Tamil Nadu Transmission Corporation Limited - Tamil Nadu

34073457 specification for supply of materials, fabrications and erection of 230 kv bus side ab switch in 230 kv autotransformer i of theni 230 110 kv ss under theni operation division tantransco under psdf scheme ii 1 earth work excavating depositing on bank with an initial lead of 10m and lift of 2 m in ( as per pwd schedule of rates double rate for narrow excavation and data a ) hard stiff clay, stiff black cotton , hard red earth , shales muram, grave stoney earth and earth mixed with small size boulders and hard gravelly soil ( pwd sch .rates ) sl no 60 2 b ) soft disintegrated rock , latterite soft rock or kankar not requiring blastingsl.no: 62 3 c ) earth work excavating depositing on bank with an initial lead of 10m and lift of 2 m in medium rock and dense medium rock not requiring blasting ( as per pwd schedule of rates double rate for narrow excavating and data a ) sl no 64 4 pcc 1:3:6 using 40 mmhbs jelly including cost of all materials, lead, lift, etc., complete with form work. 5 pcc 1:3:6 using 40 mmhbs jelly including cost of all materials, lead, lift, etc., complete with form work. 6 plastering with cm 1:3, 12 mm thick including cost of all materials, lead, lift, curing etc., complete ( as per data d & g ) 7 supplypaint of reputed make and labour, consumables for first primer coat using red oxide paintand first finish coat of painting using aluminium paintincluding consumables, after proper surface preparation using appropriate machinery to remove rust / scales etc as directed by the field engineer 8 supply of paint of reputed make ( ieasian, dulux, nerolec paint ) and labour for second coat of painting using aluminium paint including consumables 9 white washing two coats using cement paint over primer coat using white cement including cost of all materials labour lead lift etc complete. 10 colour washing two coats with approved exterior emulsionover one coat of white cement primer for structure plinth including cost of all materials, labour, lead, lift etc., complete. 11 labour, machinery, consumables for the fabrication for steel structures.with electricity supplied by department at free of cost. a ) heavy section ( 14 kg / m and above ) 12 labour, machinery, consumables for the fabrication for steel structures.with electricity supplied by department at free of cost. b ) light section ( below 14 kg / m ) 13 labour for the erection of the fabricated steelstructures with electricity supplied by department at free of cost. a ) heavy section ( 14 kg / m and above ) 14 labour for the erection of the fabricated steelstructures with electricity supplied by department at free of cost. b ) light section ( below 14 kg / m ) 15 labour, machinery, consumables for fabrication, erection of earthmat, earth connection, earth electrode, earthspike ( including sharpening of earth spike ) . as directed by the field engineer with electricity supplied by department at free of cost. 16 labour for excavating and refilling of earth / trench for earthmat, cable, etc., of any size / depth narrow excavation as directed by the field engineer. normal clay / hard gravel soil. 17 labour for dismantling of isolators including accessories, cost ofconsumables and lubricants and as directed by the field engineer. with electricity supplied by department at free of cost. 230 kv with earth 18 labour for erection of isolators with proper allingmentsincluding accessories, meggering and cost ofconsumables and lubricants and as directed by the field engineer. with electricity supplied by department at free of cost. 230 kv with earth 19 labour for the dismantling of jumper / droppers using a ) moose / zebra / panther conductors including modification of end clamps, providing holes etc wherever necessary as directed by the field engineer. ( lc period 30 % extra ) 20 labour for the erection of jumper / droppers using a ) moose / zebra / panther conductors including modification of end clamps, providing holes etc wherever necessary as directed by the field engineer. ( lc period 30 % extra ) 21 supply and provision of m8, m10, m12 and m16 ( full / half thread ) g.i.bolt and nuts of various sizes including plate / spring washers as required and as directed by the field engineer. 22 supply of aluminium power connectors / clamps / fittings with ss bolts and nuts , freight including modification if any etc., confirming to isas per the drawing and specifications . ( sl 83 ) a ) acsr panther conductor 23 supply of steel items and ab switches as per tneb specification including cost of materials, loading, transporting, unloading and delivery at site, complete. a ) 50 x 8 mm m.s. flat 24 b ) 65 x 10 mm m.s. flat 25 c ) 200 x 100 mm r.s. joists 26 d ) 50 x 50 x 6 mm m.s. angle 27 f ) 100 x 50 mm m.s. channel...

Indian Institute Of Management - Tamil Nadu

34068102 supply of electrical and civil materials to iim tiruchirappalli, 1 2 inch b class gi pipe for street light pole . ( bottom closed with plate)thickness:3mm ,height:14 feet. nos 04 2 30 w led street light fitting ,size:1 x ¼ “ to 1 x ¾” . make :inventa / crompton / havells. nos 04 3 name: 3 core x 4 sqmm copper armored cable, make: finolex / havells / poly cab) meter 80 4 1 ½ “ hdpe hose meter 80 5 single pole 6a mcb , make: schnider /abb/l& t nos 04 6 ip 65 junction box ,dimension: 125 x 150 x 100 mm (rectangular) with 4 pole terminal block, necessary bolt & nut etc.. (indicative image attached in annexure iii of tender document) nos 04 7 insulation tape nos 10 8 gi adaptor – size 2.5 with necessary bolt & nut etc. (indicative image attached in annexure iii of te nder document) nos 04 9 steel primer make: asian / nippon / berger 10 turban oil for painting litre 01 11 aluminium paint make:asian / nippon / berger litre 01 12 emery sheet, grit size :80 nos 04 13 1 “ pvc l bow nos 30 14 1.5 sqmm copper cable make: :finolex / havells / poly cab (black & red ) coil 02 15 2 “ u clamp with nut nos 04 16 cement 43 grade (50 kg) make: ultratech / dalmia / chetinad...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34060020 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenance in puzhal sub division of avadi division 2 excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34059997 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenancein redhillssubdivision of avadi division 2 excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34059973 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenancein korattursubdivision of ambattur division excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34039701 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenanceinie ambattursubdivision of ambattur division 2 excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34039692 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenancein ambattursubdivision of ambattur division 2 excavation of structure pole pit 2x3x1 / 6 th of height 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road ( earth ) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe ( 1 drum: 200 m ) 35 3x120 sq mm xlpe ( 1 drum: 200 m ) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m ) 45 120 sq. mm ( 1 drum 500 m ) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road ( earth ) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., 58 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m 59 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) 60 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) 61 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4 / 6 / 8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) 73 excavation ofpole pit for 7.5 / 8 meters 74 erection of pole pit for7.5 / 8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1 / 2size 79 erection of v cross arm41 / 2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay ( excluding pole erection and earth excavation ) 95 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 96 7.5 meters / 8 meters pole 97 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7 / 2.59 mm acsr / 7 / 2.50 aaac 101 upto 7 / 3.35 mm acsr / 7 / 3.15 aaac 102 raccoon 7 / 4.09 per 103 dog conductor 7 / 4.72 104 numbering of location / each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding ( split neutral grounding ) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer / line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a ) .loading of poles 129 7.5 / 8 meters pole / each 130 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 131 b ) .un loading of poles 132 7.5 / 8 meters pole ( rcc / psc ) / each 133 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity ( pole mounted structure ) 142 dp / tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box / 6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 33 kv ab switch at ss / structure 165 tree cutting ( tree clearance ) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle / bushes / velikathan clearence 169 straitening ofleanedht / lt poles 170 pin point location 171 cut point location 172 resagging of ht / lt lines for all conductor sizes 173 re sagging ( ht ) 7 / 4.72 mm 174 re sagging ( ht / lt ) 7 / 4.09 mm 175 re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm 176 re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles / rsj / tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation / office premises per sq.mtr ( jungle clearance ) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum ( to&fro ) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33 / 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv / 11 kvlas 199 cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33 / 11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

