobilization, operator crews / driver cost, loading, transporting, unloading, tools, tackles etc., as directed by the engineer in charge. , same as sl. no. 30 above, but for supply of poclain ( minimum pc 200 ) , same as sl. no. 30 above, but for supply of crawler mounted dozzer , supply of unskilledlabourto carry out petty works not assessable for measurements / minor repair works, on day to day basis. the rates shall include esi, pf, payroll cost and allowances, fringe benefits, overhead supervision, profits, personal protective equipments andhand tools....

Chennai Petroleum Corporation Limited - Tamil Nadu

32450956 disposal of surplus earth debris from manali refinery of cpcl to amullaivoyal / vaikkadu village ( part a ) disposal of surplus earth debris from manali refinery of cpcl to amullaivoyal / vaikkadu village ( part a ) , note: the following guidelines to be strictly followed during execution of work : 1.truck / tipper / jcb / poclain / dozer / tractor or any other vehicles engaged for disposal of surplus earth / debris / muck etc.shall have valid registration certificate / permit documents. 2. the drivers / operators of vehicles / machinery i.e. truck / tipper / jcb / poclain / dozer or any other heavy vehicles / machinery engaged for disposal of surplus earth / debris / muck etc. shall possess valid heavy vehicle driving license. 3. ppe / safety norms of cpcl shall be followed strictly by the contractor at loading point in cpcl refinery premises / etp / ttp and at unloading / disposal site at cpcl land in amullaivoyal / vaikkadu villages. 4. the contractor shall collect the dispatch slip book from cpcl. 5. loading of surplus earth / debris / muck / concrete & brick debris etc. shall be carried out by the contractor with valid work permit from cpcl. 6. the contractor shall obtain clearance for each trip of loading in dispatch slip from cpcl. 7. contractor shall obtain cisf witness signature at the time of loading in cpcl premises. 8. dispatch slip shall be signed and stamped by the cisf at cpcl gate while leaving refinery / etp / ttp premises. 9. vehicle shall be allowed to enter amullaivoyal gate after signing the gate entry register by the security person deployed by cpcl admin. 10. after unloading at amullaivoyal, the dispatch slip and unloading record slip of cpcl shall be signed by the security person deployed by admin, truck driver, supervisor of contractor and authorised representative from project civil. 11. next day loading permit shall be issued after submission of previous day dispatch slips to cpcl. 12. cpcl shall maintain the records of dispatch slips & unloading record slip for billing purpose. 13. cpcl will arrange to take photos at amullaivoyal / vaikkadu village site during unloading of each and every tipper to register date and time. 14.all the formats will be shared with the successful contractor on award of work. , transporting & disposing the surplus earth, concrete debris, rebar scraps including shrubs and vegetations from construction areato the designated area ( amullaivoyal / vaikkadu village ) outside the refinery premises up to a lead of 7 km including re excavating the deposited soil excavated earlier & stacked, transportation, loading, unloading, laying at all depths & heights, stackingcomplete with all liftsusing mechanical means ( hydraulic excavators / trucks ) / manuallyas directedby engineer in charge.minimum 8 nos.of truck to be mobilised at site daily as instructed by eic. ( note: the payment shall be made on quantities, measured on truck basis with 30% deductions for voids ) , supply of backhoe loaders, trenchers etc. like jcbon hire basis including fuel / oil / lubricantsfor collecting the debris and dumping it by excavating pits / spreading at designated places, levelling both areas ( viz., from where the earth is transported and where it is deposited ) to required levels and slopes. the quoted rate should include mobilization, operator crews / driver cost, loading, transporting, unloading, tools, tackles etc., as directed by the engineer in charge. , same as sl. no. 30 above, but for supply of poclain ( minimum pc 200 ) , same as sl. no. 30 above, but for supply of crawler mounted dozzer , supply of unskilledlabourto carry out petty works not assessable for measurements / minor repair works, on day to day basis. the rates shall include esi, pf, payroll cost and allowances, fringe benefits, overhead supervision, profits, personal protective equipments andhand tools....

