Tamil Nadu Transmission Corporation Limited - Tamil Nadu

35074711 running contract for execution of works for agl and other improvement works for town velur ( part b ) subdivision excavation of pole pits / stay set: 2 loadingandunloadingofpolesupto 27 ( 8.0 m ) 3 transportingofpolesfromroadside topolepit upto 27 ( 8.0 m ) 4 excavationofpolepitupto27 ( 8.0 m ) pole 5 erectionof psc / rccpoles / metalpolesupto 8.00m. ( 27 ) 6 loadingandunloadingofpolesabove27 ( 8.0 m ) 7 transportingofpolesfromroadside topolepitabove27 ( 8.0 m ) 8 excavationofpolepitabove27 ( 8.0 m ) mtr pole psc / rcc / rsj pole 9 erectionof psc / rccpoles / metalpolesabove27 ( 8.0 m ) 10 labour charges for alteration of back clamps / stay clamps 11 drilling of hole in channel only 3 / 4 & 1 12 earthing of poles 13 fixing of ht v ( all types ) / channel / tapping / guardingcrossarms 14 fixingof lt 3 f crossarms 15 fixingof lt 1 fcross arms 16 fixingof ht / lttifittings 17 fixingofhtpininsulators 11 / 22 kv 18 fixingofht11 kvstraindisc. 19 fixingofltpininsulator 20 fixingofltshackle 21 fixingofaluminium knob 22 excavation & erectionofstayset4.5 to 5depth 23 paving of conductor, both ht / ltlines withacsr 7 / 3.35 & aaac 7 / 3.15 24 paving conductor, both ht / lt lines with acsr 7 / 2.59, 7 / 2.11& aaac7 / 2.50 25 transport of materials ( excl. loading and unloading charges ) below 8 kms 26 loading of materials 27 unloading of materials 28 clearing of branches of trees 29 re sagging acsr 7 / 3.35mm / aaac 7 / 3.15 mm rabbit conductor 30 re sagging acsr 7 / 2.59 / 7 / 2.11 and aaac 7 / 2.50mm conductor 31 erectionof open type fuse unit 32 loading or unloading of transformer upto 100 kva 33 erectionofnewtransformerall capacities ( with jumpering ) 34 dismantling of transformerall capacities 35 erectionof 2 pole transformerstructureincluding concreting ( except erectionoftransformer ) 36 dismantling of psc / rccpoles / metalpolesupto 8.00m. ( 27 ) 37 loadingandunloadingofdismantled polesupto8.00m. ( 27 ) 38 transportingofdismantled poles from pole pit toroad side upto ( 27 ) 39 dismantling of lt 3 f crossarms 40 dismantling of lt 1 fcross arms 41 dismantling ofltpininsulator 42 dismantling ofltshackle 43 dismantling of conductor both ht / ltlines with acsr 7 / 3.35 & aaac7 / 3.15 44 dismantling of conductor both ht / ltwith acsr7 / 2.59, 7 / 2.11& aaac7 / 2.50 45 transport of dismantled materials ( excl. loading and unloading ) below8 kms...

Tamil Nadu Transmission Corporation Limited - Tamil Nadu

35074678 running contract for execution of works for agl and other improvement works for town velur ( part a ) subdivision excavation of pole pits / stay set: 2 loadingandunloadingofpolesupto 27 ( 8.0 m ) 3 transportingofpolesfromroadside topolepit upto 27 ( 8.0 m ) 4 excavationofpolepitupto27 ( 8.0 m ) pole 5 erectionof psc / rccpoles / metalpolesupto 8.00m. ( 27 ) 6 loadingandunloadingofpolesabove27 ( 8.0 m ) 7 transportingofpolesfromroadside topolepitabove27 ( 8.0 m ) 8 excavationofpolepitabove27 ( 8.0 m ) mtr pole psc / rcc / rsj pole 9 erectionof psc / rccpoles / metalpolesabove27 ( 8.0 m ) 10 labour charges for alteration of back clamps / stay clamps 11 drilling of hole in channel only 3 / 4 & 1 12 hard rock without blasting ( where houses are located ) 13 earthing of poles 14 fixing of ht v ( all types ) / channel / tapping / guardingcrossarms 15 fixingof lt 3 f crossarms 16 fixingof lt 1 fcross arms 17 fixingof ht / lttifittings 18 fixingofhtpininsulators 11 / 22 kv 19 fixingofht22 kvstraindisc. 20 fixingofltpininsulator 21 fixingofltshackle 22 fixingofaluminium knob 23 excavation & erectionofstayset4.5 to 5depth 24 paving of conductor, both ht / ltlines withacsr 7 / 3.35 & aaac 7 / 3.15 25 paving conductor, both ht / lt lines with acsr 7 / 2.59, 7 / 2.11& aaac7 / 2.50 26 transport of materials ( excl. loading and unloading charges ) below 8 kms 27 loading of materials 28 unloading of materials 29 clearing of branches of trees 30 re sagging acsr 7 / 3.35mm / aaac 7 / 3.15 mm rabbit conductor 31 re sagging acsr 7 / 2.59 / 7 / 2.11 and aaac 7 / 2.50mm conductor 32 erectionof open type fuse unit 33 loading or unloading of transformer upto 100 kva 34 erectionofnewtransformerall capacities ( with jumpering ) 35 erectionof 2 pole transformerstructureincluding concreting ( except erectionoftransformer ) 36 erection of 1 pole transformer structureincluding concreting ( except erection of transformer ) 37 dismantling of psc / rccpoles / metalpolesupto 8.00m. ( 27 ) 38 loadingandunloadingofdismantled polesupto8.00m. ( 27 ) 39 transportingofdismantled poles from pole pit toroad side upto ( 27 ) 40 dismantling of ht v ( all types ) / channel / tapping / guardingcrossarms 41 dismantling of lt 3 f crossarms 42 dismantling of lt 1 fcross arms 43 dismantling of ht / lttifittings 44 dismantling ofhtpininsulators 11 / 22 kv 45 dismantling ofltpininsulator 46 dismantling ofaluminium knob 47 dismantling of conductor both ht / ltlines with acsr 7 / 3.35 & aaac7 / 3.15 48 dismantling of conductor both ht / ltwith acsr7 / 2.59, 7 / 2.11& aaac7 / 2.50...

Tamil Nadu Transmission Corporation Limited - Tamil Nadu

35074661 running contract for execution of works for agl and other improvement works for mohanur subdivision excavation of pole pits / stay set: 2 loadingandunloadingofpolesupto8.0 m / 27 3 transportingofpolesfromroadside topolepitincludingloadingandunloading ofpoles by using jcb or manualup to 100 m 4 excavationofpolepitupto27 ( 8.0 m ) pole by using jcb or manual 5 erectionof psc / rccpoles / metalpolesupto 8.00m. ( 27 ) 6 loadingandunloadingofpolesabove 8.0 m 7 transportingofpolesfromroadside topolepitincludingloadingandunloading ofpoles by using jcb or manualup to 100 m 8 excavationofpolepitabove 8.0 mtr pole psc / rcc / rsj pole 9 erectionof psc / rccpoles / metalpolesabove 8.00m 10 labour charges for alteration of back clamps / stay clamps to suit for the works 11 drilling of hole in channel only 3 / 4 & 1 12 fixing of ht v ( all types ) / channel / tapping / guardingcrossarms 13 fixingof lt 3 f crossarms 14 fixingof lt 1 fcross arms 15 fixingof ht / lttifittings 16 fixingofhtpininsulators 11 / 22 kv 17 fixingofht22 kvstraindisc. 18 fixingofltpininsulator 19 fixingofltshackle 20 fixingofaluminium knob 21 excavation & erectionofstaypit4.5 to 5depth 22 paving, stringing etc, both ht / ltlines withacsr 7 / 3.35 / aaac 3.15 23 paving, stringing etc.both ht / lt lines with acsr 7 / 2.59 / 7 / 2.11 / aaac 2.50 24 transportofpoles / materials / conductors andothermaterials ( excludingloading andunloadingcharges. ) below8kms ( plains ) 25 loading of materials 26 unloading of materials 27 erectionofstreetlightincluding fixurefitting 28 erectionofstreetlightservice 29 dismantling & erectionofstreetlightincluding fixurefitting 30 releasingofsingle phaseserviceand re fixing. 31 releasingof3 phaseserviceand ( upto 50 hp ) re fixing. 32 loading or unloading of transformer upto 100 kva 33 erectionofnewtransformerall capacities ( with jumpering ) 34 dismantling of transformerall capacities 35 erectionof 2 pole transformerstructureincluding concreting ( except erectionoftransformer ) 36 erection of 1 pole transformer structureincluding concreting ( except erection of transformer ) 37 clearing of branches of trees 38 dismantling of psc / rccpoles / metalpolesupto 8.00m. ( 27 ) 39 loadingandunloadingofdismantled polesupto8.0 m / 27 40 transportingofdismantled polesfrom pole pit toroadside 41 dismantling of lt 3 f crossarms 42 dismantling of lt 1 fcross arms 43 dismantling of ht / lttifittings 44 dismantling ofltpininsulator 45 dismantling ofltshackle 46 dismantling ofaluminium knob 47 dismantlingofstaysetcomplete 48 dismantling of conductor for both ht / lt lines with acsr 7 / 3.35 / aaac 3.15 49 dismantling of conductor both ht / ltwith acsr 7 / 2.59 7 / 2.11 / aaac 2.50 50 transport of dismantled materials ( excl. loading and unloading ) below8 kms...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