34039541 rate contract for erection , maintenance and dismantlying of electrical networks ( oh line &cable ) including ss maintenancein avadi subdivision of avadi division erection of distribution transformer structure , excavation of structure pole pit 2x3x1 / 6 th of height , erection of 9.14 m rcc / 9.0 mtr psc / rsj pole , transporting of 9.14 m poles from road side to pole pit , structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. , erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. , excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete , sleeve concrete for stay set including all materials , erection of hg fuse set with transport , erection of 11 kv ab switch complete setwith transport , transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt , erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure , for triple pole and four pole structure , erection of l.t.open type fuse unit including cable jumpering upto the line. , providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. , erection of h.t. jumpering in dp structure complete , erection of h.t. las , erection of l.t. las , erection of dt excluing loading and unloading , upto 100 kva , above 100 kva , painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. , loading and unloading of distribution transformer at site and store. , dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) , upto 100 kva , above 100 kva , crane hire charges , laying of ht cable , excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., , normal road ( earth ) , tar road , concrete road , transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. , 3x300 sq mm xlpe ( 1 drum: 200 m ) , 3x120 sq mm xlpe ( 1 drum: 200 m ) , laying of ht cable , laying of 300 sq mm xlpe cable , laying of 120 sq mm xlpe cable , covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough , refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. , transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 empty drums ) , laying of lt cable , tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. , 240 sq.mm ( 1 drum 200 m ) , 120 sq. mm ( 1 drum 500 m ) , excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. , normal road ( earth ) , tar road , concrete road , laying of lt cable , laying of 240 sq.mm cable , laying of 120 sq.mm cable , laying of 25 sq.mm cable , laying of 16 sq.mm cable , refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. , erection of pillar box , erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc., , 4 / 6 / 8 way & mini pillar boxes for 2 feet i e 0.6m , 4 / 6 / 8 way& mini pillar boxes for 3 feet i e 0.9m ( rate for hb / con ) , 4 / 6 / 8 way & mini pillar boxes for 4 feet i e 1.2 m ( rate for hb / con ) , 4 / 6 / 8 way & mini pillar boxes for 5 feet i e 1.5 m ( rate for hb / con ) , cleaning & painting with aluminium paint 2 coats & numbering with fdr details , 8 way pillar box , 6 way pillar box , 4 way pillar box , mini way pillar box , dismantling of pillar box , dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. , 4 / 6 / 8 way pillar box , mini pillar box , miscellaneous oherection work , erection of rcc / rsj / psc pole and other poles including excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) , excavation ofpole pit for 7.5 / 8 meters , erection of pole pit for7.5 / 8 meters , excavaion of polepit for 9.14 meters , erection of polepit for 9.14 meters , base concerting 30 cm thick for one pole including of all materials , erection of v cross arm 3 1 / 2size , erection of v cross arm41 / 2 size , erection of tapping channel 5 size , erection of stay set complete , fixing of 11 kv ti fitting , fixing of 33 kv ti fitting , fixing of lt 3 phase cross arm , fixing of lt ti fitting , fixing of single phase cross arm , lt pin insulator with pin , lt shackle with strap sets , 11 kv pin insulator with gi pin , 33 kv pin insulator with gi pin , 11 kv strain disc with metal parts , 33 kv strain disc with metal parts , fixing of aluminium knob , providing of fly stay ( excluding pole erection and earth excavation ) , concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) , 7.5 meters / 8 meters pole , 9.14 meters pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) , earthing of poles , paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht / lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. , upto 7 / 2.59 mm acsr / 7 / 2.50 aaac , upto 7 / 3.35 mm acsr / 7 / 3.15 aaac , raccoon 7 / 4.09 per , dog conductor 7 / 4.72 , numbering of location / each including cost of paint and labour , providing of guarding per span excluding of stay set erection , 2 wire flat guarding ( split neutral grounding ) , 4 wire flat guarding , craddle guarding including earthing and earth pit excavation , erection of street ligh fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. , erection of cross bracing set , dp structure , tp structure , erection oftop channels , 10 centre , 15 centre , erection of33 kv centre rotating ab switch complete set , erection of11 kv centre rotating ab switch complete set , erection ofspacers , line seperators & jumpers , single phase spacer / line seperators , three phase spacer / line seperators , provision of paa jumper per phase for lt , provision of paa jumper per phase for ht , metering set loading & unloading , loading , un loading , erection ofmetering sets , up to 11 metering set , a ) .loading of poles , 7.5 / 8 meters pole / each , 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each , b ) .un loading of poles , 7.5 / 8 meters pole ( rcc / psc ) / each , 9.14 meters pole rcc / 9.0 mtr psc / 9.14 rsj / each , loading of conductor drum , conductor drum of all sizes with conductor , conductor drum of all sizes without conductor , un loading of conductor drum , conductor drum of all sizes with conductor , conductor drum of all sizes without conductor , maintenance work , maintenance of dt structure for various capacity ( pole mounted structure ) , dp / tp structure maintenance , dt maintenance , replacement of ht bushing rod , replacement of lt bushing rod , replacement of gasket , structure earthi re wiring . , replacement of structure earthing in complete without material , dt structure yard cleaning , numbering of location including cost of paint and labour , maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. , 8 way pillar box / 6 way pillar box , 4 way pillar box , mini pillar box , fixingofmissing doors in pillars including materials , ms mini pillar door , ms 4 waypillar door , ms 6 way / 8 waypillar door , frp 4 way pillar door , maintenance of 11 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . , 11 kv ab switch at structure in work site , 11 kv ab switch at ss , maintenance of 33 kv abs only. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . , 33 kv ab switch at ss / structure , tree cutting ( tree clearance ) , cutting of big tree fouling on the line. , clearing of heavy bushes , jungle / bushes / velikathan clearence , straitening ofleanedht / lt poles , pin point location , cut point location , resagging of ht / lt lines for all conductor sizes , re sagging ( ht ) 7 / 4.72 mm , re sagging ( ht / lt ) 7 / 4.09 mm , re sagging ( ht / lt ) 7 / 3.35 mm and 7 / 3.15 sqmm , re sagging ( ht / lt ) 7 / 2.59 mm and 7 / 2.50 sqmm , dismantling works , dismantling of 9.14 mtr. poles / rsj / tubular poles , dismantling of8mtr / 7.5 mtr poles / , dismantling of stay set complete , dismantling of conductors upto 7 / 2.59 mm including coiling and transporting from workspot to road side , dismantling of conductors 7 / 3.35 mm and above including coiling and transporting from workspot to road side , dismantling of damaged 6 way / 4 waypillar box , dismatling of transformer structure materials , dismatling ofab switch with hg fuse set , releasingof v x arm , stacking of materials / scarp , substation maintenance , removing weed in substation / office premises per sq.mtr ( jungle clearance ) , hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. , transporting offilter machine unit& oil drum ( to&fro ) , cleaning of110 kv breakersincluding cts and allied maintenance work , cleaning of 110 kvlas , cleaning of 110 kvab switch and applying petroleum jelly , cleaning of 110 kv power transformer insulators and other maintenance work , cleaning of 110 kv bus insulators , cleaning of33 / 11 kv breakersincluding cts and allied maintenance work , cleaning of 33 kv / 11 kvlas , cleaning of 33 / 11 kvab switch including tightening of bolt & nutt and applying petroleum jelly , cleaning of 33 / 11 kv kv power transformer insulators and other maintenance work , cleaning of 33 / 11 kvbus insulators , aluminium painting in substation , 33kvstructure , 11kv structure , power transformer , breaker , erection ofsingle poledtstructure , loading andunloading of rcc 9 / 9.14 mtrsquare pole , excavation ofpole pit for 3 x 3 x 6size , erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. , loading , unloading and erection ofhvdsdt ( 16 , 25 & 40 kva ) , excavation of stay pit for 2 x 2 x 6 size , erection of stay set complete including base plate , single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt , fixing of earth connections with gi wire , bolt and nuts. , erection oftransformerstructure materials , erection of hg fuse set , erection of 11 kv ab switch complete set , provision of mass concreting of pole with cement , sand and jelly , erection of h.t. las , erection of l.t. las , erection of h.t. jumpering in dt structure complete , erection of l.t.open type fuse unit including cable jumpering complete set. , erection of ab switch alone for dp switch...