Chennai Petroleum Corporation Limited - Tamil Nadu

32450955 disposal of surplus earth debris from manali refinery of cpcl to amullaivoyal / vaikkadu village ( part c ) disposal of surplus earth debris from manali refinery of cpcl to amullaivoyal / vaikkadu village ( part c ) , note: the following guidelines to be strictly followed during execution of work : 1.truck / tipper / jcb / poclain / dozer / tractor or any other vehicles engaged for disposal of surplus earth / debris / muck etc.shall have valid registration certificate / permit documents. 2. the drivers / operators of vehicles / machinery i.e. truck / tipper / jcb / poclain / dozer or any other heavy vehicles / machinery engaged for disposal of surplus earth / debris / muck etc. shall possess valid heavy vehicle driving license. 3. ppe / safety norms of cpcl shall be followed strictly by the contractor at loading point in cpcl refinery premises / etp / ttp and at unloading / disposal site at cpcl land in amullaivoyal / vaikkadu villages. 4. the contractor shall collect the dispatch slip book from cpcl. 5. loading of surplus earth / debris / muck / concrete & brick debris etc. shall be carried out by the contractor with valid work permit from cpcl. 6. the contractor shall obtain clearance for each trip of loading in dispatch slip from cpcl. 7. contractor shall obtain cisf witness signature at the time of loading in cpcl premises. 8. dispatch slip shall be signed and stamped by the cisf at cpcl gate while leaving refinery / etp / ttp premises. 9. vehicle shall be allowed to enter amullaivoyal gate after signing the gate entry register by the security person deployed by cpcl admin. 10. after unloading at amullaivoyal, the dispatch slip and unloading record slip of cpcl shall be signed by the security person deployed by admin, truck driver, supervisor of contractor and authorised representative from project civil. 11. next day loading permit shall be issued after submission of previous day dispatch slips to cpcl. 12. cpcl shall maintain the records of dispatch slips & unloading record slip for billing purpose. 13. cpcl will arrange to take photos at amullaivoyal / vaikkadu village site during unloading of each and every tipper to register date and time. 14.all the formats will be shared with the successful contractor on award of work. , transporting & disposing the surplus earth, concrete debris, rebar scraps including shrubs and vegetations from construction areato the designated area ( amullaivoyal / vaikkadu village ) outside the refinery premises up to a lead of 7 km including re excavating the deposited soil excavated earlier & stacked, transportation, loading, unloading, laying at all depths & heights, stackingcomplete with all liftsusing mechanical means ( hydraulic excavators / trucks ) / manuallyas directedby engineer in charge.minimum 8 nos.of truck to be mobilised at site daily as instructed by eic. ( note: the payment shall be made on quantities, measured on truck basis with 30% deductions for voids ) , supply of backhoe loaders, trenchers etc. like jcbon hire basis including fuel / oil / lubricantsfor collecting the debris and dumping it by excavating pits / spreading at designated places, levelling both areas ( viz., from where the earth is transported and where it is deposited ) to required levels and slopes. the quoted rate should include mobilization, operator crews / driver cost, loading, transporting, unloading, tools, tackles etc., as directed by the engineer in charge. , same as sl. no. 30 above, but for supply of poclain ( minimum pc 200 ) , same as sl. no. 30 above, but for supply of crawler mounted dozzer , supply of unskilledlabourto carry out petty works not assessable for measurements / minor repair works, on day to day basis. the rates shall include esi, pf, payroll cost and allowances, fringe benefits, overhead supervision, profits, personal protective equipments andhand tools....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

32301894 mtps ii chp ii charges for operation of conveyors 7 / 1, 7 / 2 ( drivehouse ) & 9 / 1, 9 / 2 ( drive house ) , conveyor 8a / 8b, and scr machines i &ii ( mechanical aspects ) in coordination with chp control room, dozer operation for ramming and coal dozing work and routine andpreventive maintenance of dust suppression pumps in coal handlingplant ii as per engineer in charge instruction for a period of 180 days from the date of commencement of work....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