35055113 tender for works contract for kaspapettai section south / erode sub division of south / erode division excavationofpolepit size of 2x2x6 upto 27 pole by using jcb or manual 2 excavation of stay pit 4.5 to 5 by using jcb or manual 3 excavationofpolepit size above 8 mts psc / rcc / rsj pole by using jcb or manual 4 excavation of pit in hard rock requires without blasting ( where houses are located ) 5 erection of rcc poles / psc poles / metal poles upto 27 ( 8.0m ) pole by using jcb or manual 6 erection of rcc poles / psc poles / metal poles above 8 mtrspole by using jcb or manual 7 erection of rsj , rail and fabricated poles above 9.0m pole by using jcb or manual 8 erectionof stay set complete 9 fixingof ht v cross arms ( all types ) / channel cross arms / guarding cross arms 10 fixingof lt 3 phase cross arms 11 fixing of lt single phase ph x arm 12 fixing of ht / lt ti fittings 13 fixing of ht pin insulator 11 kv / 22 kv 14 fixing of ht pin insulator33 kv 15 fixing of ht 11kv strain disc 16 fixing of ht 22kv strain disc 17 fixing of lt pin insulators 18 fixing of lt shackle with mp 19 fixing of aluminium knob 20 earthing of pole with pin including burying , looping and binding 21 paving of conductor, stringing, binding, jumpering etc., complete for lines with acsr 7 / 4.09 mm 22 paving of conductor, stringing, binding, jumpering etc., complete for lines with acsr 7 / 3.35 mm or aaac 7 / 3.15 mm conductor 23 paving of conductor, stringing, binding, jumpering etc., complete for lines with acsr 7 / 2.59 mm or aaac 7 / 2.50mm conductor 24 erectionofdouble pole transformerstructure completeinclusive of following works excavation of pole pits sizing 2 x 2 x 6 ( 2*475 ) , erection of poles ( 2*550 ) , excavation of stay pits ( 4*390 ) and erection of stay set ( 4*210 ) , erection of structure materials ( top channel rs.250, bed channel rs.250, cross with stud for bed channel rs.120, belting angle rs.250 ) erection of ab switch ( rs.1000 ) , hg fuse ( rs.600 ) structure earthing complete ( rs.2100 ) , fixing of open type fuse units and feeder arrangements ( rs.900 ) , ht / lt las fixing ( rs.350 and rs.250 ) , provision of bus bar arrangement ( rs.500 ) , jumpering ( rs.400 ) fixing of support inculator angle and erection of of 3 nos pin insulators ( rs.200 ) ( all t&p suchas crowbars, siling, dshackle etc., that must be brought by the contractor ) ( labour for structure concreting, stay concreting, painting, fixing of name board / danger board, erection of transformer, transporting of transformer , fixing of dt meter , drilling of holes, cutting, welding, alteration of clamps if anyand provision of earth pit collars are separately given ) . 25 erection of double polestructure ( d.p ) inclusive of following works excavation of pole pits sizing 2 x 2 x 6 ( 2*475 ) , erection of poles ( 2*550 ) , excavation of stay pits ( 4*390 ) and erection of stay set ( 4*210 ) , erection of structure materials ( top channel rs.250 ) erection of ab switch ( rs.1000 ) , structure earthing complete ( rs.1500 ) , ht las fixing ( rs.350 ) , jumpering ( rs.250 ) ( all t&p suchas crowbars, siling, dshackle etc., that must be brought by the contractor ) ( labour for structure concreting, stay concreting, painting, fixing of name board / danger board, ( drilling of holes, cutting, welding, alteration of clamps if anyand provision of earth pit collars are separately given ) 26 erection of single pole transformer structure inclusive of following works excavation of pole pit sizing 2 x 2 x 6 ( 1*475 ) , erection of poles 1*550 ) , excavation of stay pits ( 1*390 ) and erection of stay set ( 1*210 ) , erection of structure materials ( tapping channel rs.150, transformer centre set arrangements rs.350 ) erection of ab switch ( rs.900 ) , hg fuse ( rs.400 ) structure earthing complete ( rs.2000 ) , fixing of open type fuse units and feeder arrangements ( rs.450 ) , ht / lt las fixing ( rs.350 and rs.250 ) , jumpering ( rs.300 ) ( all t&p suchas crowbars, siling, dshackle etc., that must be brought by the contractor ) ( labour for structure concreting, stay concreting, painting, fixing of name board / danger board.erection of transformer, transporting of transformer, lt cable arrangements, fixing of dt meter. drilling of holes, cutting, welding, alteration of clamps if anyand provision of earth pit collars are separately given ) 27 guarding arrangements with flat guarding including fixing of 2nos. cross arms ht / lt 28 transportofpoles / materials / conductors / dt / metering set andothermaterials ( excludingloading andunloadingcharges. ) below 8 kms 29 transports of poles / materials / conductors and other materials ( excluding loading and unloading charges ) for above 8 kms for addl. kms ( irrespective of weight in tonage / km 30 loadingofmetal poles ( all sizes ) 31 unloadingofmetal poles ( all sizes ) 32 loadingofpoles up to 8 mrcc / psc poles 33 loadingofpoles above 8 mrcc / psc poles 34 unloadingofpoles up to 8 m rcc / psc poles 35 unloadingofpoles above 8 m rcc / psc poles 36 transporting of poles from road side to pole pit location including loadingand unloading of polesby using jcb or manual up to 100 m 37 transporting of poles from road side to pole pit including loadingand unloading of polesby using jcb or manual above 100 m 38 erection of street light including fixture fitting 39 erection of street light service 40 releasingofsingle phaseservicewire and re fixing. 41 releasingof3 phaseservice wire ( upto 50 hp ) and re fixing. 42 releasingof3 phaseservice wire ( above 50 hp ) andre fixing. 43 labourchargesforalterationof back clamps tosuitfortheworks 44 labourchargesforalterationof stay clamps tosuitfortheworks 45 cutting of coconut leaves / per tree 46 cleaning of branches of treeper tree 47 drilling of hole in channel only 3 / 4 & 1 per hole 48 cutting of channel 49 cutting of angle 50 cutting of pipe 51 dismandling of pole above 8.0 mtr 52 dismandling ofpoleup to 8.0 mtr 53 dismandling of v x arm ( all types ) , channel x arm, guarding x arm 54 dismandling of lt 3 phase x arm 55 dismandling of lt single phase x arm 56 dismandling of ht / lt ti fitting 57 dismandling of 11kv strain disc 58 dismandling of 11 kv / 22kv pin insulator 59 dismandling of33 kv pin insulator 60 dismandling of lt shackle 61 dismandling of lt pin insulator 62 dismandling of aluminium knob 63 dismandling of stay set 64 dismandling of acsr 7 / 3.35mm oraaac7 / 3.15 conductor 65 dismandling of acsr 7 / 2.59mm or 7 / 2.11mm conductor 66 dismandling of street light service 67 feeder arrangementswith open type fuse units per 1 feeder...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34951043 eos to 3 nos agri tatkal sc to thiru.c.chinna thambi, at sf.no 57, malavarayanathamvillage, in alwarthirunagari section & thiru.jamesh augustin at sf.no 102 / 1b & 104 / 5 in semmarikulam village in meignanapuram section. loading and unloading of 9.0 m pscpolefrom road side to pole pit 2 transporting of 9.0 m psc pole from road side to pole pit 3 excavation & erectionof 9.0 m psc pole 4 fixing 36 v x arm 5 fixing tapping channel and guardingx arm 6 fixing of ht pin insulator 7 fixing of 11kv disc 8 fixing ht ti fitting 9 alteration of back clamp & stay clamp 10 erection of pole earthing 11 excavation and eraction of stay set 12 stringing and sagging of aaac7 / 3.15 mm 13 slottedholes 14 guarding arrangement 15 jungle clearance 16 conversion pin point to cut point 17 ht special structure erected 18 loading and unloading of 8.0 m psc polefrom road side to pole pit 19 transporting of 8.0 m psc pole from road side to pole pit 20 excavation and erectionof 8.0 m psc pole 21 fixing of3 phase x arm 22 fixing of 1ph. x arm 23 fixing of lt shackle and insulator 24 erection of 7 / 2.50 aaac 25 erection of 7 / 3.35 acsr 26 alternation of clamp 27 loading and unloading of 16kvadt 28 transporting of 16kvadt 29 erection of 16kvadt 30 loading and unloading of 25kva dt 31 transporting of 25kva dt 32 erection of 25kva dt 33 conversion pin point to cut point 34 dismantlingof7.5 mpole 35 grill separation 36 dismantling of ltti fitting 37 dismantling of 7 / 2.59 acsr 38 dismantling of s ph x arm 39 dismantling and re erection of 3 ph xarm 40 dismantling and re erection of ht7 / 2.59 acsr with 30 % lc work 41 dismantling and re erection of lt pin insulator and sackle 42 dismantling of lt pin insulator 43 dismantling of stay set...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34733640 tender for works contract for edaganasalai section in south / o&m division excavation of pole / stay pits 2 excavation of pole pit up to 27” ( 8.0m ) pole 3 stay pit 4.5” to 5” depth 4 excavation of pole pitup to 9.14 mtrpole 5 hard rock without blasting 6 rcc poles / metal pole up to 8.00m ( 27’ ) 7 rccpoles / metal pole up to 9.14.m ( 30’ ) 8 erection of stay set complete 9 ht vcross arms / channel cross arms / guarding cross arm 41 / 2 10 lt 3 phase cross arm 11 lt single phase cross arm 12 ht / ltti fitting 13 fixing of ht pin insulators ( 11 / 22kv ) 14 fixing of ht 11kv stain disc 15 fixing of lt pin insulators 16 fixing of lt shackle 17 fixing of knob 18 labour charges for alteration of back clamps / stay clamps to suit for the works 19 earthing of poles 20 acsr7 / 4.09 mm raccoon conductor 21 7 / 3.35mm acsr 7 / 3.15mmaaac ( per wire per span ) 22 7 / 2.59mm acsr &7 / 2.50mm aaac ( per wire per span ) 23 erection of transformer structure complete in all respects with wiring earthing , fixingof open type fuse units , ht / lt / lasandjumpering 3 nos.earth pits with tubs includingpainting ofmetal parts, structure poles , fixing of top channelseating channel, belting angle including concreting ( except erectionoftransformer ) 24 erection of single pole structure 25 erection of d.p structure with ab switch , top channel , cross bracing , erathing , painting, providing stay including concreting . 26 transport of poles / materials / conductors and other materials ( excluding loading and unloading charges ) below 8 kms ( planins ) 27 above 8 kms . for additional km 28 transporting of poles from road side to pole pit including loading and unloading of poles by using jcb or manual beyond 100 m 29 loading of poles upto 27 30 loading of poles upto 30 31 loading of metal poles ( all sizes ) 32 un loading of poles upto 27 33 un loading of poles upto 30 34 unloading of metal poles ( all sizes ) 35 releasing of single phase service wire and refixing 36 releasing of three phase service wire and refixing 37 releasing of 3 phase service and ( above 50 hp ) re fixing 38 agricultural service fixing 39 erection of street light including fixure fitting 40 erection of street light service 41 dismandling of pole ( 9.0m and above ) 42 dismandling of pole ( 7.5mtr & 8mtr ) 43 dismandling of pole from pole pit ( 9.0m and above ) 44 dismandling of pole from pole pit ( 7.5mtr & 8mtr ) 45 dismandling of ht pin insulator 46 dismandling of ht ti fitting 47 dismandling of11 kv disc 48 dismandling of 3 ph x arm 49 dismandling of tapping x arm, v x arm & guarding x arm 50 dismandling of 1 ph x arm 51 dismandling of alu knob 52 dismandling oflt pin insulator 53 dismandling of lt shackle insulator 54 stay set complete dismandling 55 dismandling of 7 / 3.35 mm acsr conductor 56 dismandling of 7 / 2.59 & 7 / 2.11 mmacsr conductor 57 loading or unloading of transformer above 100 and upto 200 kva 58 loading or unloading of transformer above 200 kva 59 erection ofnew transformer all capacities ( with jumpering ) 60 replacement of failed transformers all capacities 61 re stringing of acsr 7 / 3.35 mm 62 re stringing of acsr 7 / 2.59 mm 63 dismantlingof street light including fixure fitting 64 dismantlingof street light sc box 65 tree cutting 66 releasing of grills from rcc poles 67 mass conreting including materials ( cement + river sand / m. sand and blue metals and watering ) 68 sleeve concreting including materials ( cement + river sand / m. sand and blue metals and watering ) 69 stat concreting including cost of materials and labour 375 mm x 375 mm x 50 mm 70 drilling of hole in channel only 3 / 4 & 1 71 cutting of channel 72 cutting of rsj pole 73 providing lt bus bar arrangement in distn. trs. structure loc 74 erection of new 10 earth pipe replacing the corroded earth pipe and renewal of erthing including burying looping and binding....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34627519 tender for works contract for east / operation and maintenance division 1 excavation of pole / stay pits 2 excavation of pole pit up to 27” ( 8.0m ) pole 3 stay bit 4.5” to 5” depth 4 excavation of pole pitup to 9.14 mtrpole 5 hard rock without blasting 6 rcc poles / metal pole up to 8.00m ( 27’ ) 7 rccpoles / metal pole up to 9.14.m ( 30’ ) ( 300 kg ) 8 erection of stay set complete 9 fixing of line materials 10 ht vcross arms / channel cross arms / guarding cross arm 3 1 / 2, 4 1 / 2 11 lt 3 phase cross arm 12 lt single phase cross arm 13 ht / ltti fitting 14 fixing of ht pin insulators ( 11 / 22 kv ) 15 fixing of ht 11kv stain disc 16 fixing of lt pin insulators 17 fixing of lt shackle 18 fixing of knob 19 labour charges for alteration of back clamp / stay clamp to siut for the works 20 earthing of poles 21 paving and stringing of conductor 22 acsr 7 / 4.09 mm raccon conductor 23 7 / 3.35mm acsr 7 / 3.15mmaaac 24 7 / 2.59mm acsr &7 / 2.50mm aaac 25 erection of transformer structure completed in all respects with wiring earthing , fixingof open type fuse units , ht / lt / lasandjumpering 3 nos.earth pits with tubs includingpainting ofmetal parts, structure poles , fixing of top channelseating channel , belting angle including concreting ( except erectionoftransformer ) 26 erection of single pole structure 27 erection of d.pstructure with ab switch top channel , cross bracing , earthing, painting, providingstay and pole concreting 28 transporting of poles 29 transport of poles / materials / conductors and other materials ( excluding loading and unloading charges. ) 30 above 8 kms for additional km 31 transporting of poles from road side to pole pit including loading and unloading of poles by using jcb or manual beyond 100 m. 32 loading & unloading of poles 33 loading of poles up to 27” 34 loading of poles up to 30” 35 loading of metal poles ( all sizes ) 36 unloading of poles up to 27” 37 unloading of poles up to 30” 38 unloading of metal poles ( all sizes ) 39 service connections 40 releasing of single phase service wire and refixing 41 releasing of three phase service wire and refixing 42 releasing of three phase service and ( above 50 hp ) re fixing 43 agricultural service fixing 44 erection of street light including fixture fitting 45 erection of street light service 46 dismandling of line materials 47 dismandling of pole ( 9.0 m and above ) 48 dismandling of pole ( 7.5 m and 8.0 m ) 49 dismandling of pole from pole pit ( 9.0m and above ) 50 dismandling of pole from pole pit ( 7.5m and 8m ) 51 dismandling of ht pin insulator 52 dismandling of ht ti fitting 53 dismandling of 11 kv strain disc 54 dismandling of 3 ph x arm 55 dismandling of tapping cross arms / v x arm &guarding cross arm 56 dismandling of 1 ph x arm 57 dismandling of alu knob 58 dismandling oflt pin insulator 59 dismandling of lt shackle insulator 60 dismandling of stay set complete 61 dismandlingof acsr 7 / 3.35mm & aaac 7 / 3.15mm 62 dismandlingof acsr 7 / 2.59mm & aaac 7 / 2.50 mm 63 loading or unloading of transformer above 100 and upto 200 kva 64 loading or unloading of transformer above 200 kva 65 erection of new transformer all capacities ( with jumpering ) 66 replacement of failed transformers all capacities 67 re stringing of acsr 7 / 3.35mm 68 re stringing of acsr 7 / 3.35mm 69 dismantling of street light including fixture fitting 70 dismantling of street light sc box 71 tree cutting 72 releasing of grills from rcc poles 73 concreting of poles 74 mass concreting including materials ( cement + river sand / m.sand and blue metals and watering ) 75 sleeve concreting including materials ( cement + river sand / m.sand and blue metals and watering ) 76 stay concreting including cost of materials and labour 375mm x 375 mm x 50mm 77 painting 78 painting of metal poles including cross arms ( excluding cost of paint ) 79 numbering of pole with paint and with base painting. 80 painting of rcc / psc poles ( colour washing ) 81 painting of transformer ( double coat ) 82 painting of ht metering set and box 83 lathe works 84 drilling of hole in channel only 3 / 4 & 1 85 cutting of channel 86 cutting of rsj pole 87 miscellaneous works 88 providing of lt bus bar arrangement in dt structure loc. 89 erection of new 10 earth pipe replacing the corroded earth pipe and renewal of earthing including burying looping and binding....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34264099 supply of fixed contact for 11 kv abs as per tender specification , supply offixed contact for 11 kv ab switch , 0.6kva ups , fixed contact for 11 kv ab switch 200 amps , pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee] , stay pit , in ordinary soil [0.95 x 0.6 x 1.2m] , semi rocky soil , stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee] , erection of poles & stays (including refilling of excavated earth) , erection of 7.5m / 8.0m poles [rcc / psc] , erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. (including stay pit excavation & refilling & erection) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt/ht ti fitting , fixing of lt 3 ph x arm , fixing of 3[1/2] v` x arm , fixing of4[1/2] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc/polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run , upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , acsr 7/4.09 mm , above 7/4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [double side earthing] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [including all materials]. , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set (4 sets) , mass concreting (cement:sand:jelly supplied by the contractor) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [2 nos channel] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ht side] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint). , painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint) , colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] , painting name of ss at seating channel including paint. , painting of dt alone [excluding painting] with red oxide and double coating of aluminium paint. , dt metering arrangement (without materials) , erection of distribution transformer /dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [black background and yellow letters] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp/led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl/ 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection/dismantling of metering set 11 kv / 22 kv/33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5/8 , all size angles / channel above 5/8 , slot holes in flat / angles / channel upto 3/4 , slot holes in flat / angles / channel above 3/4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt[ pin point ] location , set right the leaning pole in both ht & lt[ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [during conductor or support change] , releasing and erection 3 ph sc wire [during conductor or support change] , destruction of pole concerting at site. , retrieving grill from detoriated pole [grill separate from damaged pole] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc/ metal pole [per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc /psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof[ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer/metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer/metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [rcc / psc] , dismantling of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt/ht ti fitting , dismantling of lt/ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3[1/2] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc/polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7/4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34264090 supply of tc fuse wire 18 swg as per tender specification , supply oftc fuse wire 18 swg , 0.6kva ups , tc fuse wire 18 swg , pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee] , stay pit , in ordinary soil [0.95 x 0.6 x 1.2m] , semi rocky soil , stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee] , erection of poles & stays (including refilling of excavated earth) , erection of 7.5m / 8.0m poles [rcc / psc] , erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. (including stay pit excavation & refilling & erection) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt/ht ti fitting , fixing of lt 3 ph x arm , fixing of 3[1/2] v` x arm , fixing of4[1/2] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc/polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run , upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , acsr 7/4.09 mm , above 7/4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [double side earthing] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [including all materials]. , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set (4 sets) , mass concreting (cement:sand:jelly supplied by the contractor) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [2 nos channel] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ht side] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint). , painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint) , colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] , painting name of ss at seating channel including paint. , painting of dt alone [excluding painting] with red oxide and double coating of aluminium paint. , dt metering arrangement (without materials) , erection of distribution transformer /dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [black background and yellow letters] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp/led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl/ 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection/dismantling of metering set 11 kv / 22 kv/33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5/8 , all size angles / channel above 5/8 , slot holes in flat / angles / channel upto 3/4 , slot holes in flat / angles / channel above 3/4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt[ pin point ] location , set right the leaning pole in both ht & lt[ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [during conductor or support change] , releasing and erection 3 ph sc wire [during conductor or support change] , destruction of pole concerting at site. , retrieving grill from detoriated pole [grill separate from damaged pole] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc/ metal pole [per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc /psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof[ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer/metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer/metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [rcc / psc] , dismantling of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt/ht ti fitting , dismantling of lt/ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3[1/2] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc/polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7/4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34264075 supply of moving contact for 11 kv abs as per tender specification , supply ofmoving contact for 11 kv ab switch , 0.6kva ups , moving contact for 11 kv ab switch 200 amps , pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee] , stay pit , in ordinary soil [0.95 x 0.6 x 1.2m] , semi rocky soil , stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee] , erection of poles & stays (including refilling of excavated earth) , erection of 7.5m / 8.0m poles [rcc / psc] , erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. (including stay pit excavation & refilling & erection) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt/ht ti fitting , fixing of lt 3 ph x arm , fixing of 3[1/2] v` x arm , fixing of4[1/2] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc/polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run , upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , acsr 7/4.09 mm , above 7/4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [double side earthing] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [including all materials]. , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set (4 sets) , mass concreting (cement:sand:jelly supplied by the contractor) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [2 nos channel] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ht side] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint). , painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint) , colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] , painting name of ss at seating channel including paint. , painting of dt alone [excluding painting] with red oxide and double coating of aluminium paint. , dt metering arrangement (without materials) , erection of distribution transformer /dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [black background and yellow letters] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp/led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl/ 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection/dismantling of metering set 11 kv / 22 kv/33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5/8 , all size angles / channel above 5/8 , slot holes in flat / angles / channel upto 3/4 , slot holes in flat / angles / channel above 3/4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt[ pin point ] location , set right the leaning pole in both ht & lt[ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [during conductor or support change] , releasing and erection 3 ph sc wire [during conductor or support change] , destruction of pole concerting at site. , retrieving grill from detoriated pole [grill separate from damaged pole] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc/ metal pole [per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc /psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof[ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer/metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer/metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [rcc / psc] , dismantling of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt/ht ti fitting , dismantling of lt/ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3[1/2] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc/polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7/4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34264070 supply of tc fuse wire 14 swg as per tender specification , supply oftc fuse wire 14 swg , 0.6kva ups , tc fuse wire 14 swg , pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee] , stay pit , in ordinary soil [0.95 x 0.6 x 1.2m] , semi rocky soil , stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee] , erection of poles & stays (including refilling of excavated earth) , erection of 7.5m / 8.0m poles [rcc / psc] , erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. (including stay pit excavation & refilling & erection) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt/ht ti fitting , fixing of lt 3 ph x arm , fixing of 3[1/2] v` x arm , fixing of4[1/2] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc/polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run , upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , acsr 7/4.09 mm , above 7/4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [double side earthing] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [including all materials]. , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set (4 sets) , mass concreting (cement:sand:jelly supplied by the contractor) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [2 nos channel] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ht side] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint). , painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint) , colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] , painting name of ss at seating channel including paint. , painting of dt alone [excluding painting] with red oxide and double coating of aluminium paint. , dt metering arrangement (without materials) , erection of distribution transformer /dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [black background and yellow letters] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp/led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl/ 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection/dismantling of metering set 11 kv / 22 kv/33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5/8 , all size angles / channel above 5/8 , slot holes in flat / angles / channel upto 3/4 , slot holes in flat / angles / channel above 3/4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt[ pin point ] location , set right the leaning pole in both ht & lt[ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [during conductor or support change] , releasing and erection 3 ph sc wire [during conductor or support change] , destruction of pole concerting at site. , retrieving grill from detoriated pole [grill separate from damaged pole] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc/ metal pole [per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc /psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof[ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer/metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer/metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [rcc / psc] , dismantling of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt/ht ti fitting , dismantling of lt/ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3[1/2] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc/polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7/4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34264068 supply of tc fuse wire 16 swg , 0.6kva ups , tc fuse wire 16 swg , pole pit for 9.0m and 9.14 m psc / rcc / all metal poles ( each pit ) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting / cheseling required [ specific approval should be obtained from concerned ee ] , stay pit , in ordinary soil [ 0.95 x 0.6 x 1.2m ] , semi rocky soil , stay pit in heavy rocky soil where blasting / cheseling reqiured [ specific approval should be obtained from concerned ee ] , erection of poles & stays ( including refilling of excavated earth ) , erection of 7.5m / 8.0m poles [ rcc / psc ] , erection of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. ( including stay pit excavation & refilling & erection ) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt / ht ti fitting , fixing of lt 3 ph x arm , fixing of 3 [ 1 / 2 ] v` x arm , fixing of4 [ 1 / 2 ] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc / polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [ including transport of condutor from road side to work spot ] per run , upto 7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , acsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , acsr 7 / 4.09 mm , above 7 / 4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit ] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [ double side earthing ] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [ including all materials ] . , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set ( 4 sets ) , mass concreting ( cement:sand:jelly supplied by the contractor ) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [ 2 nos channel ] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ ht side ] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [ two coat of red oxide ] all metal parts ( excluding cost of paint ) . , painting of stru. complete excluding dt [ one coat alu paint, excluding cost of paint ) , colour washing of 2 numbers structure pole [ excluding cost of distember / snowsem ] , painting name of ss at seating channel including paint. , painting of dt alone [ excluding painting ] with red oxide and double coating of aluminium paint. , dt metering arrangement ( without materials ) , erection of distribution transformer / dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [ black background and yellow letters ] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp / led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl / 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection / dismantling of metering set 11 kv / 22 kv / 33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5 / 8 , all size angles / channel above 5 / 8 , slot holes in flat / angles / channel upto 3 / 4 , slot holes in flat / angles / channel above 3 / 4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt [ pin point ] location , set right the leaning pole in both ht & lt [ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [ during conductor or support change ] , releasing and erection 3 ph sc wire [ during conductor or support change ] , destruction of pole concerting at site. , retrieving grill from detoriated pole [ grill separate from damaged pole ] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [ railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc / metal pole [ per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc / psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer / metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer / metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [ rcc / psc ] , dismantling of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt / ht ti fitting , dismantling of lt / ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3 [ 1 / 2 ] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc / polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7 / 4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34129125 works contract for thindal section west / erode sub division ofurban / erodedivision excavationofpolepit size of 2x2x6 upto 27 pole by using jcb or manual 2 excavation of stay pit 4.5 to 5 by using jcb or manual 3 excavationofpolepit size above 8 mts psc / rcc / rsj pole by using jcb or manual 4 excavation of pit in hard rock requires without blasting ( where houses are located ) 5 erection of rcc poles / psc poles / metal poles upto 27 ( 8.0m ) pole by using jcb or manual 6 erection of rcc poles / psc poles / metal poles above 8 mtrspole by using jcb or manual 7 erection of rsj , rail and fabricated poles above 9.0m pole by using jcb or manual 8 erectionof stay set complete 9 fixingof ht v cross arms ( all types ) / channel cross arms / guarding cross arms 10 fixingof lt 3 phase cross arms 11 fixing of lt single phase ph x arm 12 fixing of ht / lt ti fittings 13 fixing of ht pin insulator 11 kv / 22 kv 14 fixing of ht pin insulator33 kv 15 fixing of ht 11kv strain disc 16 fixing of ht 22kv strain disc 17 fixing of lt pin insulators 18 fixing of lt shackle with mp 19 fixing of aluminium knob 20 earthing of pole with pin including burying , looping and binding 21 paving of conductor, stringing, binding, jumpering etc., complete for lines with acsr 7 / 4.09 mm 22 paving of conductor, stringing, binding, jumpering etc., complete for lines with acsr 7 / 3.35 mm or aaac 7 / 3.15 mm conductor 23 paving of conductor, stringing, binding, jumpering etc., complete for lines with acsr 7 / 2.59 mm or aaac 7 / 2.50mm conductor 24 structure concreting , concreting of poles with size ( 2x2x6 ) including cost of cement , jelly and sandwith a mixture of 1:3:6and plastering of concrete with ratio 1:2 25 sleeveconcreting with size ( 2x2x3 ) including cost of excavation cement , jelly and sandwith a mixture of 1:3:6and plastering of concrete with ratio 1:2 including materials 26 stay concreting of stay with size 1.5 x 1.5 x 3.0 including cost of 40mm cement, jelly and sand ( with supply ) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2. 27 erectionofdouble pole transformerstructure completeinclusive of following works excavation of pole pits sizing 2 x 2 x 6 ( 2*475 ) , erection of poles ( 2*550 ) , excavation of stay pits ( 4*390 ) and erection of stay set ( 4*210 ) , erection of structure materials ( top channel rs.250, bed channel rs.250, cross with stud for bed channel rs.120, belting angle rs.250 ) erection of ab switch ( rs.1000 ) , hg fuse ( rs.600 ) structure earthing complete ( rs.2100 ) , fixing of open type fuse units and feeder arrangements ( rs.900 ) , ht / lt las fixing ( rs.350 and rs.250 ) , provision of bus bar arrangement ( rs.500 ) , jumpering ( rs.400 ) fixing of support inculator angle and erection of of 3 nos pin insulators ( rs.200 ) ( all t&p suchas crowbars, siling, dshackle etc., that must be brought by the contractor ) ( labour for structure concreting, stay concreting, painting, fixing of name board / danger board, erection of transformer, transporting of transformer , fixing of dt meter , drilling of holes, cutting, welding, alteration of clamps if anyand provision of earth pit collars are separately given ) . 28 erection of double polestructure ( d.p ) inclusive of following works excavation of pole pits sizing 2 x 2 x 6 ( 2*475 ) , erection of poles ( 2*550 ) , excavation of stay pits ( 4*390 ) and erection of stay set ( 4*210 ) , erection of structure materials ( top channel rs.250 ) erection of ab switch ( rs.1000 ) , structure earthing complete ( rs.1500 ) , ht las fixing ( rs.350 ) , jumpering ( rs.250 ) ( all t&p suchas crowbars, siling, dshackle etc., that must be brought by the contractor ) ( labour for structure concreting, stay concreting, painting, fixing of name board / danger board, ( drilling of holes, cutting, welding, alteration of clamps if anyand provision of earth pit collars are separately given ) 29 erection of single pole transformer structure inclusive of following works excavation of pole pit sizing 2 x 2 x 6 ( 1*475 ) , erection of poles 1*550 ) , excavation of stay pits ( 1*390 ) and erection of stay set ( 1*210 ) , erection of structure materials ( tapping channel rs.150, transformer centre set arrangements rs.350 ) erection of ab switch ( rs.900 ) , hg fuse ( rs.400 ) structure earthing complete ( rs.2000 ) , fixing of open type fuse units and feeder arrangements ( rs.450 ) , ht / lt las fixing ( rs.350 and rs.250 ) , jumpering ( rs.300 ) ( all t&p suchas crowbars, siling, dshackle etc., that must be brought by the contractor ) ( labour for structure concreting, stay concreting, painting, fixing of name board / danger board.erection of transformer, transporting of transformer, lt cable arrangements, fixing of dt meter. drilling of holes, cutting, welding, alteration of clamps if anyand provision of earth pit collars are separately given ) 30 guarding arrangements with flat guarding including fixing of 2nos. cross arms ht / lt 31 transportofpoles / materials / conductors / dt / metering set andothermaterials ( excludingloading andunloadingcharges. ) below 8 kms 32 transports of poles / materials / conductors and other materials ( excluding loading and unloading charges ) for above 8 kms for addl. kms ( irrespective of weight in tonage / km 33 loadingofmetal poles ( all sizes ) 34 unloadingofmetal poles ( all sizes ) 35 loadingofpoles up to 8 mrcc / psc poles 36 loadingofpoles above 8 mrcc / psc poles 37 unloadingofpoles up to 8 m rcc / psc poles 38 unloadingofpoles above 8 m rcc / psc poles 39 transporting of poles from road side to pole pit location including loadingand unloading of polesby using jcb or manual up to 100 m 40 transporting of poles from road side to pole pit including loadingand unloading of polesby using jcb or manual above 100 m 41 loadingorunloadingoftransformer upto100 kvaand metering set 42 loadingorunloadingoftransformer above 100 kva 43 resagging of ht / lt line with acsr 7 / 4.09mm 44 re sagging of ht / lt line with acsr 7 / 3.35mm or aaac7 / 3.15 mm conductor 45 re sagging of ht / lt with acsr 7 / 2.59mm or aaac 7 / 2.50 mm conductor 46 erection of street light including fixture fitting 47 erection of street light service 48 agriculture service fixing / service 49 releasingofsingle phaseservicewire and re fixing. 50 releasingof3 phaseservice wire ( upto 50 hp ) and re fixing. 51 releasingof3 phaseservice wire ( above 50 hp ) andre fixing. 52 releasing of grills from rcc poles 53 releasing of hts wire from psc pole 54 erection of new transformer for all capacities and ht metering set 55 labourchargesforalterationof back clamps tosuitfortheworks 56 labourchargesforalterationof stay clamps tosuitfortheworks 57 releasingofacsr / aaacconductors fromconductordrumandcoiling acsr 7 / 3.35, 7 / 2.59, aaac7 / 2.50, 7 / 3.15 mm ( per / km. ) 58 cutting of coconut leaves / per tree 59 cleaning of branches of treeper tree 60 drilling of hole in channel only 3 / 4 & 1 per hole 61 cutting of flat 62 cutting of channel 63 cutting of angle 64 cutting of pipe 65 dismandling of pole above 8.0 mtr 66 dismandling ofpoleup to 8.0 mtr 67 dismandling of v x arm ( all types ) , channel x arm, guarding x arm 68 dismandling of lt 3 phase x arm 69 dismandling of lt single phase x arm 70 dismandling of ht / lt ti fitting 71 dismandling of 11kv strain disc 72 dismandling of 11 kv / 22kv pin insulator 73 dismandling of33 kv pin insulator 74 dismandling of lt shackle 75 dismandling of lt pin insulator 76 dismandling of aluminium knob 77 dismandling of stay set 78 dismandling of acsr 7 / 3.35mm oraaac7 / 3.15 conductor 79 dismandling of acsr 7 / 2.59mm or 7 / 2.11mm conductor 80 dismandling of street light service 81 loading of materials 82 unloading of materials 83 leading and stacking of materials 84 dismandling of mvl / svl fitting 85 dismandling of 1x40w ftlfitting 86 provision of earth pit collar 87 fixing of danger board 88 painting ofall clamps and other materials and painting of structure pole for double pole structure. 89 painting ofall clamps and other materials and painting of structure polefor single pole structure 90 painting ofall clamps and other materials and painting of structure pole for dp structure 91 feeder arrangementswith open type fuse units per 1 feeder 92 base concreting of transformer structure 93 lt cable arrangements 94 provision of distribution transformer name board, ( name of the 22 / 11 kv feeder , name of the ss , capacity of the dt ) ....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34073937 work contract for hvds work in 22 kv anaikaraipatty feeder in east / bodi section 1 loading or unloading metal poles all sizes 2 unloading of dt upto 100 kva 3 other tree branch clearance 4 alteration of stay clamp 5 erection of dt upto 25kva / metering set 6 dismandling of cross arm 7 cocount tree clearance branch 8 dismantling of dt upto 100 9 erection of psc pole upto 8 m 10 loadind of dt upto 100 11 stringing of conductor above 7 / 2.59 mm 12 earthing of pole gi 4 or 6 swg 13 loading / unloading of lt line material 14 drillijng of holes up to 3 / 4 15 excavation of pole upto 8.0m 16 transporting of conductor all sizes 17 painting of iron poles up to 40ft 18 dismandling of trannsformer structure material 19 loading / unloading of ht line material 20 loading of conductor 21 unloading of conductor 22 fixing of aluminium knob 23 stay concreting 24 fixing of shackle 25 erection of stay set complete 26 fixing of lt pin insulator 27 levelling of ground using bul dozer 28 erection of sp structure 29 erection of dp structure 30 erection of double pole dt structure complete 31 diamandling of metal and psc poles 32 loading / unloadng of psc pole upto 8mtr 33 transport of poles above 5 km ( 8km ) 34 fixing of ht / lt fitting 35 fixing of v cross arm 4.5 feet 36 loading / unloading of 22 kv strain disc 37 excavation of pit in hard soil 38 erection of dt above 25kva to 100 kva 39 transport of dt / line material upto 10 km 40 sleeve concreting 41 excavation of pole above 8 m 42 excavation of stay pit 4.5 to 5 43 dismandling of conductor upto 7 / 3.35 44 releasing and reerection of conductor 45 fixing of tapping channel cross arm 46 loading / unloading of psc pole above 8 m 47 alteration of back clamp 48 fixing of ht pin insulator 49 erection of psc pole above 8 m 50 provision of spike earthing arrangement 51 fixing of 22 kv strain disc 52 fixing of lt 3 phase cross arm 53 transport of pole for a lead upto 5 km...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33894555 supply of g.i back clamp suitable for 9 mtr psc pole as per tenderspecification , supply ofg.i back clamp for 9.00 mtr psc pole ( 300 kg ) , 0.6kva ups , g.i back clamp for 9.00 mtr psc pole ( 300 kg ) , pole pit for 9.0m and 9.14 m psc / rcc / all metal poles ( each pit ) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting / cheseling required [ specific approval should be obtained from concerned ee ] , stay pit , in ordinary soil [ 0.95 x 0.6 x 1.2m ] , semi rocky soil , stay pit in heavy rocky soil where blasting / cheseling reqiured [ specific approval should be obtained from concerned ee ] , erection of poles & stays ( including refilling of excavated earth ) , erection of 7.5m / 8.0m poles [ rcc / psc ] , erection of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. ( including stay pit excavation & refilling & erection ) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt / ht ti fitting , fixing of lt 3 ph x arm , fixing of 3 [ 1 / 2 ] v` x arm , fixing of4 [ 1 / 2 ] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc / polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [ including transport of condutor from road side to work spot ] per run , upto 7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , acsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , acsr 7 / 4.09 mm , above 7 / 4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit ] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [ double side earthing ] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [ including all materials ] . , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set ( 4 sets ) , mass concreting ( cement:sand:jelly supplied by the contractor ) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [ 2 nos channel ] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ ht side ] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [ two coat of red oxide ] all metal parts ( excluding cost of paint ) . , painting of stru. complete excluding dt [ one coat alu paint, excluding cost of paint ) , colour washing of 2 numbers structure pole [ excluding cost of distember / snowsem ] , painting name of ss at seating channel including paint. , painting of dt alone [ excluding painting ] with red oxide and double coating of aluminium paint. , dt metering arrangement ( without materials ) , erection of distribution transformer / dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [ black background and yellow letters ] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp / led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl / 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection / dismantling of metering set 11 kv / 22 kv / 33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5 / 8 , all size angles / channel above 5 / 8 , slot holes in flat / angles / channel upto 3 / 4 , slot holes in flat / angles / channel above 3 / 4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt [ pin point ] location , set right the leaning pole in both ht & lt [ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [ during conductor or support change ] , releasing and erection 3 ph sc wire [ during conductor or support change ] , destruction of pole concerting at site. , retrieving grill from detoriated pole [ grill separate from damaged pole ] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [ railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc / metal pole [ per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc / psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer / metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer / metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [ rcc / psc ] , dismantling of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt / ht ti fitting , dismantling of lt / ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3 [ 1 / 2 ] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc / polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7 / 4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Tamil Nadu Transmission Corporation Limited - Tamil Nadu