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33894555 supply of g.i back clamp suitable for 9 mtr psc pole as per tenderspecification , supply ofg.i back clamp for 9.00 mtr psc pole ( 300 kg ) , 0.6kva ups , g.i back clamp for 9.00 mtr psc pole ( 300 kg ) , pole pit for 9.0m and 9.14 m psc / rcc / all metal poles ( each pit ) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting / cheseling required [ specific approval should be obtained from concerned ee ] , stay pit , in ordinary soil [ 0.95 x 0.6 x 1.2m ] , semi rocky soil , stay pit in heavy rocky soil where blasting / cheseling reqiured [ specific approval should be obtained from concerned ee ] , erection of poles & stays ( including refilling of excavated earth ) , erection of 7.5m / 8.0m poles [ rcc / psc ] , erection of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. ( including stay pit excavation & refilling & erection ) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt / ht ti fitting , fixing of lt 3 ph x arm , fixing of 3 [ 1 / 2 ] v` x arm , fixing of4 [ 1 / 2 ] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc / polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [ including transport of condutor from road side to work spot ] per run , upto 7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , acsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , acsr 7 / 4.09 mm , above 7 / 4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit ] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [ double side earthing ] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [ including all materials ] . , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set ( 4 sets ) , mass concreting ( cement:sand:jelly supplied by the contractor ) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [ 2 nos channel ] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ ht side ] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [ two coat of red oxide ] all metal parts ( excluding cost of paint ) . , painting of stru. complete excluding dt [ one coat alu paint, excluding cost of paint ) , colour washing of 2 numbers structure pole [ excluding cost of distember / snowsem ] , painting name of ss at seating channel including paint. , painting of dt alone [ excluding painting ] with red oxide and double coating of aluminium paint. , dt metering arrangement ( without materials ) , erection of distribution transformer / dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [ black background and yellow letters ] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp / led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl / 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection / dismantling of metering set 11 kv / 22 kv / 33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5 / 8 , all size angles / channel above 5 / 8 , slot holes in flat / angles / channel upto 3 / 4 , slot holes in flat / angles / channel above 3 / 4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt [ pin point ] location , set right the leaning pole in both ht & lt [ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [ during conductor or support change ] , releasing and erection 3 ph sc wire [ during conductor or support change ] , destruction of pole concerting at site. , retrieving grill from detoriated pole [ grill separate from damaged pole ] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [ railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc / metal pole [ per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc / psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer / metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer / metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [ rcc / psc ] , dismantling of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt / ht ti fitting , dismantling of lt / ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3 [ 1 / 2 ] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc / polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7 / 4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Bharat Heavy Electricals Limited - Tamil Nadu

33872182 arc main annual rate contract for the year 2022 23 for complete manufacture of aph, esp, fans, fgd other bap products components as per respective bhel drawings from the raw materials issued by bhel. rs group :aphprs group description : air pre heater panels and pedestals ( to quote for all rs in this group ) 2 aph housing panels like brd panel assy, rdb panel assy, side panel assy including plate bending, rolling 3 only rolling, stacking and packing of shell plates all products 4 aph housing items like main / primary / side / other pedestals including rolling , bending – bhel / alstom design ( bps items supplied as component ) 5 rs group : autors group description : auto ( saw ) welding process ( to quote for all rs in this group ) 6 fabricationofbuiltup tranverse roof beamwherein the sections are madeout of platesby saw [ ndt charges [ other than lpi ] arepayable extra ] . 7 fabrication of floor beams, i beam, box beams, for fgd / chp / ahp etc., ( other than esp beams ) h type, ] [ type, box type made of e350 material where in sections are made of plates by saw process ( ndt charges other than lpi payable extra ) 8 fabrication of longitudinal roof beam / transverse roof beam / roof beams having multiple stiffeners ( randm projects ) wherein the sections are made out of plates by saw process. ndt charges [ other than lpi ] are payable extra. 9 fabrication of beam / box type built up columns ( 4 fillets ) covered in fgd / chp / ahp / bop etc., made of plates of e250 grade material. ndt charges ( other than lpi ) payable extra 10 fabrication of floor beams, monorail beams, i – beams, box beams for fgd / chp / ahp etc., ( other than esp beams ) h type, ] [ type , box type made of e250 material unit piece weight upto 1 mt where in sections are made of plates by saw process ( ndt charges other than lpi payable extra ) 11 fabrication of floor beams, monorail beams, i – beams, box beams for fgd / chp / ahp etc., ( other than esp beams ) h type, ] [ type , box type made of e250 material unit piece weight above 1 mt and upto 3 mt where in sections are made of plates by saw process ( ndt charges other than lpi payable extra ) 12 fabrication of floor beams, monorail beams, i – beams, box beams for fgd / chp / ahp etc., ( other than esp beams ) h type, ] [ type , box type made of e250 material unit piece weight above 3 mt where in sections are made of plates by saw process ( ndt charges other than lpi payable extra ) 13 beam / box type bolted design columns ( 4 fillets ) with attachments covered in fgd / phs / chp / ahp / bop etc., made of e250 grade material where in sections are made of plates by saw process unit piece weight upto 1 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 14 beam / box type bolted design columns ( 4 fillets ) with attachments covered in fgd / phs / chp / ahp / bop etc., made of e250 grade material where in sections are made of plates by saw process unit piece weight above 1 mt & upto 3 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges 15 beam / box type bolted design columns ( 4 fillets ) with attachments covered in fgd / phs / chp / ahp / bop etc., made of e250 grade material where in sections are made of plates by saw process unit piece weight above 3 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges 16 ph box type bolted design columns ( 6 fillets ) with attachments covered in phs / chp / ahp / bop etc., made of e250 grade material unit piece weight upto 10 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 17 ph box type bolted design columns ( 6 fillets ) with attachments covered in phs / chp / ahp / bop etc., made of e250 grade material unit piece weight above 10 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 18 plus / star type bolted design columns ( 12 fillets ) with attachments covered in phs / chp / ahp / bop etc., made of e250 grade materials unit piece weight upto 10 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 19 plus / star type bolted design columns ( 12 fillets ) with attachments covered in phs / chp / ahp / bop etc., made of e250 grade materials unit piece