32250067 elecy cedc / north / coimbatore works contract for execution of various works under rdss schmes in seeranaicken palayam sub division of s.n.palayam division excavation of pole pits / stay set: , for pole upto 8.00m length by using jcb / manual , for pole above 8.00m length by using jcb / manual , in hard soil ( common to all size of poles ) , in rocky area ( common to all size of poles ) by blasting / manual , excavation of stay pit of 4.5 to 5 depth using jcb / manual , excavation of stay pit in hard rock soil , excavation & back filling of stay pit per location hard rock requires blasting , excavation & back filling of stay pit per location hard rock without blasting , excavation & back filling of stay pit per location medium rock and dense medium rock requires blasting , erection of poles and accessories , erection of rcc, rec, psc poles upto 8.00m length by using crane / manual , erection of rcc, rec, psc poles above 8.00m length by using crane / manual , erection of metal supports above 9m / rsj / rail pole / tubular poles , erection of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. , erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. , erection of stay set complete in the rock area by blasting , replacement of stay rod only. ( including stay pit excavation & refilling & erection ) , replacement of guy shackle only in existing stay , fixing of line materials , v cross arm 3.5feet , v cross arm4.5 feet , v cross arm5.0 feet , fixing of lt s phase cross arm , fixing of lt 3 phase cross arm , fixing of ht / lt ti fitting , fixing of ht pin insulator with pin 11 kv , fixing of ht pin insulator with pin 22 kv , fixing of ht pin insulator with pin 33 kv , fixing of lt pin insulator , fixing of ht strain disc 11 kv , fixing of ht strain disc 22 kv , fixing of ht strain disc 33 kv , fixing of two tapping cross arm per cut point upto 33 kv line including fixing of discs, insulators and jumpering etc.. , set right of all sizes of leaning poles , fixing of shackle , fixing of aluminium knob , fixing of ht las ( 3 nos. ) , fixing of lt las ( 3 nos. ) , double channel x arm , guarding cross arm , tapping channel cross arm , fixing of open type fuse unit , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , fixing of lt capacitor , erection of centre rotating switch ab switch complete , set right of all sizes of leaning poles , resagging of lines for all sizes at cutpoint location per wire / span , intergrater dt metering arrangements / whole current meter , erection / dismantling metering set 11 kv / 22 kv , stringing of conductors: , paving and stringing of conductors of sizes upto 7 / 2.59 mm acsr or other equivalent conductor , paving and stringing of conductors ofabove7 / 2.59 mm acsr or other equivalent conductor upto 7 / 3.35mm acsr or other equivalent conductor , paving and stringing of conductors of one run of pvc cable line of all sizes with gi wire and reel insulator. , paving and stringing of conductors of7 / 4.09mm acsr or other equivalent conductor , paving and stringing of conductors of7 / 4.72 mm dog conductor or other equivalent conductor , releasing and reerection ( resagging ) of one run of all sizes of conductor , erection of distribution transformers: , erection of distribution transformer structure complete as per tneb standard including painting, feeders arrangrment, colour washing of rcc poles etc.. fixing of poles type to be unit ht / lt las and jumpering 3 nos earth pits with earth trough except erection of distribution transformer. ( double pole structure with 10 feet centre ) , erection of distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa. , ( i ) upto 25 kva distribution transformer / metering set. , ( ii ) above 25 kva to 100 kva , ( iii ) above 100 kva to 250 kva , ( iv ) 500 kva and above , ( v ) failed dt replacement below 100 kva , ( vi ) failed dt replacement 100 kva and above , erection of 11 kv single pole structure including erection of dt complete without centre support. , erection of 11 kv single pole structure including erection of dt complete with centre support . , erection of dp structure: , erection of dp structure with stay as per tneb standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., , ( i ) with 11 kv ab switch using all types of poles of size 9.14 m and above length , ( i ) with 22 / 33 kv ab switch using all types of poles of size 9.14 m and above length , erection of single pole dp with completeand with single earth , concreting works: , concreting with 1:4:8 mix using 40 mm jelly including curing ( material + labour ) , ( i ) mass concreting of poles , ( ii ) sleeveconcreting , ( iii ) stay concreting , earthing: , ( i ) earthing of poles with gi wires 4 or 6 swg by coil earthing , ( ii ) provision of spike including earthing arrangement , ( iii ) pipe earthing including excavation of earth pit and fixing earth pipe 3 m length , ( iv ) replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination , ( v ) replacement of corroded earth pipe , loading and unloading charges: , loading or unloading of distribution transformer , ( i ) upto 100 kva , ( ii ) above 100 kva and upto 500 kva , ( iii ) metering set of all ratios , loading or unloading of various sizes of poles , ( i ) rec, rcc, psc pole upto 8.00 m length , ( ii ) all rec, rcc pole above 8.00 m length , ( iii ) metal poles all sizes , loading of conductor , unloading of conductor , loading / unloading of iron & steel , loading / unloading of oil , loading / unloading of line materials , loading / unloading of 11 kv strain disc , loading / unloading of lt pin insulator shackle, guy shackle, lt pin, metal parts, ht pin etc., , loading / unloading of meters , ( i ) single phase meter , ( ii ) three phase meter , guarding arrangement , provision of guarding with two numbers earth pits excluding stay set erection , ( i ) flat guarding with earth pit , ( ii ) split neutral , transportation charges: , transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50 km , transportation of all type of poles by bullock cart or other vehicle ( for all sizes of poles including loading and unloading ) , ( i ) for a lead upto 5 km , ( ii ) above 5 km of lead of every km , transport of metal pole of all sizes by head loads in hill areas from road side to pole pit location , ( i ) upto 1 km , ( ii ) above 1 km per each km , transporting of conductors of all sizes from road side to pit locations upto one km of conductor , ( i ) transporting of distribution transformer / line materials from stores to office / site upto 10 km distance by engaging 1 ton capacity minidor ( lorry ) , ( ii ) above 10 km , dismantling charges , dismantling of rcc, rec, psc & metal pole of all sizes including the closing of the pit , for breaking the mass concrete of all supports , dismantling of line materials , dismantling of double channel x arm , dismantling of guarding cross arm , dismantling oftapping channel x arm , dismantling of 11kv pin with insulator , dismantling of 11kv composite disc with mp , dismantling of 22kv pin with insulator , dismantling of 22kv composite disc with mp , dismantling of 33 kv pininsulator , dismantling of 33 kv disc , dismantling of 5 v x arm , dismantling of 1372 mm ( 46 ) v x arm , dismantling of 1068 mm ( 36 ) v x arm , dismantling of h.t / l.t. t.i. fitting , dismantling of3ph x arm , dismantling of1ph x arm , dismantling of aluminium knob , dismantling of lt shackle with mp , dismantling of lt pin with insulator , dismantling of lt open type , dismantling of top channel , dismantling of belting channel , dismantling of bed channel , dismantling of metering set 11 kv / 22 kv / 33 kv , dismantling of dt below 200 kva , dismantling of dt 200 kva & above but below 500 kva , dismantling of dt 500 kva , dismantling of knob , dismantling of ht las ( 3 nos ) , dismantling of lt las ( 3 nos ) , dismantling of stay set complete , ( i ) including stay rod , ( ii ) without stay rod , dismantling of conductor ofupto 7 / 3.35 including transporting the conductors to the nearest road side and stocking in coils , dismantling of conductor ofabove 7 / 3.35 including transporting the conductors to the nearest road side and stocking in coils , dismantling of transformer structure materials complete set and transporting the same from the location to the road side , dismantling of cross arm clamps ti fitting hardwares, insulators etc., , painting: , painting of distribution transformer of all capacities ( paint to be supplied by the board ) including cleaning of dt , numbering of poles including base painting and with cost of paint , painting of iron poles up to 36 ft length with double coats including cost of paint , painting of iron poles up to 40 ft 200 / 100 length with double coats including cost of paint , painting of cement poles by distember coating including cost of distember , painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details ( items 1 to 6 brush to be owned by the contractor ) ( paint to be supplied by department ) , service connection details painting , miscellaneous works , fixing and dismantling of single phase meter , fixing and dismantling of three phase meter , releasing and erection 1 ph sc wire [ during conductor or support change ] , releasing and erection 3 ph sc wire [ during conductor or support change ] , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , re earthing of structure completely , provision of street light, switching arrangement including fixing of meter, wiring & service board etc., , fixing of street light , destruction of pole concreting at site , retrieving grill from deteriorated rcc pole , fixing of modem including accessories , cleaning of rmu , cleaning of ring fencing , knitting of chair including supply materials. , workshop charges: , manufacturing / altering of clamps , drilling of holes in the structure materials clamps etc., , ab switch or open type side arm stud, cutting and drilling holes , manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe , general: , numbering of poles including cost of paint , painting of iron poles up to 36 ft length with double coats including cost of paint , painting of iron poles up to 40 ft 200 / 100 length with double coats including cost of paint , removing weed in substation yard / office premises , bush clearance out side substation yard / office premises ( light ) , jungle clearance such as kattu karuvai in the various area without uprooting , jungle clearance such as kattu karuvai in the various area with uprooting , clearing of tree braches of coconut trees , clearing of tree braches of neem, tamarind, country wood etc , leveling of ground using bul dozer , clearing of branches / trees with jcb , fencing of distribution transformer structure at road side fabrication and erection. ( including all materials ) ...