33656662 works contract for varagur section t.m.patty feeder for rdss works excavation of pole pits / stay set: 2 excavation of pole pit upto 27 (8.0 m) pole by using jcb or manual 3 excavation of pole pit above 8.0 mtr pole psc/rcc/rsj pole by using jcb or manual 4 stay pit 4.5 to 5 depth by using jcb or manual 5 hard rock requires blasting 6 erection of poles and accessories 7 psc/ rcc poles/metal poles upto 8.00m. (27) by using jcb or manual 8 psc/ rcc poles/metal poles above 8.00m by using jcb ormaual 9 metal supports above 9.00m/ rsj/ rail pole/ fabricated poles/ tubular pole by using jcb or maual 10 erection of stay set complete 11 fixing of line materials 12 fixing of ht v cross arms (all types) / channel cross arms/ guarding cross arms 13 fixing of guarding cross arm 14 fixing of tapping channel cross arm 15 fixing of lt 3 phase cross arms 16 fixing of lt single phase cross arms 17 fixing of ht/lt ti fittings 18 fixing of aluminium knob 19 fixing of ht pin insulators 22 kv 20 fixing of ht 22 kv strain disc. 21 fixing of lt pin insulator 22 fixing of lt shackle 23 re sagging of ht/lt lines 24 re sagging acsr 7/3.35mm / aaac 3.15 mm rabbit conductor 25 re sagging acsr 7/2.59 mm / aaac 2.50 mm weasel and acsr 7/2.11 mm conductor 26 service erected: 27 erection of street light including fixure fitting 28 releasing of single phase service and re fixing. 29 releasing of 3 phase service and (upto 50 hp) re fixing. 30 concreting works: 31 sleeve concreting including materials (cement + river sand/ msand and blue metals and watering) 32 stay concreting including cost of materials and labour 375mmx375mmx50mm 33 earthing: 34 earthing of pole with coil earthing including burying looping and binding. 35 loading and unloading charges: 36 loading of poles upto 8.0 m/ 27 37 loading of poles above 8.0 m 38 loading of metal poles (all sizes) 39 unloading of poles upto 8.0 m/ 27 40 unloading of poles above 8.0 m 41 unloading of metal poles (all sizes) 42 loading of materials 43 unloading of materials 44 loading or unloading of transformer upto 100 kva 45 erection of new transformer all capacities (with jumpering) 46 guarding arrangement 47 ht guarding 48 transport of poles/materials/ conductors and other materials (excluding loading and unloading charges.) 49 below 8 kms (plains) 50 above 8 kms. for additional km (irrespective of weight in tonnage) 51 transporting of poles from road side to pole pit including loading and unloading of poles by using jcb or manual beyond 100 m 52 dismantling charges 53 dismantling of psc/rcc upto pole 8.00 m (27) 54 dismantling of psc/rcc & above 8.00m 55 dismantling of stay set complete 56 dismantling of 1ph xarm 57 dismantling of 3ph xarm 58 dismantling of tapping x arm / v cross arm 59 dismantling of ht/lt ti fitting 60 dismantling of 22kv pin insulator 61 dismantling of 22 kv strain disc 62 dismantling of lt pin insulator 63 dismantling of lt shackle 64 dismantling of aluminium knob 65 dismantling of conductor of size acsr 7/2.59 /aaac 7/2.50 66 dismantling of conductor of size acsr 7/3.35 /aaac 7/3.15 67 painting: 68 painting of metal poles including cross arms (excluding cost of paint) 69 lathe works 70 labour charges for alteration of back clamps/ stay clamps to suit for the works 71 dt/ dp erection 72 erection of single pole transformer structure complete in all respects with wiring, earthing, fixing of open type fuse units, ht/lt las and jumpering 3 nos. earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (except erection of transformer)(annexure iii) 73 erection of d.p. structure with ab switch, top channel, cross bracing, earthing, painting, providing stay including concreting (annexure iv) 74 paving of ht/lt lines 75 acsr 7/3.35 mm / aaac 3.15mm rabbit conductor in km 76 acsr 7/2.59 mm/ aaac 2.50mm weasel and acsr 7/2.11mm conductor in km 77 miscellaneous works 78 clearing of jungle ...