weight above 10 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 20 beam / box type bolted design roof girders made of e250 grade materials 21 beam / box type bolted design columns ( 4 fillets ) withattachments covered in fgd / phs / chp / ahp / bop etc., made of e350 grade material where in sections are made of plates by saw process unit piece weight upto 1 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 22 beam / box type bolted design columns ( 4 fillets ) with attachments covered in fgd / phs / chp / ahp / bop etc., made of e350 grade material where in sections are made of plates by saw process unit piece weight above 1 mt & upto 3 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges 23 beam / box type bolted design columns ( 4 fillets ) with attachments covered in fgd / phs / chp / ahp / bop etc., made of e350 grade material where in sections are made of plates by saw process unit piece weight above 3 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges 24 ph box type bolted design columns ( 6 fillets ) with attachments covered in phs / chp / ahp / bop etc., made of e350 grade material unit piece weight upto 10 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 25 ph box type bolted design columns ( 6 fillets ) with attachments covered in phs / chp / ahp / bop etc., made of e350 grade material unit piece weight above 10 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 26 plus / star type bolted design columns ( 12 fillets ) with attachments covered in phs / chp / ahp / bop etc., made of e350 grade materials unit piece weight upto 10 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 27 plus / star type bolted design columns ( 12 fillets ) with attachments covered in phs / chp / ahp / bop etc., made of e350 grade materials unit piece weight above 10 mt ( part of a du or single part du ) . ( attachment means straight / taper welded attachments with drillied connections on web and flanges ) 28 beam / box type bolted design roof girders made of e350 grade materials 29 rs group : chima rs group description : chimney base and shells ( to quote for all rs in this group ) 30 manufacture of chimney shell base plate ( ndt charges ( other than lpi ) payable extra ) 31 manufacture of chimney shells thickness upto 16 mm with trial assembly ( rate is inclusive of trail assembly ) ( the chimney shells with or without flange;shells made up of half segments or full ( ndtcharges ( other thanlpi ) payable extra ) . 32 manufacture of chimney shells thickness above 16 mm upto 25 mm with trial assembly ( rate is inclusive of trail assembly ) . ( the chimney shells with or without flange;shells made up of halfsegmentsorfull ( ndtcharges ( other than lpi ) 33 manufacture and rolling of chimney shells thickness above 25mm to 32 mm with trial assembly ( rate is inclusive of trialassembly ) .the chimney shells are with or with out flange.shellsmade up of half segment or full. ( ndt charges ( other than lpi ) payable extra ) . additional material given for rolling allowance will be booked as off cut. 34 rs group : chimb rs group description : chimney base and shells ( to quote for all rs in this group ) ( vendors quoting for chim bhas to quote for chim aalso other wise their offer will not be considered ) 35 manufacture and rolling of chimney shells thickness above 32mm to 40 mm with trial assembly ( rate is inclusive of trialassembly ) .the chimney shells are with or with out flange.shellsmade up of half segment or full. ( ndt charges ( other than lpi ) payable extra ) .additional material given for rolling allowance will be booked as off cut. 36 rs group : chimc rs group description : chimney base and shells ( to quote for all rs in this group ) ( vendors quoting for chim chas to quote for chim a & chim b also other wise their offer will not be considered ) 37 manufacture and rolling of chimney shells thickness above 40mm to 50 mm with trial assembly ( rate is inclusive of trialassembly ) .the chimney shells are with or with out flange . shellsmade up of half segment or full. ( ndt charges ( other than lpi ) payable extra ) . additional material given for rolling allowance will be booked as off cut. 38 rs group : damprs group description : dampers ( louver and biplane ) ( to quote for all rs in this group ) 39 flap damper of fan [ upto 0.50 mt ] 40 flap damper of fan [ above 0.50 mt to 2.0 mt ] 41 flap damper of fan [ above 2.0 mt to 5.0 mt ] 42 flap damper of fan [ above 7.0 mt to 10.0 mt ] 43 flap damper of fan [ above 10 mt ] 44 flap damper of fan [ above 5.0 mt to 7.0 mt ] 45 biplane damper including seals mfg [ upto 0.50 mt ] testing charges ( if required ) payable extra 46 biplane damper including seals mfg [ above 0.50 mt to 2.0 mt ] testing charges ( if required ) payable extra 47 biplane damper including seals mfg [ above 2.0 mt to 5.0 mt ] testing charges ( if required ) payable extra 48 biplane damper including seals mfg [ above 5.0 mt to 7.0 mt ] testing charges ( if required ) payable extra 49 biplane damper including seals mfg [ above 7.0 mt to 10.0 mt ] testing charges ( if required ) payable extra 50 biplane damper including seals mfg [ above 10.0 mt ] testing charges ( if required ) payable extra 51 louvre damper including seals mfg [ upto 0.50 mt ] testing charges ( if required ) payable extra 52 louvre damper including seals mfg [ above 0.50 mt to 2.0 mt ] testing charges ( if required ) payable extra 53 louvre damper including seals mfg [ above 2.0 mt to 5.0 mt ] testing charges ( if required ) payable extra 54 louvre damper including seals mfg [ above 5.0 mt to 7.0 mt ] testing charges ( if required ) payable extra 55 louvre damper including seals mfg [ above 7.0 mt to 10.0 mt ] testing charges ( if required ) payable extra 56 louvre damper including seals mfg [ above 10.0 mt ] testing charges ( if required ) payable extra 57 circular dampers upto 150kg / piece 58 circular dampers above 150kg / piece 59 rs group : gate a rs group description : gulliotine gates ( to quote for all rs in this group ) 60 gate assy including seals mfg electrically operated upto 7 mt. ( without testing, testing charges per no in extra rs will be provided ) 61 pneumatic fittings and air tank for gates including testing 62 gate assy including seals mfg pneumatically operated upto 2 mt ( without testing, testing charges per no in extra rs will be provided ) 63 gate assy including seals mfg pneumatically operated above 2 mt to 7 mt ( without testing, testing charges per no in extra rs will be provided ) 64 rs group : gate b rs group description : gulliotine gates ( to quote for all rs in this group ) ( vendors quoting for gatebhas to quote for gatea also otherwise their offer will not be considered ) 65 gate assy including seals mfg electrically operated above 7 mt to 10 mt ( without testing, testing charges per no in extra rs will be provided ) 66 gate assy including seals mfgelectrically operated above 10 mt. ( without testing, testing charges per no in extra rs will be provided ) 67 gate assy including seals mfg pneumatically operated above 7.0 mt ( without testing, testing charges per no in extra rs will be provided ) 68 rs group : exprs group description : expansion joints ( saw tooth / bellow type ) ( to quote for all rs in this group ) 69 metallic expn.joint [ bellow type ] with seal plate, expansion joint s type. 70 metallic expn.joint [ saw tooth / bellow type ] with seal plate, expansion joint ( stainless steel ) . ref:drg: 3 fw 252 00006 or equivalent 71 rs group : fsprs group description : spiral casings ( to quote for all rs in this group ) 72 singlesuctionspiral casing above 500 kgs , liner, transition piece, etc. 73 double suction spiral casing including base / support, etc.above 500 kgs to 30 mt 74 double suction spiral casing including base / support, etc.above 30 mt 75 spiral casing ( upto 500 kgs per piece ) 76 rs group : genrs group description : general ( to quote for all rs in this group ) 77 cut to size / suit dus per piece weight > 100 kgs, structurals cutting from beams, channels. structurals / hand rail tubes to be cut to size for galvanizing and reqd. in rm. ( blasting and galvanizingcharges are payable extra to the respective vendor ) . 