Chennai Petroleum Corporation Limited - Tamil Nadu

32032763 collection segregation and removal of metallic scrap from various areas of refinery and transporting to scrap yard at cpcl manali refinery collection segregation and removal of metallic scrap from various areas of refinery and transporting to scrap yard at cpcl manali refinery , removal of metallic scrap from refinery , collection, segregating and removal of metallic scrap from refinery 3 process units, refinery 3 offsite, nccp / cpp and r&d areas and surroundings, and transporting to scrap yard for 1st yaer , charges for collection and removal of all types of metallic scrapsfrom inside process units and p&u area and transport to scrap yard using contractor truck / tractor and trailer, after weighment, as per scope of work &eics instructions. , providing un skilled manpower in addition at the discretion of the engineer for carrying out collection and removal of metallic and unwanted materials from the platforms at all elevations and inside the plant areas as per requirement and as and when assigned by eic. , hire charges for providing wheeled hydraulic excavator with attachments backfill ( or dozer ) blade ( 11 18 tonnes ) jcb with experienced operator and fuel ( horking hours 8 hrs shift per day ) for removal of hardened sulphur from yard from the plant 210 ( sru ) and / or for earth work excavation jobs as per scope of work & eic instructions. ( unit of measurement day = hire charges per day ) , hire charges for providing articulated loader bobcat vehicle with experienced operator and fuel ( horking hours 8 hrs shift per day ) to carryout the collection and removal of scrap and unwanted materials from the plant area related jobs as per the instrucions of eic and scope of work at refinery 3, cpcl manali. , hire charges for tractor with trolley for collection of non metallic scrap and debris and transport to designated place as per sow, terms & conditions and eic instructions. , collection, segregating and removal of metallic scrap from refinery 3 process units, refinery 3 offsite, nccp / cpp and r&d areas and surroundings, and transporting to scrap yard for iind yaer< / > , charges for collection and removal of all types of metallic scrapsfrom inside process units and p&u area and transport to scrap yard using contractor truck / tractor and trailer, after weighment, as per scope of work &eics instructions. , providing un skilled manpower in addition at the discretion of the engineer for carrying out collection and removal of metallic and unwanted materials from the platforms at all elevations and inside the plant areas as per requirement and as and when assigned by eic. , hire charges for providing wheeled hydraulic excavator with attachments backfill ( or dozer ) blade ( 11 18 tonnes ) jcb with experienced operator and fuel ( horking hours 8 hrs shift per day ) for removal of hardened sulphur from yard from the plant 210 ( sru ) and / or for earth work excavation jobs as per scope of work & eic instructions. ( unit of measurement day = hire charges per day ) , hire charges for providing articulated loader bobcat vehicle with experienced operator and fuel ( horking hours 8 hrs shift per day ) to carryout the collection and removal of scrap and unwanted materials from the plant area related jobs as per the instrucions of eic and scope of work at refinery 3, cpcl manali. , hire charges for tractor with trolley for collection of non metallic scrap and debris and transport to designated place as per sow, terms & conditions and eic instructions. => limited...

Ministry Of Coal - Tamil Nadu

31969642 bids are invited for ‘ o’ rings for beml, bd155 model dozers (37 items) (q3) total quantity : 1...