Tamil Nadu Transmission Corporation Limited - Tamil Nadu

33656549 work contract for execution of works under rds schemefor t.jedarpalayam section in namagiripet west subdivision,rasipuram division sl. no. item description 1 excavation of pole pits / stay set: 2 excavation of pole pit upto 27 (8.0 m) pole by using jcb or manual 3 excavation of pole pit above 8.0 mtr pole psc/rcc/rsj pole by using jcb or manual 4 stay pit 4.5 to 5 depth by using jcb or manual 5 erection of poles and accessories 6 psc/ rcc poles/metal poles upto 8.00m. (27) by using jcb or manual 7 psc/ rcc poles/metal poles above 8.00m by using jcb ormaual 8 erection of stay set complete 9 fixing of line materials 10 ht v cross arms (all types) / channel cross arms/ guarding cross arms 11 lt 3 phase cross arms 12 lt single phase cross arms 13 ht/lt ti fittings 14 fixing of aluminium knob 15 fixing of ht pin insulators 22 kv 16 fixing of ht 22 kv strain disc. 17 fixing of lt pin insulator 18 fixing of lt shackle 19 re sagging of ht/lt lines 20 re sagging acsr 7/2.59 mm / aaac 2.50 mm weasel and acsr 7/2.11 mm conductor 21 releasing of acsr/aaac from conductor drum and coiling 7/2.59 mm / aaac 2.50 mmacsr 7/3.35 mm and aaac 7/3.15 mm 22 concreting works: 23 sleeve concreting including materials (cement + river sand/ msand and blue metals and watering) 24 stay concreting including cost of materials and labour 375mmx375mmx50mm 25 earthing: 26 earthing of pole with coil earthing including burying looping and binding. 27 loading and unloading charges: 28 loading of poles upto 8.0 m 29 loading of poles above 8.0 m 30 loading of metal poles (all sizes) 31 unloading of poles upto 8.0 m 32 unloading of poles above 8.0 m 33 unloading of metal poles (all sizes) 34 loading of materials 35 unloading of materials 36 loading or unloading of transformer upto 100 kva 37 erection of new transformer all capacities (with jumpering) 38 transport of poles/materials/ conductors and other materials (excluding loading and unloading charges.) 39 below 8 kms (plains) 40 above 8 kms. for additional km (irrespective of weight in tonnage) 41 transport of poles from road side to pole pit including loading and unloading of poles by using jcb or manual upto 100 42 dismantling charges 43 dismantling ofpsc/rcc abovepole 8.00m. (27) 44 dismantling of 3ph xarm 45 dismantling of ht/lt ti fitting 46 dismantling of lt pin insulator 47 dismantling of lt shackle 48 dismantling of aluminium knob 49 dismantling of conductor of size acsr 7/2.59 /aaac 7/2.50 50 dismantling of conductor of size acsr 7/3.35 /aaac 7/3.15 51 painting: 52 painting of metal poles including cross arms (excluding cost of paint) 53 numbering of pole with paint and with base painting. 54 lathe works 55 manufacturing of special type clamps for rail pole, rsj pole, tubular pole, special clamps for distribution transformer structure using 50x8 ms flat/ 65x10 ms flat 56 labour charges for alteration of back clamps/ stay clamps to suit for the works 57 cutting of pipe 58 cutting of rsj pole 59 rsj pole welding 60 dt/ dp erection 61 erection of transformer structure complete inallrespects with wiring, earthing, fixing of open type fuse units, ht/lt las and jumpering 3 nos. earth pits with collar including painting of metal parts, structurepoles,fixingoftop channel, seating channel, belting angle including concreting (except erection of transformer) 62 erection of single pole transformer structure complete in all respects with wiring, earthing, fixing of open type fuse units, ht/lt las and jumpering 3 nos. earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (except erection of transformer) 63 erection of d.p. structure with ab switch, top channel, cross bracing, earthing, painting, providing stay including concreting 64 miscellaneous works 65 releasing of hts wire from psc pole 66 paving of ht/lt lines 67 acsr 7/3.35mm / aaac 3.15 mm rabbit conductor 68 acsr 7/2.59mm / aaac 2.50 mm weasel conductor ...

Tamil Nadu Transmission Corporation Limited - Tamil Nadu

33656546 work contract for execution of works under rdss schemefor ariyagoundampatty section in namagiripet subdivision sl. no. item description 1 excavation of pole pits / stay set: 2 excavation of pole pit upto 27 ( 8.0 m ) pole by using jcb or manual 3 excavation of pole pit above 8.0 mtr pole psc / rcc / rsj pole by using jcb or manual 4 stay pit 4.5 to 5 depth by using jcb or manual 5 erection of poles and accessories 6 psc / rcc poles / metal poles upto 8.00m. ( 27 ) by using jcb or manual 7 psc / rcc poles / metal poles above 8.00m by using jcb or manual 8 erection of stay set complete 9 fixing of line materials 10 ht v cross arms ( all types ) / channel cross arms / guarding cross arms 11 lt 3 phase cross arms 12 lt single phase cross arms 13 ht / lt ti fittings 14 fixing of aluminium knob 15 fixing of ht pin insulators 22 kv 16 fixing of ht 11 kv strain disc. 17 fixing of lt pin insulator 18 fixing of lt shackle 19 re sagging of ht / lt lines 20 re sagging acsr 7 / 3.35mm / aaac 3.15 mm rabbit conductor 21 re sagging acsr 7 / 2.59 mm / aaac 2.50 mm weasel and acsr 7 / 2.11 mm conductor 22 service erected: 23 releasing of single phase service and re fixing. 24 releasing of 3 phase service and ( upto 50 hp ) re fixing. 25 concreting works: 26 sleeve concreting including materials ( cement + river sand / msand and blue metals and watering ) 27 stay concreting including cost of materials and labour 375mmx375mmx50mm 28 earthing: 29 earthing of pole with coil earthing including burying looping and binding. 30 loading and unloading charges: 31 loading of poles upto 8.0 m 32 loading of poles above 8.0 m 33 unloading of poles upto 8.0 m 34 unloading of poles above 8.0 m 35 loading of materials 36 unloading of materials 37 loading or unloading of transformer upto 100 kva 38 loading or unloading of transformer above 100 and upto 200 kva 39 erection of new transformer all capacities ( with jumpering ) 40 transport of poles / materials / conductors and other materials ( excluding loading and unloading charges. ) 41 below 8 kms ( plains ) 42 above 8 kms. for additional km ( irrespective of weight in tonnage ) 43 dismantling charges 44 dismantling ofpsc / rcc uptopole 8.00m. ( 27 ) 45 dismantling of metal supports above 9.00m / rsj / rail pole / fabricated poles / tubular pole 46 excavation of pole pit upto 27 ( 8.0 m ) pole manual for dismantling 47 excavation of pole pit above 8.0 mtr pole psc / rcc / rsj polemanual for dismantling 48 dismantling of stay set complete 49 dismantling of 1ph xarm 50 dismantling of 3ph xarm 51 dismantling of tapping x arm / v cross arm 52 dismantling of ht / lt ti fitting 53 dismantling of 22kv pin insulator 54 dismantling of 22 kv strain disc 55 dismantling of lt pin insulator 56 dismantling of lt shackle 57 dismantling of aluminium knob 58 dismantling of conductor of size acsr 7 / 2.59 / aaac 7 / 2.50 59 dismantling of conductor of size acsr 7 / 3.35 / aaac 7 / 3.15 60 dismantling of transformer structure materials complete set and transporting the same from the location to the road side 61 painting: 62 painting of metal poles including cross arms ( excluding cost of paint ) 63 numbering of pole with paint and with base painting. 64 lathe works 65 manufacturing of special type clamps for rail pole, rsj pole, tubular pole, special clamps for distribution transformer structure using 50x8 ms flat / 65x10 ms flat 66 labour charges for alteration of back clamps / stay clamps to suit for the works 67 cutting of flat 68 cutting of pipe 69 dt / dp erection 70 erection of transformer structure complete inallrespects with wiring, earthing, fixing of open type fuse units, ht / lt las and jumpering 3 nos. earth pits with collar including painting of metal parts, structurepoles, fixingoftop channel, seating channel, belting angle including concreting ( except erection of transformer ) 71 erection of transformer structure complete inallrespects with wiring, earthing, fixing of open type fuse units, ht / lt las and jumpering 3 nos. earth pits with collar including painting of metal parts, structurepoles, fixingoftop channel, seating channel, belting angle excluding concreting ( except erection of transformer ) 72 erection of single pole transformer structure complete in all respects with wiring, earthing, fixing of open type fuse units, ht / lt las and jumpering 3 nos. earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting ( except erection of transformer ) 73 erection of d.p. structure with ab switch, top channel, cross bracing, earthing, painting, providing stay including concreting 74 paving of ht / lt lines 75 acsr 7 / 4.09 mm raccoon conductor 76 acsr 7 / 3.35mm / aaac 3.15 mm rabbit conductor 77 acsr 7 / 2.59 mm / aaac 2.50 mm weasel conductor...