78 cut to size dus per piece weighing above 10 kgs and upto 25kgs 79 cut to size dus per piece weighing more than 25kgs and upto 50kgs 80 cut to size dus per piece weighing more than 50kgs to 100kgs 81 cut to suit of dus per piece weighing above 10 kgs and upto 25kgs 82 cut to suit of dus per piece weighing above 25 kgs to 50 kgs 83 cut to suit of dus per piece weighing above 50 kgs to 100 kgs 84 cut to size dus per piece ( unit ) weight above 2 kgs and upto 10 kgs 85 cut to suit of dus per piece ( unit ) weight above 2 kgs and upto 10 kgs 86 cut to size dus per piece ( unit ) weight upto 0.2 kg 87 cut to size dus per piece ( unit ) weight above 0.2 kg to 0.5 kg 88 cut to size dus per piece ( unit ) weight above 0.5 kg to 2 kg 89 cut to suit / shape dus per piece ( unit ) weight upto 0.2 kg 90 cut to suit / shape dus per piece ( unit ) weight above 0.2 kg to 0.5 kg 91 cut to suit / shape dus per piece ( unit ) weight above 0.5 kg to 2 kg 92 monorail beam ( straight ) , longitudinal, transverse / beam [ rolled section ] having full / partial bolted connection, carbon steel extra width plate, packing crates 93 roof trusses ( in x55 ) , corten extra width plates, support beam with cover plate welding, box type bracing fully welded type, channel / beam bracings with full cover plates / intermitant cover plates, silencer base / supports, monorail beam ( straight ) involving additional channel on top flange ( rolled section ) 94 welded design esp / bunker / fgd / chp / ahp / bop columns h, ] [ , box type to be manufactured out of rolled section channel & beam above 203 mm & upto 305mm [ ndt changes [ other than lpi ] are payable etc. 95 welded design esp / bunker / fgd / chp / ahp / bop columns h, ] [ , box type to be manufactured out of rolled section channel & beam above 305mm [ ndt changes [ other than lpi ] are payable etc. 96 hopper ridges with cover plate and stiffener in x43 97 welded type columns h type, ] [ type , box type of fgd / esp / chp / ahp / bop etc., to be manufactured out of rolled sections of channels and beams up to 203 mm ( ndt charges other than lpi payable extra ) 98 roof panels assy with collar [ both square andround type ] 99 manufacture of a ) fgd tanks shells ( ls slurry tank, process water tank, dm water tank etc bottom to top tiers made from plates 16 mm to 6 mm thick ) inclusive of tank covers and tank base ( conical ) . ref drg: 0fw74200683 b ) cyclone separator involving shell rolling / cone rolling of up to 16 mm thick.c ) shock bar ( flat type ) excluding heat treatment. 100 manufacture and trial assembly of conical hoppers of esp having multiple tiers including ss lining ref drg: 0 79 845 01619, 20 101 manufacture of silo tank shells both straight and conical with stainless steel liner sheets & also having drill holes ( for plug welding ) 102 complete manufacture of ring girders used for mounting silos / tanks made of plates. ref drg: 06610000012 or equivalent 103 frame part middle [ including packing ] & pipe support saddle for various sizes 104 suspension frame arrangement, frame part top, frame part bottom all including packing, transition ducts, angular ducts, oil pan rectifier 105 frame part top, frame part bottom with hollows bend at ends ( bending by hydraulic or welding ) inclusive of packing. 106 suspension frame arrangement includingmanufacture of hanking hook from rawmaterial supplied by bhel 107 hoppers with transition from square to circular openings and transition ducts having opening from circular to square / rectangular openings.ref drg:1 79 845 07058 60. 108 absorber casing panels, ducts walls and duct including t y elbow, bend, transition [ with or without corner welding both sides rectangular opening ] with flanges having elyptical opening ( where flanges are formed by plate ) for fgd, esp, fans, aph, chimney, etc ref: 0 fw 322 07260 109 ducts walls and duct including t y elbow, bend, transition [ with or without corner welding both sides rectangular opening ] , absorber casing panels involving all materials for fgd, esp, fans, aph, chimney, coal and ash handling etc., heating chamber, hopper lower with corner welding ( without ss fabrication ) , roof of suction hood , tank cover assembly, inlet and outlet funnel for esp excluding trial assembly 110 hopper lower with heating chamber with ss fabrication, ss guide vanes, ss duct walls. 111 bolted type columns h type, ] [ type , box type of fgd / esp / chp / ahp / bop etc., to be manufactured out of rolled sections of channels and beams above 305 mm ( ndt charges other than lpi payable extra ) 112 bolted type box bracings fully welded type, angle / channel / beam bracings with full cover plates / intermitant cover plates involving above ismc / ismb 125 for all products manufactured out of rolled sections. 113 mono rail beams up to beam 450 with radius rolling 114 mono rail beams up to beam > 450 with radius rolling 115 trestles / trusses made of angles / channels / hollows etc., gallery girders, transmission / gallery structures requird in fgd / chp / ahp / bop etc., having full / partial bolted connections. 116 bolted type columns h type, ] [ type , box type of fgd / esp / chp / ahp / bop etc., to be manufactured out of rolled sections of channels & beams above 203 mm& up to 305 mm ( ndt charges other than lpi payable extra ) 117 bolted bracings box type fully welded type, channel / beam bracings with full cover plates / intermitant cover plates made of angles, channel & beam upto 125 mm 118 bolted type columns h type, ] [ type , box type of fgd / esp / chp / ahp / bop etc., to be manufactured out of rolled sections of channels and beams up to 203 mm ( ndt charges other than lpi payable extra ) 119 fan silencer with tarpaulin covering, rubberexpn. joint [ ply rubber binding with glue ] 120 rs group : imprs group description : fan implellers ( to quote for all rs in this group ) 121 seal air fan / radial fan impeller assembly unit wt upto 500 kgs [ ht / ndt charges [ other than lpi ] payable extra. ] 122 rotor assembly with transport stand ( seal air fan ) full scope [ heat treatment, ndt charges [ other than lpi ] payable extra. ] 123 radial impellers both single and double suction full scope ( ndv / ndzv ) including balancing unit wt above 500 kgs and upto 1500 kgs ref drg: 1 56 234 04598, 1 56 125 04131 or equivaqlant. 124 radial impellers both single and double suction full scope ( ndv / ndzv ) including balancing unit wt above 1500 kgs and upto 3000 kgs ref drg:1 56 226 04591 or equivqlant 125 radial impellers both single and double suction full scope ( ndv / ndzv ) including balancing unit wt above 3000 kgs upto 4500 kgs ref drg: 1 56 226 04538 or equivalent. 126 radial impellers both single and double suction full scope ( ndv / ndzv ) including balancing unit wt above 4500 kgs ref drg: 1 56 227 04367 / 04046 or equivalent. 127 extra % for full naxtra impeller ( applicable for rs 106d to 106h ) 128 impeller hub an type only 129 impeller assembly upto 500kgs ( hub as componenetsupplied by bhel ) 130 impeller assembly [ above 500kgs to 1000 kgs ] 131 impeller assy [ above1000 kgs ] hub suppliedas component by bhel an type 132 impeller hub / deep dish end only ( czech type ) 133 impeller ass y running wheel upto 500 ( hub dished end supplied as components czech type ) 134 impeller ass y running wheel above 500 to 1000 kgs ( hub dished end supplied as components czech type ) 135 impeller ass y running wheel above 1000 kgs ( hub dished end supplied as components czech type ) 136 complete manufacture of impeller with hub assembly an type [ impeller including hub fabrication including dynamic balancingfor weight ranging 100 kgs to 500 kgs ht / ndt charges [ other than lpi ] payable extra. frequency tuning not in the firms scope. 137 complete manufacture of impeller with hub assembly an type [ impeller including hub fabrication including dynamic balancingfor weight ranging above 500 kgs to 1000 kgs ht / ndt charges [ other than lpi ] payable extra. frequency tuning not in the firms scope. 138 complete manufacture of impeller with hub assembly an type [ impeller including hub fabrication including dynamic balancingfor weight rangingabove 1000 kgs.ht / ndt charges [ otherthanlpi ] payable extra. frequency tuning not in the firms scope. 139 complete manufactuere of impeller with hub assembly ( czech type ) ( impeller including hub abrication, dynamic balancing for weight ranging 100 kgs to 500 kgs ( ht / ndt charges ( other than lpi ) payable extra. frequency tuning not in firms scope. 140 complete manufactuere of impeller with hub assembly ( czech type ) ( impeller including hub fabrication, dynamic balancing for weight rangingabove 500 kgs to 1000 kgs ( ht / ndt charges ( other than lpi ) payable extra. frequency tuning not in firms scope. 141 complete manufactuere of impeller with hub assembly ( czech type ) ( impeller including hub abrication, dynamic balancing for weight ranging above 1000 kgs ( ht / ndt charges ( other than lpi ) payable extra. frequency tuning not in firms scope. 142 impeller assembly [ dl radial type ] upto 1600mm dia czech design including balancing.ht / ndt charges [ other than lpi ] payable extra 143 impeller assembly [ dl radial type ] above 1600mm dia czech design including balancing.ht / ndt charges [ other than lpi ] payable extra 144 dynamic balancing of impeller / hub / shaft upto 50 kg. 145 dynamic balancing of impeller above50 kgs to 200 kgs 146 dynamic balancing of impeller above200 kgs 147 rs group : punrs group description : punching process ( to quote for all rs in this group ) 148 screen sheets without punching ( including packing ) , vertical splitter, hopper defelection plate, attachment iron, ridge capsheets in x43, shield, angle bar , motor shield, side eaves, end eaves. 