38467060
supply of yellow empire tape and white cotton tape supply of 1000 nos of yellow empire tape and 1000nos of white cotton tape , supply of silicagel blue , 0.6kva ups , yellow empire tape , white cotton tape , pole pit for 9.0m and 9.14 m psc / rcc / all metal poles ( each pit ) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting / cheseling required [ specific approval should be obtained from concerned ee ] , stay pit , in ordinary soil [ 0.95 x 0.6 x 1.2m ] , semi rocky soil , stay pit in heavy rocky soil where blasting / cheseling reqiured [ specific approval should be obtained from concerned ee ] , erection of poles & stays ( including refilling of excavated earth ) , erection of 7.5m / 8.0m poles [ rcc / psc ] , erection of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. ( including stay pit excavation & refilling & erection ) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt / ht ti fitting , fixing of lt 3 ph x arm , fixing of 3 [ 1 / 2 ] v` x arm , fixing of4 [ 1 / 2 ] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc / polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [ including transport of condutor from road side to work spot ] per run , upto 7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , acsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , acsr 7 / 4.09 mm , above 7 / 4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit ] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [ double side earthing ] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [ including all materials ] . , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set ( 4 sets ) , mass concreting ( cement:sand:jelly supplied by the contractor ) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [ 2 nos channel ] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ ht side ] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [ two coat of red oxide ] all metal parts ( excluding cost of paint ) . , painting of stru. complete excluding dt [ one coat alu paint, excluding cost of paint ) , colour washing of 2 numbers structure pole [ excluding cost of distember / snowsem ] , painting name of ss at seating channel including paint. , painting of dt alone [ excluding painting ] with red oxide and double coating of aluminium paint. , dt metering arrangement ( without materials ) , erection of distribution transformer / dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [ black background and yellow letters ] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp / led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl / 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection / dismantling of metering set 11 kv / 22 kv / 33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5 / 8 , all size angles / channel above 5 / 8 , slot holes in flat / angles / channel upto 3 / 4 , slot holes in flat / angles / channel above 3 / 4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt [ pin point ] location , set right the leaning pole in both ht & lt [ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [ during conductor or support change ] , releasing and erection 3 ph sc wire [ during conductor or support change ] , destruction of pole concerting at site. , retrieving grill from detoriated pole [ grill separate from damaged pole ] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [ railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc / metal pole [ per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc / psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer / metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer / metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [ rcc / psc ] , dismantling of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt / ht ti fitting , dismantling of lt / ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3 [ 1 / 2 ] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc / polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7 / 4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...
Due Date : August 02, 2023
Tender Value : ₹ 10 Lakhs