Tamil Nadu Transmission Corporation Limited - Tamil Nadu

33633752 running contract for execution of works under rdssfor erumapatty subdivision 2 excavation of pole pit upto 27 ( 8.0 m ) pole by using jcb or manual 3 excavation of pole pit above 8.0 mtr pole psc / rcc / rsj pole by using jcb or manual 4 stay pit 4.5 to 5 depth by using jcb or manual 5 erection of poles and accessories 6 psc / rcc poles / metal poles upto 8.00m. ( 27 ) by using jcb or manual 7 psc / rcc poles / metal poles above 8.00m by using jcb ormaual 8 metal supports above 9.00m / rsj / rail pole / fabricated poles / tubular pole by using jcb or maual 9 erection of stay set complete 10 fixing of line materials 11 ht v cross arms ( all types ) / channel cross arms / guarding cross arms 12 tapping channel cross arm 13 lt 3 phase cross arms 14 lt single phase cross arms 15 ht / lt ti fittings 16 fixing of aluminium knob 17 fixing of ht pin insulators 22 kv 18 fixing of ht 22 kv strain disc. 19 fixing of lt pin insulator 20 fixing of lt shackle 21 service erected: 22 erection of street light including fixure fitting 23 releasing of 3 phase service and ( upto 50 hp ) re fixing. 24 concreting works: 25 sleeve concreting including materials ( cement + river sand / msand and blue metals and watering ) 26 stay concreting including cost of materials and labour 375mmx375mmx50mm 27 earthing: 28 earthing of pole with coil earthing including burying looping and binding. 29 loading and unloading charges: 30 loading of poles upto 8.0 m / 27 31 loading of poles above 8.0 m 32 loading of metal poles ( all sizes ) 33 unloading of poles upto 8.0 m / 27 34 unloading of poles above 8.0 m 35 loading of metal poles ( all sizes ) 36 loading of materials 37 unloading of materials 38 erection of new transformer all capacities ( with jumpering ) 39 transport of poles / materials / conductors and other materials ( excluding loading and unloading charges. ) 40 below 8 kms ( plains ) 41 above 8 kms. for additional km ( irrespective of weight in tonnage ) 42 transporting of poles from road side to pole pit including loading and unloading of poles by using jcb or manual up to 100 m 43 transporting of poles from road side to pole pit including loading and unloading of poles by using jcb or manual beyond 100 m 44 dismantling charges 45 dismantling of psc / rcc upto pole 8.00m ( 27 ) 46 dismantling of psc / rcc & above 8.0m 47 dismantling of stay set complete 48 dismantling of 1ph xarm 49 dismantling of 3ph xarm 50 dismantlign of tapping x arm / v cross arm 51 dismantling of ht / lt ti fitting 52 dismantling of 22kv pin insulator 53 dismantling of 22 kv strain disc 54 dismantling of lt pin insulator 55 dismantling of lt shackle 56 dismantling of aluminium knob 57 dismantling of conductor of size acsr 7 / 2.59 / aaac 7 / 2.50 58 dismantling of conductor of size acsr 7 / 3.35 / aaac 7 / 3.15 59 painting: 60 painting of metal poles including cross arms ( excluding cost of paint ) 61 numbering of pole with paint and with base painting. 62 painting of rcc / psc poles ( colour washing ) 63 lathe works 64 labour charges for alteration of back clamps / stay clamps to suit for the works 65 drilling of hole in channel only 3 / 4 & 1 66 cutting of channel 67 rsj pole welding 68 t.i.fitting welding with clamps 69 dt / dp erection 70 erection of transformer structure complete inallrespects with wiring, earthing, fixing of open type fuse units, ht / lt las and jumpering 3 nos. earth pits with collar including painting of metal parts, structurepoles, fixingoftop channel, seating channel, belting angle including concreting ( except erection of transformer ) ( annexure ii ) 71 erection of single pole transformer structure complete in all respects with wiring, earthing, fixing of open type fuse units, ht / lt las and jumpering 3 nos. earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting ( except erection of transformer ) ( annexure iii ) 72 erection of d.p. structure with ab switch, top channel, cross bracing, earthing, painting, providing stay including concreting ( annexure iv ) 73 paving of ht / lt lines 74 acsr 7 / 3.35mm / aaac 3.15mm rabbit conductor in km 75 acsr 7 / 2.59mm / aaac 2.50 mm weasel and acsr 7 / 2.11 mm conductor in km 76 miscellaneous works 77 releasing of hts wire from psc pole 78 cutting of coconut leaves 79 clearing of branches of trees...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33445098 rds scheme hvds works contract to carry out the erection of poles, dt and allied extension works using private contractor in 11 kv kadakkam feeder fed from 110 / 33 11kv perambur sub station of ae kiliyanoor section of mayiladuthurai division rds scheme hvds works contract to carry out the erection of poles, dt and allied extension works using private contractor in 11 kv kadakkam feeder fed from 110 / 33 11kv perambur sub station of ae kiliyanoor section of mayiladuthurai division , ht line material labourfixing of 11kv disc , fixingof 3 phase cross arm , painting of back clamp , transporting of line materials , loading & unloading line materials , paving of stringing of conductor , painting of poles , excavation of pole pit , loading & unloading 8.0mtr pole , writing of rdss in pole eb letter pole , loading & unloading11kv pin insulator , alteration of back clamp & stay clamp , excavation of stay pit , erection of stay pit , fixing of v cross arm , fixing of 11kv pin insulator , erection of tapping channel cross arm , tree cutting , loading & unloading conductor , painting of 3 phase cross arm , painting of red oxide & alu.ht ti fitting , concreting of pole , concreting of stay , painting of red oxide & alu tapping channel , painting of red oxide & alu v cross arm , numbering of pole , painting of v cross arm , painting of tapping channel cross arm , painting of ht ti fitting , earthing of pole with gi wire , transporting of 8.0mtr pole , erection of 8.0mtr pole , 63kva dt labour writing of rdss pole , numbering of pole , transporting of structure materials , transporting of square pole , erection of single pole structure , writing of rdss in pole incl.. painting , loading & unloading 9.0mtrsquare pole , loading & unloading of structure materials , transporting of 63kva dt , loading & unloading of 63kva dt , 25kva dt labourloading & unloading 9.0mtr square pole , loading& unloading structure material , writing of rdss , transporting of 25kva dt , numbering of pole , transporting of structure materials , transporting of square pole , loading & unloading 25kva dt , erection ofsingle pole structure , writing of rdss pole incl..painting , 16kva dt labourloading & unloading 9.0mtr square pole , loading& unloading structure material , writing of rdss pole , transport of 16kva dt , numbering of pole , transporting of structure materials , transport of square pole , loading & unloading 16kva dt , erection single pole structure , writing of rdss pole incl..painting , street lightfixing of one set of street light , loading & unloading meter , dismantling dismantling of 100kva dt , dismantling of 3phase x arm, back clamp, lt ti fitting , dismanling of conductor 7 / 2.59...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33375117 pedc pudukkottai rdss scheme agricultural feeder segregation works of 11kv puliyur feeder ( part ii 1 ) fed from 110kv t.nallur ss ofae / o&m / e / keeranur section of keeranur sub division in keeranur division in pudukkottai edc. 1 excavation of 9mtrpolepit 2 erecetion of 9m pole with bp 3 excavation of 8mtrpolepit 4 erecetion of 8m pole with bp 5 transport of 9m / 8m pole 6 loading ofpole 9m / 8m 7 unloading of psc pole 9m / 8m 8 excavation of stay pit 9 erection of stay set complete 10 erection of tapping channel 11 fixing of 3.6 v x arm 12 fixing of aluminium knob 13 fixing of 11kv disc 14 fixing of 11kv pin insulator 15 fixing of lt pin insulator 16 fixing of lt shackle with mp 17 earthing of pole includimh buring and looping 18 erection of single pole structure complete 19 paving and stringing of conductor 7 / 3.35 20 paving and stringing of conductor 7 / 2.59 21 tree cutting by jcb 22 alteration ofclamps 23 loading of conductor 24 unloading of conductor 25 loading of linematerials 26 unloading of line materials 27 transport of conductor from road side to work site 28 numbering of poles 29 loadiing of iron and steel 30 unloadiing iron and steel 31 loading and unloading of pin, shackle 32 erection of 11kv dp structure 33 writing of rdss in poles 34 sleeve concreting / stay concreting 35 loading and unloading of dt 36 painting of poles 37 painting of v x arm 38 painting of stay clamp / back clamp 39 painting of tapping channel 40 painting of ht / lt ti fitting 41 painting of lt 3ph cross arm 42 loading and unloading of 11kv disc 43 extension of bay erectionincluding erection of ab switches, breaker, ct, clamps, jumpering c&r panel, digging of trench and allied works....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33375112 pedc pudukkottai rdss scheme agricultural feeder segregation works of 11kv killukkottai ( part 2 ) fed from 33kv kunnandarkoil ss ofae / o&m / kunnandarkoil section of keeranur sub division in keeranur division in pudukkottai edc. 1 excavation of 9mtrpolepit 2 erecetion of 9m pole with bp 3 excavation of 8mtrpolepit 4 erecetion of 8m pole with bp 5 transport of 9m / 8m pole 6 transport of dt upto 10km 7 transport of dt above 10km 8 excavation of stay pit 9 erection of stay set complete 10 erection of tapping channel 11 fixing of 3.6 v x arm 12 fixing of aluminium knob 13 fixing of 11kv disc 14 fixing of lt pin insulator 15 loading of iron and steel 16 unloading of iron and steel 17 earthing of pole includimh buring and looping 18 erection of single pole structure complete 19 paving and stringing of conductor 7 / 3.35 20 paving and stringing of conductor 7 / 2.5 21 tree cutting by jcb 22 alteration ofclamps 23 transport of pole from road side to work site 24 painting of 1ph cross arm 25 loading of linematerials 26 unloading of line materials 27 mass concreting of structure pole 28 numbering of poles 29 loading and unloading of 11kv disc 30 loading and unloading of pin, shackle 31 erection of 11kv dp structure 32 writing of rdss in poles 33 sleeve concreting / stay concreting 34 loading and unloading of dt 35 painting of poles 36 painting of v x arm 37 painting of stay clamp / back clamp 38 painting of tapping channel 39 painting of ht / lt ti fitting 40 painting of lt 3ph cross arm 41 fixing of lt 3ph cross arm 42 transport of conductor from road side to work site...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33375109 pedc pudukkottai rdss scheme agricultural feeder segregation works of 11kv killukkottai ( part 1 ) fed from 33kv kunnandarkoil ss ofae / o&m / kunnandarkoil section of keeranur sub division in keeranur division in pudukkottai edc. 1 excavation of 9mtrpolepit 2 erecetion of 9m pole with bp 3 excavation of 8mtrpolepit 4 erecetion of 8m pole with bp 5 transport of 9m / 8m pole 6 transport of dt upto 10km 7 transport of dt above 10km 8 excavation of stay pit 9 erection of stay set complete 10 erection of tapping channel 11 fixing of 3.6 v x arm 12 fixing of aluminium knob 13 fixing of 11kv disc 14 fixing of lt pin insulator 15 loading of iron and steel 16 unloading of iron and steel 17 earthing of pole includimh buring and looping 18 erection of single pole structure complete 19 paving and stringing of conductor 7 / 3.35 20 paving and stringing of conductor 7 / 2.5 21 tree cutting by jcb 22 alteration ofclamps 23 transport of pole from road side to work site 24 painting of 1ph cross arm 25 loading of linematerials 26 unloading of line materials 27 mass concreting of structure pole 28 numbering of poles 29 loading and unloading of 11kv disc 30 loading and unloading of pin, shackle 31 erection of 11kv dp structure 32 writing of rdss in poles 33 sleeve concreting / stay concreting 34 loading and unloading of dt 35 painting of poles 36 painting of v x arm 37 painting of stay clamp / back clamp 38 painting of tapping channel 39 painting of ht / lt ti fitting 40 painting of lt 3ph cross arm 41 fixing of lt 3ph cross arm 42 transport of conductor from road side to work site 43 bay extension including erection of ab switches, breaker, ct, las, clamps, jumpering, c&r panel, cable trench and allied works....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33346126 agricultural feeder segregation works of 22kv chidambaraviduthy ( part ii 1 ) fed from 110kv vadakadu ss ofae / o&m / kothamangalam section of vadakadu sub division in alangydy division in pudukkottai edc excavation of 9mtrpolepit 2 erecetion of 9m pole with bp 3 excavation of 8mtrpolepit 4 erecetion of 8m pole with bp 5 transport of 9m/8m pole 6 loading ofpole 9m/8m 7 unloading of psc pole 9m/8m 8 excavation of stay pit 9 erection of stay set complete 10 erection of tapping channel 11 fixing of 4.6 v x arm 12 fixing of aluminium knob 13 fixing of 22kv disc 14 fixing of 22kv pin insulator 15 fixing of ht/ lt ti fitting 16 earthing of pole includimh buring and looping 17 paving and stringing of conductor 7/4.09 18 paving and stringing of conductor 7/3.15 19 tree cutting by jcb 20 alteration ofclamps 21 loading of conductor7/4.09 22 loading of conductor 7/3.15 23 loading of linematerials 24 unloading of line materials 25 transporting of line materials 26 numbering of poles 27 loading and unloading of 22kv disc 28 loading and unloading of 22kvpin,guy insulator 29 providing various size of holes 30 providing various slot holes 31 writing of rdss in poles 32 sleeve concreting / stay concreting 33 unloading of conductor 7/4.09 34 unloading of conductor 7/3.15 35 painting of poles 36 painting of v x arm 37 painting of stay clamp /back clamp 38 painting of tapping channel 39 painting of ht/lt ti fitting ...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33213414 rdss agri feeder segregation of 11kv mookkapudaiyanpalla feeder 33 / 11kv kulathurnayaganpatty ss of o&m punalkulam section in gandarvakottai sub division in pudukkottai division in pedc 1 tree cutting jcb 2 numbering of poles 3 writing nos in poles 4 panting of pole with distamber 5 double pole dperection 6 erection of single pole dt structure complete 7 erection of single pole 25&40kva dt structure complete 8 loading of str. materials 9 unloading of str. materials 10 transport of str. materials 11 bay extention including erection of ab switches, ct, breaker, las, clamps, c&r panel, cable laying and all allied works 12 writing rdss pole 13 loading of dt upto 100kva 14 unloading of dt upto 100kva 15 sleeve concreting 16 stay concreting 17 labour charge for painding of tapping channel 18 labour charge for painding of htti fitting 19 labour charge for painding of back clamp 20 labour charge for painding of stay clamp 21 labour charge for painding of v cross arm 22 labour charge for painding three ph cross arm 23 labour charge for altration of stay clamp 24 labour charge for altration of back clamp...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33213281 22kv andakulam feeder ( part i ) in adhanakkottai section in adhanakkottai 110kv ss in gandarvakkottai sub division in pudukkottai division in pudukkottai edc 1 excavation of 9.00 m pole pit 2 erection of 9.00 m pole with bp 3 excavation of 8.00 m pole pit 4 erection of 8.00 m pole with bp 5 transport of 9.00m pole to work site up 6 transport of 8.00m pole to work site up 7 loading of psc pole 9.00m length 8 loading of psc pole 8.00m length 9 un loading of psc pole 9.00m length 10 un loading of psc pole 8.00m length 11 excavation of stay pit 12 erection of stay set compleate 13 erection of tapping chennal 14 fixing of 4x6 v cross arm 15 fixing of lt 3phcross arm 16 fixing of alu knob 17 erection of 22 kv disk 18 fixing of 22 kv pin insulator 19 erection of single pole dt structure complete 20 fixing of lt pin insulator 21 fixing of lt shackle with mp 22 fixing of ht / lt ti fitting 23 earthing of poleincluding buring , loop 24 paving and stringing of conductor 7 / 3.35 25 paving and stringing of conductor 7 / 2.5 26 tree cutting for jcb 27 alteration of holes 28 loadingof conductor 7 / 3.15 29 loadingof conductor 7 / 2.5 30 unloading of conductor 7 / 3.15 31 unloading of conductor 7 / 2.5 32 loading / unloading of line materials 33 transpiorting of line materials 34 numbering of poles 35 loading of dt upto 100kva 36 unloading of dt upto 100kva 37 double pole dperection 38 loading of str. materials 39 unloading of str. materials 40 transport of str. materials 41 bay extention including erection of ab switches, ct, breaker, las, clamps, c&r panel, cable laying and all allied works 42 exavation of cable trunch 43 loading / unloading of ht cable per km 44 transporting of ht cable per km 45 laying of ht cable per meter 46 fixing of termination 47 covering of ht cable by cement v per km 48 refilling with excavated eart layers 49 writing rdss pole 50 labour charge for painding of tapping channel 51 labour charge for painding of htti fitting 52 labour charge for painding of back clamp 53 labour charge for painding of stay clamp 54 labour charge for painding of v cross arm 55 labour charge for painding three ph cross arm 56 painting of pole with distambar 57 labour charge for altration of stay clamp 58 labour charge for altration of back clamp 59 writing nos in pole...