149 shock bar guide of sheet type, guide vane. 150 screen sheets with punching including packing 151 insulator retainers [ type d ] from the blanks and scrap of screen sheets of rs 71a. to bundle with a binding wire consisting of 100 nos each 10 bundles to put in a gunny bag. rate inclusive of one coat of red oxide / rp oil application 152 ee holder 1000 nos to be put per gunny bag. rate inclusive of onecoat of red oxide / rp oil application 153 hanging hook [ 150 nos. to be put per gunny bag ] . rate inclusive of onecoat of red oxide / rp oil application 154 retainer type d [ raw material issued as sheets ] rate inclusive ofone coat of red oxide / rp oil application 155 retainer square type a to drg: 6172 0236 made of sh1.25x903 is 513 dd [ raw material issued in coil form ofeach 20 tons ] . also to drg no. [ drg: 6160 0142 ] made ofsheet 2.00 mm [ raw material issued as sheets ] to make use of screen sheet strip scrap. packing is to be done as follows. to bundle with a binding wire consisting of 100 nos each. 10 bundles to be put in a gunny bag. rate inclusive of one coat of red oxide / rp oil application. 156 insulator retainers [ type d1 drg: 4 79 068 00566 ] from the blanks and scrap of screen sheets of rs 71a. to bundle with a binding wire consisting of 100 nos each 10 bundles to put in a gunny bag. rate inclusive of one coat of red oxide / rp oil application. 157 aluminum casing supports upto 650 mm ref drg: 6160 0141 var.01 158 aluminum casing supports above 650 mm ref drg: 6160 0141 var.03 159 shock bar plate to drawing 4 78 324 00361 made out of flat 65x8.one coat of redoxide primer and smoke gray also to be applied. no invisible and process allowance allowed 160 rs group : sealrs group description : haste alloy seals ( to quote for all rs in this group ) 161 loose seals of port seal, bonnet seal, biplaneblade seal, tip seal [ rate per leaf ] 162 welded seal [ set of centre seals bottom seal, side seal. stud supplied as components by bhelif required ] 163 single leaf blade seal, tip seal. 164 bulb seal 165 set ofjamb seals 166 rs group : ssctrs group description : stainless steel corner tube ( to quote for all rs in this group ) 167 complete manufacture of stainless steel corner tube segment including packing as per the drawing for which stainless steel plate 5 / 6 mm raw material will be issued from bhel. sample drawing 3 79 744 03243.unit weight 30.764 kg. rate inclusive of one joint per piece. 168 rs group : taphrs group description : tubular air heater ( to quote for all rs in this group ) 169 tubular air heaters including side walls assy, casing. 170 rs group : tubrs group description : tube bending ( to quote for all rs in this group ) 171 tube bends for handrails and pipe reducers / bends upto 42.9 mm dia ( single bend ) 172 tube bends for handrails and pipe reducers / bends above 42.9 mm and upto 76.1 mm dia ( single bend ) 173 tube bends ( multiple bends ) for handrails and pipe reducers / bends upto 42.9 mm dia 174 tube bends ( multiple bends ) for hand rails and pipe reducers / bendsabove 42.9 mm dia and upto 76.1mm dia. 175 rs group :wwsrs group description : water washing system ( to quote for all rs in this group ) 176 waterwashingmanifold for aph [ includingmachiningof saddle coupling ] andesp including nipple machining for espwater washing system 177 rs group : tinyrs group description : light fabrication ( to quote for all rs in this group ) 178 welded type small galleries, beams ( rolled section ) , hollow bracings, rectifier handling system, pent house purlin channel type, hopper approach platform frames with plates, ladder, stair beam, control room inserts, bracings non box type, supporting beams made out of channel / beam, side beam, middle beam, walk way ( rolled structure ) , support, supporting channels, brackets, hopper corner tubes ( from is2062 tubes or plates ) required for esp / aph / fans / gates and dampers and fgd products. 179 vertical stay ( including packing ) . 180 horizontal splitters, gusset plates. 181 hopper ridges without cover plate in x43 182 shock bar ( angle type ) 183 railings, control frames, duct supports, bap trusses ( other than roof trusses in x55 ) truss beams, stairs ( welded type ) , stringers, purlins rod type, star angle, b / b angle, approach platform frames with out plates, supporting beam with truss assembly 184 stool assembly. 185 ladders ( ladder with cage ) , shipping ladder ( stairs made of plates ) 186 shock bar ( angle type ) includingmanufacture of shock bar plate fromraw material issued by bhel. 187 shock beam, angle bar, support in x42, support angle, casing inserts, walkway with cover plate, vertical beam. 188 insulator housing assyembly x06 single with or without ht connection 189 insulator housing assyembly [ 7xx06 ] double with or without ht connection, insulator housing assy [ x17 ] taper, support double. 190 gas distributor assembly, emitting system suspension, inspection door and interlocks, screw ( left and right ) , emitting system frame work, arrangement for emitting electrode, rapping mechanism for collecting electrode, drive arrangement for collecting electrode, rapping mechanism, conveyor assembly, shock bar guide ( rods type ) , adaptor cover, aerofoil, protective tubes, bracket 7x x10, 7x x26, 7x x17 pgmas, tube ( rhs ) ( including packing ) , oil pan 191 support single, connection piece , chimney strakes. 192 plenum duct and transition ducts of gates and dampers ref drg:15720303875, part of pipeings / cooling air hoods where segmental bends made out of plates / tubesref drg:25512400038 193 bracket assy machining, painter trolley. 194 circular type expansion joint ref drg: 3 57 141 16082 or equivalent. 195 small dus weighing above 25 kgs to 50 kgs per piece, of rate schedules 52a to 54d, [ except vertical stays and extra width plate ] . 196 small dus weighing above 50 kgs to 100kgs per piece, of rate schedules 52a to 54d [ except vertical stays and extra width plate ] . 197 small dus weighing upto25 kgs per piece, of rate schedules 52a to 54d [ except vertical stays and extra width plate ] . 198 manufacture of galvanised hand rail post ( all types ) . galvanizing to be done at bhel approved source for which charges are payable extra to galvanizing vendor by bhel ) .intermittent transport charges payble extra as per bhel extra rs ) 199 misc items such as shock bar plate, supports ( 7xx08 ) 200 rs group : extrars group description : extra rate schedules ( to quote for all rs in this group ) 201 conversioncharges for flat out of plates . 202 magnetic particleinspection / testing [ mpi ] . 203 radiography [ rt ] 204 deduction of transport chages for dts 0 to 100 kms 205 deduction of transport chages for dts 101 to 350 kms 206 deduction of transport chages for dts 351 to 450 207 25 mic of epoxyzinc rich primer [ except wm xxx ] 208 40 mic of white enamel paint to is2932 209 25 mic of heat resistant black bituminous paint to is 158 210 transport charges for to and fro movement of semifinished components from your works to the works of contractor situated with in 60 kms from your works doing the intermittent operation such as galvanizing / blast cleaning / balancing / heattreatment / other specific operation etc as per enquiry. 211 transport charges for to and fro movement of semifinished components from your works to the works of contractor situated between 61 kms and 160 kms from your works doing the intermittent operation such as galvanizing / blast cleaning / balancing / heattreatment / other specific operation etc as per enquiry 212 transport charges for to and fro movement of semifinished components from your works to the works of contractor situated between 161 kms and 350 kms from your works doing the intermittent operation such as galvanizing / blast cleaning / balancing / heattreatment / other specific operation etc as per enquiry 213 40 mic of high build chlorinated rubber zincphosphate primer. 214 5 mic of etch primer / wash primer 215 20 mic of synthetic enamel long oil alkyd tois 2932 [ smoke grey and other shades ] 216 25 mic rust preventive oil 217 20 micblack enamel paint to is 2932 218 50 mic high build epoxy paint to is14209 dark grey and other shades 219 40 mic epoxy finish paint light grey and other shades 220 75 mic inorganic zinc silicate primer to is14946 221 30 mic chlorokote zinc phosphate to is 8632. 222 trial assy of total inlet / outlet funnel assy [ pyramidshape ] columns, longitudinal roof beams, trusses ( x55 ) , spiralcasings, turbine hall structures, ducts, silencers ( assembled from multiple blocks ) , bracketsin x25, suction hood of fans and roof assembly of fansetc. 223 recovery rate for cs / as, asbestos , wool , caf scrap etc. 224 big size scrap [ cs / as sheets / plates ] 225 recovery rate for stainless steel [ non magnetic ] , non ferrous metal scrap. 226 hr aluminium paint [ 20 mic ] [ up to 200 degree c ] is 13183 / 1991 grade iii 227 hr aluminium paint [ 20 mic ] [ above 200 degree c ] c ] is 13183 / 1991 grade ii 228 hr chimney black paint [ >250 degree c ] / ferrotol black chimney [ 50 mic ] 229 epoxy hb mio to is14209intercoat [ 125 mic ] 230 aliphatic pu finish to is13213 or eqvt. [ 75 mic ] 231 chlorinated rubber finish paint dark grey [ 40 mic ] 232 ethyl zinc silicate / zinc dust ethyl silicate [ 75 mic ] 233 hb epoxy zinc rich primer [ 50 mic ] 234 chlorinated rubber based titanium oxide pigmentedintermediate paint [ white ] [ 50 mic ] 235 epoxy resin basedtwo pack, titaniumoxidepigmented inter mediate paint [ white ] [ 100 mic ] 236 zinc chrome primer is104 40 microns 237 red oxide zinc phosphate primer80 microns 238 ut of weld, butt joints or fillet welds of column base [ all welds ] thickness 12 to 32mm asper aws d.1.1 239 labour cost for one coat of painting. [ paint bhel supply ] . 