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33213261 tender for rdss scheme feeder segregation works at 22kv perungalur feeder ( part i ) in 110kv adhanakkottai ss in gandharvakottaisub division in pudukkottai division in pudukkottai edc 1 excavation of 9.00 m pole pit 2 erection of 9.00 m pole with bp 3 excavation of 8.00 m pole pit 4 erection of 8.00 m pole with bp 5 transport of 9.00m pole to work site up 6 transport of 8.00m pole to work site up 7 loading of psc pole 9.00m length 8 loading of psc pole 8.00m length 9 un loading of psc pole 9.00m length 10 un loading of psc pole 8.00m length 11 excavation of stay pit 12 erection of stay set compleate 13 erection of tapping chennal 14 fixing of 3x6 v cross arm 15 fixing of lt 3phcross arm 16 fixing of alu knob 17 erection of 22 kv disk 18 fixing of 22 kv pin insulator 19 fixing of lt pin insulator 20 fixing of lt shackle with mp 21 fixing of ht / lt ti fitting 22 earthing of poleincluding buring , loop 23 paving and stringing of conductor 7 / 3.35 24 paving and stringing of conductor 7 / 2.5 25 alteration of holes 26 loadingof conductor 7 / 3.15 27 loadingof conductor 7 / 2.5 28 unloading of conductor 7 / 3.15 29 unloading of conductor 7 / 2.5 30 loading / unloading of line materials 31 transpiorting of line materials 32 transpiorting of line materials lt 33 sleeve concreting 34 stay concreting 35 labour charge for painding of tapping channel 36 labour charge for painding of htti fitting 37 labour charge for painding of back clamp 38 labour charge for painding of stay clamp 39 labour charge for painding of v cross arm 40 labour charge for painding three ph cross arm 41 labour charge for altration of stay clamp 42 labour charge for altration of back clamp...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33102379 running contract for extension / improvement works in illuppur sub division in pudukkottai edc 2 pit excavation for 7.5 mts / 8 mts pole in ordinary soil including cleaning of site ( each pit ) 3 1.25 x 0.6 x 1.5m [ ordinary soil ] 4 semi rocky soil 5 pole pit for 9.0m and 9.14 m psc / rcc / all metal poles ( each pit ) 1.25 x 0.6 x 1.83 mtr 6 ordinary soil 7 semi rocky soil 8 heavy rocky soil where blasting / cheseling required [ specific approval should be obtained from concerned ee ] 9 stay pit 10 in ordinary soil [ 0.95 x 0.6 x 1.2m ] 11 semi rocky soil 12 stay pit in heavy rocky soil where blasting / cheseling reqiured [ specific approval should be obtained from concerned ee ] 13 erection of poles & stays ( including refilling of excavated earth ) 14 erection of 7.5m / 8.0m poles [ rcc / psc ] 15 erection of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles 16 stay set 17 erection stay set complete 18 stay erection without rod and pit 19 replacement of stay rod only. ( including stay pit excavation & refilling & erection ) 20 replacement of guy shackle only in existing stay 21 erection of line materials 22 fixing of lt 1 ph x arm 23 fixing of lt / ht ti fitting 24 fixing of lt 3 ph x arm 25 fixing of 3 [ 1 / 2 ] v` x arm 26 fixing of4 [ 1 / 2 ] v` x arm 27 fixing of 5 v x arm 28 fixing of tapping channel / guarding x arm 29 providing of line spacers in lt lines 1 phase 30 providing of line spacers in lt lines 3 phase 31 erection of ab switch with pt insulator & jumpering complete 32 erection of centre rotating switch ab switch complete 33 fixing of ht pin insulator / strain disc 34 11 kv pin insulator with pin 35 11 kvstrain disc / polymer disc with hardware 36 22 kv pin insulator with pin 37 22 kv strain disc / polymer disc with hardware 38 33 kv pin insulator with pin 39 33 kv pinstrain disc / polymer discwith hardware 40 fixing of lt pin insulator with pin 41 lt shakle with hardware 42 fixing of aluminium knob 43 paving stringing and sagging of conductor including binding of pin and proper tight [ including transport of condutor from road side to work spot ] per run 44 upto 7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm 45 acsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm 46 acsr 7 / 4.09 mm 47 above 7 / 4.09 mm acsr & dog conductor 48 for lc works ( all types of conductor ) 49 route surveying andpeg marking of ht / ltlines 50 earthing wiring and connection including transporting of earth pipe and excavation of pit ] 51 transformer structure earthing 10ft depth 3 nos of pipe throughtubes 52 dp earthing including all works [ double side earthing ] 53 erection of 4th earth pipe including earthing 54 earthing of poles 55 earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. 56 replacement of detoriated earth pipe per location 57 concreting with mixture 1:3:6 [ including all materials ] . 58 ( a ) transformer structure poles mass concreting with coping 0.75mx0.5mx1.8m coping material supplied by the contractor ( cement =100 kg river sand, 40 mm jully including labour 2 nos of pole in structure ) 59 ( b ) mass concerting for pole in line0.75mx0.5mx1.8m 60 ( c ) sleeve concret for poles in line 0.75m x 0.5x 0.9m 61 ( d ) sleeve concret for stay set 0.3x0.3x0.75 62 erection of distribution transformer structure complete 63 excavation of structure pole pits 0.9 x0.9 x 1.83 mtr 64 transporting of pole to pit location 2 nos. 65 erection of poles 2 nos 66 excavation of stay pit 4 nos 67 erection of stay set ( 4 sets ) 68 mass concreting ( cement:sand:jelly supplied by the contractor ) 2 nos. 69 erection ofab switch 70 transformer structure earthing 10ft depth 3 nos of pipe through earth tubes 71 erection of top channel 72 bed channel [ 2 nos channel ] erection 73 cross with stud for bed channel erection 74 erection of belting angle / hg fuse angle 75 erection ofhg fuse set 76 erection of ht las with jumpering and earthing 77 erection of lt las with jumbering and earthing 78 erection of jumpering [ ht side ] 79 transformer wiring in lt side including jumpering bus bar etc. 80 erection lt open type fuse unit arrangement single 81 erection lt open type fuse unit arrangementdouble 82 painting of stru. complete excluding dt [ two coat of red oxide ] all metal parts ( excluding cost of paint ) . 83 painting of stru. complete excluding dt [ one coat alu paint, excluding cost of paint ) 84 colour washing of 2 numbers structure pole [ excluding cost of distember / snowsem ] 85 painting name of ss at seating channel including paint. 86 painting of dt alone [ excluding painting ] with red oxide and double coating of aluminium paint. 87 erection of single pole mounted dt erection work ( including pole concreting & 3nos earth pipe & paintimng ) 88 erection of dt metering arrangement ( materials supplied by the board ) 89 erection of distribution transformer / dismantling of dt 90 upto 100 kva 91 above 100 kva and upto 250 kva 92 500 kva 93 colour washing of rcc / psc poles 94 numbering of poles including cost of paint / loc [ black background and yellow letters ] 95 painting of sc details in the meter board / agl boxes / hut scs including paint. 96 service connection 97 transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling 98 transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp / led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. 99 fixing of street light fitting with 2 cfl / 4 cfl 100 provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. 101 erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot 102 erection / dismantling of metering set 11 kv / 22 kv / 33 kv 103 fabrication works. 104 labour charges for alteration of back clamp / stay clamp to suitable for works. 105 providing of holes. 106 all size angles / channel upto 5 / 8 107 all size angles / channel above 5 / 8 108 slot holes in flat / angles / channel upto 3 / 4 109 slot holes in flat / angles / channel above 3 / 4 110 fabrication of centre support only for dt structure 111 cutting of rs joist / angles / ms channels 112 welding of rs joist / angles / ms channels 113 general 114 set right the leaning pole in both ht & lt [ pin point ] location 115 set right the leaning pole in both ht & lt [ cut point ] location 116 resagging of lines for all sizes cut point location 117 converting pin point into cut point ht lines 118 converting pin point into cut point lt lines 119 clearing tree branches ofcoconut tree 120 clearing tree branches of neem, tamarind, countrytree etc., 121 releasing and re erection of1 ph sc wire [ during conductor or support change ] 122 releasing and re erection 3 ph sc wire [ during conductor or support change ] 123 destruction of pole concerting at site. 124 retrieving grill from detoriated pole [ grill separate from damaged pole ] 125 re earthing of structure completely including earthpipe changing if any 3nos earth pipe 126 re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) 127 guarding arrangement : 128 cradle guarding including earthing and earth pit excavation [ railway & p&t crossing ] 129 flat guarding with 4 wire 130 split netural guarding 131 loading and unloading : 132 loading of 7.5 mtr / 8.0 mtr rcc / psc / metal pole [ per pole ] 133 loading of [ 9.14 mtr ] 9.0 mtr poles rcc / psc pole / metal pole [ per pole ] 134 unloading of psc / rcc / metal poles 135 transporting from road side to workspot 136 transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km 137 transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] 138 transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km 139 transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof 140 transport of line materials 141 transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms 142 transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km 143 loading / unloading of line materials 144 transport of equipements 145 transporting of distribution transformer / metering set by using private vehicleload of one no.minimumup to 30 km 146 .transporting of distribution transformer / metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km 147 dismantling works 148 dismantling of 7.5m / 8.0m poles [ rcc / psc ] 149 dismantling of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles 150 dismantling stay set complete 151 dismantling of lt 1 ph x arm / lt / ht ti fitting 152 dismantling of lt / ht ti fitting 153 dismantling of lt 3 ph x arm 154 dismantlingof 3 [ 1 / 2 ] v` x arm 155 dismantlingof tapping channel and guarding x arm 156 dismantling of 11 kv strain disc / polymer disc with hardware 157 dismantling of 22 kv pin insulator with pin 158 dismantling of 22 kvstrain disc with hardware 159 dismantling of 33 kv pin insulator with pin 160 dismantling of 33 kvstrain disc with hardware 161 dismantlingof lt pin insulator with pin 162 dismantlingof lt shackle with hardware 163 dismantling of aluminium knob 164 dismantling of conductor7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm 165 dismantling of conductoracsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm 166 dismantling of conductoracsr 7 / 4.09 mm 167 single phase meter &3 phase meter 168 replacement ( releasing & fixing ) of single phase meter ( including transport charges ) 169 replacement ( releasing & fixing ) of three phase meter ( including transport charges ) 170 checking healthiness of agl.meter 171 checking healthiness of agl.meter1...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33010999 relay test kit relay test kit for mrt wing , supply of relays , 0.6kva ups , relay test kit , 2kva servo stabilizer , pole pit for 9.0m and 9.14 m psc / rcc / all metal poles ( each pit ) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting / cheseling required [ specific approval should be obtained from concerned ee ] , stay pit , in ordinary soil [ 0.95 x 0.6 x 1.2m ] , semi rocky soil , stay pit in heavy rocky soil where blasting / cheseling reqiured [ specific approval should be obtained from concerned ee ] , erection of poles & stays ( including refilling of excavated earth ) , erection of 7.5m / 8.0m poles [ rcc / psc ] , erection of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. ( including stay pit excavation & refilling & erection ) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt / ht ti fitting , fixing of lt 3 ph x arm , fixing of 3 [ 1 / 2 ] v` x arm , fixing of4 [ 1 / 2 ] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc / polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [ including transport of condutor from road side to work spot ] per run , upto 7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , acsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , acsr 7 / 4.09 mm , above 7 / 4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit ] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [ double side earthing ] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [ including all materials ] . , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set ( 4 sets ) , mass concreting ( cement:sand:jelly supplied by the contractor ) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [ 2 nos channel ] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ ht side ] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [ two coat of red oxide ] all metal parts ( excluding cost of paint ) . , painting of stru. complete excluding dt [ one coat alu paint, excluding cost of paint ) , colour washing of 2 numbers structure pole [ excluding cost of distember / snowsem ] , painting name of ss at seating channel including paint. , painting of dt alone [ excluding painting ] with red oxide and double coating of aluminium paint. , dt metering arrangement ( without materials ) , erection of distribution transformer / dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [ black background and yellow letters ] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp / led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl / 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection / dismantling of metering set 11 kv / 22 kv / 33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5 / 8 , all size angles / channel above 5 / 8 , slot holes in flat / angles / channel upto 3 / 4 , slot holes in flat / angles / channel above 3 / 4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt [ pin point ] location , set right the leaning pole in both ht & lt [ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [ during conductor or support change ] , releasing and erection 3 ph sc wire [ during conductor or support change ] , destruction of pole concerting at site. , retrieving grill from detoriated pole [ grill separate from damaged pole ] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [ railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc / metal pole [ per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc / psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer / metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer / metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [ rcc / psc ] , dismantling of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt / ht ti fitting , dismantling of lt / ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3 [ 1 / 2 ] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc / polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7 / 4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