240 synthetic enamel to is 2932 grey shade ral 9002 [ 20 microns ] . 241 ultrasonic testing [ ut ] of plates / structurals 242 conversion charges for export packing [ for finished component weight [ du weight ] 243 recovery rate for stainless steel [ magnetic ] scrap 244 conversion charges for structurals to structurals 245 joints of cs / high tensile plates upto4 mm / rm 246 joints of cs / high tensile plates 5mm to 10 mm / rm 247 joints of plates 12 to 20 mm / rm 248 joints of beam / channel upto 200 mm / jt. 249 joints of beam / channel 201mm 300 mm / jt. 250 joints of beam / channel 301 450 mm / jt. 251 joints of angles upto 75x75x8 252 joints of angles above 75x75x8 upto 100x100x12 253 joints of angles above 100x100x12 254 joints in beam / channel above 450 mm 255 additiona joints for plates 21 25 mm / rm 256 additional joints for plates 26 32mm / rm 257 additional joints for plates 33 36 mm / rm 258 additional joints for plates 37 40 mm / rm 259 additional joints for plates 41 50 mm / rm 260 additional joints for plates 51 56 mm / rm 261 additional joints for plates 57 mm and above / rm 262 chlorinated rubber finish paint ( ral ) 40 microns 263 testing charges of gate / damper assembly electrically / pneumatically operated upto 7 mt 264 testing charges of gate / damper assy electrically / pneumatically operated above 7 and upto 10 mt. 265 testing charges of gate asy electrically operated above 10 mt. 266 extra charges payable for fixing of bulb seals ( bulb seals issued as free by bhel ) 267 joints of stainless steel plates upto4 mm / rm 268 joints of stainless steel plates 5 mm to10 mm / rm 269 painting zinc phosphate primer grey shade 40 microns 270 % for full corten a material fabrication all rate schedules in gen, chim a, b and c 271 titanium duct welding 272 epoxy glass flake paint to 125 mic 273 high build chlorinated rubber based intermediate paint 60mic 274 commerical blasting to sa2 275 heat resistance aluminium paint ( gr i ) 400 600°c to is 13183 20mic...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33705574 execution of contract towards extension of supply and other works in vallioor sub division at valliyoor division/tirunelveli edc sl. no. item description 1 normal ground excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles 2 normal ground erection of 7.32m, 7.5m, 8m, 8.23m poles 3 rocky ground (medium) excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles 4 rocky ground erection of 7.32m, 7.5m, 8m, 8.23m poles 5 hard rock requiring blasting and chisseling excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles 6 hard rock requiring blasting and chisseling erection of 7.32m, 7.5m, 8m, 8.23m poles 7 normal ground excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles 8 normal ground erection of 9m & 9.14m poles 9 rocky ground excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles 10 rocky ground erection of 9m & 9.14m poles 11 hard rock requiring blasting and chisseling excavation of pole pit (1.25m * 0.5m*1.5m) for 9m & 9.14m poles 12 hard rock requiring blasting and chisseling erection of 9m & 9.14m poles 13 normal ground excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists 14 normal ground erection ofabove 9.14m poles & 36 length rs joists 15 rocky ground excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists 16 rocky ground erection ofabove 9.14m poles & 36 length rs joists 17 hard rock requiring blasting and chisseling excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14m poles & 36 length rs joists 18 hard rock requiring blasting and chisseling erection of above 9.14m poles & 36 length rs joists 19 normal ground excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists 20 normal ground erection of42 length rs joists 21 rocky ground excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists 22 rocky ground erection of 42 length rs joists 23 hard rock requiring blasting and chisseling excavation of pole pit (1.25m * 0.5m*1.5m) for 42 length rs joists 24 hard rock requiring blasting and chisseling erection of 42 length rs joists 25 transporting of poles from road side to pole pit upto 2km 7.32m, 7.5m, 8m, 8.23m rcc pole 26 transporting of poles from road side to pole pit upto 2km 9m, 9.14m rcc/psc pole 27 transporting of poles from road side to pole pit upto 2km rsj 36 pole 28 transporting of poles from road side to pole pit rsj 42 and above 29 loading and unloading of poles 7.32m, 7.5m, 8m, 8.23m rcc pole 30 loading and unloading of poles 9m, 9.14m rcc/psc pole 31 loading and unloading of poles rs joists, tubular & rail pole (above 9.14m) 32 concreting of poles as per board standards (2*2*5). the materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing transporting of sant,jally,from box and water curing for 14 days etc,.complete) 33 coping of pole (0.6m*0.6m*0.35m) 34 concreting of stay (o.3m * 0.3m * 1.5m) including materials 35 coil earthing per pole & pole earthing 36 normal ground excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set) 37 normal ground erection of stay set 38 rocky ground (medium) excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set) 39 rocky ground erection of stay set 40 hard rock requires blasting & chisseling excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set) 41 hard rock requires blasting & chisseling erection of stay set 42 loadingand unloading charges of oil drums (with oil) 43 loadingand unloading charges of oil drums (withoutoil) 44 loadingand unloading charges of conductor drum, cable drum 45 loadingand unloading charges of line materials 46 loadingand unloading charges of metering set 47 11kv lines (pin point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to site 48 11kv lines (cut point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to site 49 11kv lines (pin point) fixing of v & channel cross arm 4.5 including transporting of materials from road side to site 50 11kv lines (cut point) fixing of v & channel cross arm 4.5 including transporting of materials from road side to site 51 11kv lines (pin point) fixing of v & channel cross arm 3.5 including transporting of materials from road side to site 52 11kv lines (cut point) fixing of v & channel cross arm 3.5 including transporting of materials from road side to site 53 11kv lines fixing of lt 3phase cross arm including transporting of materials from road side to site 54 11kv lines fixing of lt 1phase cross arm including transporting of materials from road side to site 55 11kv lines fixing of ht lt ti fitting including transporting of materials from road side to site 56 11kv lines erection of ht side arm with stud including transporting of materials from road side to site 57 11kv lines erection of lt side arm with stud including transporting of materials from road side to site 58 11kv lines fixing of insulator (per location) including transporting of materials from road side to site 59 11kv lines fixing of 11kv disc including transporting of materials from road side to site 60 11kv lines fixing of tapping channel cross arm including transporting of materials from road side to site 61 ht lines (33kv) stringing, sagging, binding including transporting of materials from road side to site for dog conductor (1span/wire) 62 ht lines (33kv) stringing, sagging, binding including transporting of materials from road side to site for 7/4.09 acsr conductor (1span/wire) 63 ht lines (33kv) line clear works for dog conductor (1span/wire) 64 ht lines (33kv) line clear works for 7/4.09 acsr conductor (1span/wire) 65 11kv lines stringing, sagging, binding including transporting of materials from road side to site for 7/2.59 acsr (1span/wire) 66 11kv lines stringing, sagging, binding including transporting of materials from road side to site for 7/3.35 acsr (1span/wire) 67 ht lines stringing, sagging, binding including transporting of materials from road side to site for 7/4.09 acsr (1span/wire) 68 11kv lines line clear works for for 7/2.59 acsr (1span/wire) 69 11kv lines line clear works for for 7/3.35 acsr (1span/wire) 70 11kv lines line clear works for for 7/4.09 acsr (1span/wire) 71 lt lines stringing, sagging, binding including transporting of materials from road side to site for 7/2.59 acsr, 7/2.50aaac 72 lt lines stringing, sagging, binding including transporting of materials from road side to site for 7/3.35 acsr, 7/3.15 aaac 73 for lt line clear works for for7/2.59 acsr, 7/2.50aaac (1span/wire) 74 for lt line clear works for for 7/3.35 acsr, 7/3.15 aaac (1span/wire) 75 guarding per span length spilt neutral guarding 76 guarding per span length flat guarding (2 wires) 77 guarding per span length flat guarding (4 wires) 78 guarding per span length flat guarding (6 wires) 79 guarding per span length cradle guarding (fixing of x arm lacing ) 80 guarding per span length fixing of one earthing device with stud 81 erection of transformer/dismantling upto 200kva 82 erection of transformer/dismantling upto 250kva 83 erection of transformer/dismantling upto 500kva 84 erection of centre