32341976 e tender forrdss scheme erection, dismantling of poles , ht / lt lines and other allied extension works in 11 kv kavilipalayam# of 110 / 33 11 kv kavilipalayamss 1 excavation of pole pit for below 9m ( 30 ) pole / staypit per location 2 excavation of pole / stay pit for 9 m ( 30 ) and abovepole per location 3 excavation of pole / stay pit per location for hard rock with blasting 4 excavation of pole / stay pit per location for hard rockwithout blasting . 5 transporting of rcc / rsj fabricated pole from road sideto pole pit head per pole upto 100m 6 erection / dismantling of rccpoles / metal poles above 9.14m using machines 7 erection of stay set complete per stay 8 fixing of 3 6 v x arm 9 fixing of tapping channel cross arm 10 fixing guarding cross arm 11 fixing of lt 3 phase x arm 12 fixing of ht / lt ti fitting 13 fixing of 11 kv disc with mp 14 fixing of 11 kv pin with insulator 15 fixing of alu knob 16 fixing of ht las ( 3 nos ) 17 fixing of lt las ( 3 nos ) 18 earthing of pole with pit including burying loop and binding per loc 19 paving of conductor , stringing binding jumpering complete with 7 / 3.35 & 7 / 4.09 or equivalent 20 paving of conductor , stringing binding jumpering complete with 7 / 2.59 & 7 / 2.11 or equivalent 21 painting of pole at ground 22 painting of pole for transformer structure with two coats for each structure 23 massconcreting of pole including materials 24 transformer structure erection complete withwiringearthingincluding fixing of open type fuse unitsh.t , l.t las jumpering, 3nos. earth pits with tubes , painting of metal part a6nd structure poles. jumpering complete in all respects except erection of transformer including concreting 25 erection of transformer below 200 kva ( derated ) 26 releasing of existing transformer irrespective of capacity. 27 transporting of dt / metering set / material up by using private vehicle other than bullock cart upto 8 kms / trip 28 transporting of dt / metering set / material up by usingprivate vehicle other than bullock cart above 8 kms / trip 29 loading of rcc pole up to 9.0 m per pole. 30 unloading of poles psc / rcc metal poles 31 drilling of hole in channel angle etc.. 3 / 4&1 per hole 32 alteration of back clamp to suit works. 33 alteration of stay clamp for suit works. 34 erection / dismantling of metering set 11 kv 35 destruction of pole concreting at site. 36 lettering with paint indanger board, bill board 37 transporting of materialsfrom substores to section up to 8 km 38 painting metal poles including cross arms ( single coating ) excluding paint cost 39 numbering of poles with paint and with base painting 40 erection of d.p. structure with ab switch, top channel, crossbrancing, hg fuse set, earthing painting providing stay and pole concreting 41 releasing of grills from rcc pole 42 dismantlimg of pole pit for below 9m ( 30 ) pole / stay 43 dismantling of rcc pole / metal poles up to 8.0 by using jcb 44 removing of ht pin 45 dismantlingof conductor , stringing binding jumpering complete with acsr...

Tamil Nadu Transmission Corporation Limited - Tamil Nadu

31399643 supply of back clamp for 8 mtr psc pole 200kg supply of back clamp for 8 mtr psc pole 200kg , back clamp for 8mtr psc pole 200kg , and 22 kv solid core type hg fuse set and transformer centre set for single pole , hvds dt structure , interface: hi speed usb 2.0...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

29700618 supply of back clamp for rsj pole, lt ti fitting ,rsj pole stay clamp special a side(200 x 100 mm) and rsj pole stay clamp special b side(200 x 100 mm) supply of back clamp for rsj pole, lt ti fitting ,rsj pole stay clamp special a side(200 x 100 mm) and rsj pole stay clamp special b side(200 x 100 mm) , supply ofback clamp for rsj pole, lt ti fitting ,rsj pole stay clamp special a side(200 x 100 mm) and rsj pole stay clamp special b side(200 x 100 mm) , back clamp for rsj pole , lt ti fitting , rsj pole stay clamp special a side(200 x 100 mm) , rsj pole stay clamp special b side(200 x 100 mm)...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

29692750 tender document for supply of 11kv standalone structure material complete set 1 11kv vertical type ab ( gos ) switch is9920 ( i to v ) , iec62271 103 2011 2 11kv solid core type hg fuse sets is9385 1980, iec60282 2 3 single square pole transformer structure material with clamp as per relavant is 4 11kv pin insulators composite type as per iec61109 5 11kv disc polymer composite insualtors as per iec61109 6 disc insulators with hard ware fittings is 2486 ( part 1&2 ) 7 9kv lightning arresters polymer composite iec 60099 4 / 2004 05 8 cross arm with back clamp as per is 9 stay set with clamp &guy insualtors is2062 ms channel as per grade a. 10 gi earth wire 8swg is4826 and is280 11 gi stay wire 7 / 11 is2141 12 lt protection kit with pin insulators & gi pin for –lt pin is7935 / 1975 for lt insulatoris1445 / 1975. 13 gi earth pipe is1239 with latest amendments 14 bolts & nuts iss1363 / 1992 15 transformer safety boot with conductor sleeves is / iec 16 danger board is13410...