support (including concrete) 85 erection of metering set 86 erection of feeder cable with open type fuse unit per feeder 87 erection of feeder cable with open type fuse unit for each addl feeder 88 erection of feeder cable bus bar arrangement with open type 89 loading & unloading of distribution transformer below 250kva 90 loading & unloading of distribution transformer 250kva 91 loading & unloading of distribution transformer 500kva 92 plinth work for 500kva dt with construction material 93 fabrication ,erection and excavation for centre support etc for 250 /500 dt including transporting 94 tube light erection 1*40w tube light complete set (including transport) 95 tube light erection for sv lamp and mercury lamp complete set (including transport) 96 tube light erection for cfl lamp complete set (including transport) 97 painting of sc number including painting 98 tube light 72w led erection 99 manufacturing of clamps 50*8 mm 100 manufacturing of clamps 65*10 mm 101 alteration of clamps 102 street light switching point arrangement 103 drilling / less than 23mm holes per hole /slotted holes 104 cutting of channel 105 cutting of flat 106 cutting of angle 107 rsj pole cutting 108 tubular pole cutting 109 rail pole cutting 110 fabrication of lightning arrestor frame 111 lt changing of pin point to cut point 112 ht changing of pin point to cut point 113 erection of service connection materials 1ph service 114 erection of service connection materials 3ph service 115 dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., 116 dismantling of poles without concrete in damaged condition including grill separation etc., 117 providing jumpering at cut point 118 complete replacement of worn out earth wire per structure 119 labour for manufacturing of open type fuse unit (materials supplied by board) 120 manufacturing of hg fuse stool incl. materials 121 tree clearence in ht or lt location for ordy. tree clearence and throng bushes & trees 122 tree clearence in ht or lt location for coconut trees 123 tree clearence in ht or lt location for palmrah trees 124 painting double pole transformer structure materials (double coat) (including cost of paint) 125 painting pole (colour washing with distember) 2 nos (including cost of paint) 126 painting for transformer only (double coat with paint) 127 numbering of poles with backround colour paint 128 numbering of distribution transformer (painting and writing of name board size 1 1/4*1 incl cost of paint & board and ms sheet 129 writing in seating channel (paint to be supplied by contractor) 130 painting of rcc strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor 131 painting of rsj structure poles & metal parts aluminium paint to be supplied by contrcator 132 set right of leaning ht pole/lt pole including x arms, ti fittings 133 transformer structure erection excavation of structure pole pits ( 2nos) 134 transformer structure erection erection of structure poles ( 2nos) 135 transformer structure erection excavation of stay pits(4nos) 136 transformer structure erection erection of stay set (4nos) 137 transformer structure erection concreting of structure poles incl.materials mass concrete with coping (2 poles) 138 transformer structure erection concreting of stays (4nos) incl.materials 139 erection of structure materials top channel 140 erection of structure materials transformer seating channel and belting angle 141 erection of structure materials ab switch (complete) 142 erection of structure materials hg fuse (complete) 143 erection of structure materials jumpering 144 erection of structure materials ht las 145 erection of structure materials lt las 146 erection of structure materials transformer lt cable wiring / lt bus bar 147 erection of structure material erection of lt open type fuse unit including cablejumbering up to the line including cutting welding bending ,fabrication etc 148 earthing system excavation of 4 nos. earth pits 149 earthing system excavation of earth wire trenches and paving of earth wire, erection of 4 nos. earth pipe and giving earth connection, earthing of all metal parts, las etc., including central connection 150 earthing system mason works with bricksforearth pits4 nos (cementsupplied by contractor) 151 earthing system painting of transformer structure 2 coats incl.paint 152 earthing system painting with distember paint on poles with paint cost 153 earthing system spreading yard jelly and cut stone and bricks including material 154 earthing system writing of name board and target board 155 earthing system transporting of structure materials abs,hg fuse,cable etc except pole 156 earthing system fixing of danger board ( labour only) 157 erection of tapping structure excavation of structure pole pit. (2nos) 158 erection of tapping structure erection of structure pole. (2nos) 159 erection of tapping structure excavation of stay pit (2nos) 160 erection of tapping structure erection of stay set (2nos) 161 erection of tapping structure concreting of structure poles including materials mass concrete with copping (2nos) 162 erection of tapping structure concreting of stay (2nos) 163 erection of structure materials top channel 164 erection of structure materials ab switch (complete) 165 erection of structure materials assemble, operating pipe fixing etc., fixing of cross bracing 166 earthing system excavation of 1 no. earth pits excavation of earth wire trench and paving of earth wire, erection of 1 no. earth pipe and giving earth connection, earthing of all metal parts, for tapping structure. 167 earthing system mason works with bricks for earth pit (including material) 168 colour coating on poles with iron materials including paint and distember 169 transporting of 42 twin rsj pole from roadside pole pit 170 fabrication of 42 twin rsj pole, materials supplied by board. 171 excavation & erection of twin 422 fabricated rsj pole 172 concreting of 42 twin rsj pole 173 concreting of 42 twin rsj pole 174 resagging of various conductor (please mention in percentage of respectie conductor) 175 dismantling of 7.5m /8m pole with out damage 176 dismantling of 9.14m pole/ rsj with out damage 177 dismantling of stay set complete 178 replacement of detoriated stay rod 179 replacement of rsj/tubular poles below 30 feet 180 replacement of rsj/tubular poles aove 30 feet 181 dismantling of detoriated cables of various size(95,120,185 sq.mm) from dt,lt bushing to lt open type clamp anderection of suitable lug at both ends 182 replacement of new 10 earthpipe replacing the corroded earth pipe and renewal of earthing including burying , looping and binding 183 mass concrete for poles on the line ( all materials including cementratio 1:2:4) ( 1 loc ( 0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 cum) 184 sleeveconcrete for poles on the line ( all materials including cementratio 1:2:4) ( 1 loc ( 0.202 ) (0.5*0.45*0.9m) 185 providing of spacers in lt lines 186 hiring of jcb 187 hiring of crane 188 exceeding 1 hour for every hour 189 transporting of charges of dt / line materials using private vehicle upto 20 km( up and down) 190 beyond 20 km for every km 191 single pole structure erection excavation of structure pole pit 3’ x 6’ by using jcb or manual 192 single pole structure erection transportation of pole from road side to pole pit by using jcb or manual 193 single pole structure erection erection of poles by using jcb or manual 194 single pole structure erection excavation of stay pit by jcb or manual (2nos) 195 single pole structure erection erection of stay set complete (2nos) 196 single pole structure erection mass concreting for structure 197 singple pole structure erection stay concrete (2nos) 198 single pole structure erection erection of structure materials tapping channel 199 single pole structure erection erection of structure materials transformer bed stucture 200 single pole structure erection erection of ab switch 201 single pole structure erection erection of h.g. fuse (3nos) 202 structure earthing complete with 3 pits and earth loops 203 singple pole structure erection fixing of mcd box 204 singple pole structure erection ht las fixing (3nos) 205 singple pole structure erection lt las fixing (3nos) 206 singple pole structure erection ht jumpering complete 207 singple pole structure erection painting of all clamps and other iron materials and painting of structure pole 208 singple pole structure erection ltcable arrangement 209 singple pole structure erection fixing of danger board 210 dismantling of other line materials (please mention in percentage for respective line material errection works) ...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33693101 erection and dismantling of networks ( oh line and cable ) including maintenance works of lines and sub stations injj nagarsub division of ambattur division of cedc / west 1 erection of distribution transformer structure 2 excavation of structure pole pit 2x3x1/6 th of height 3 erection of 9.14 m rcc/9.0 mtr psc /rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. (excluding loading and unloading) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road (earth) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe (1 drum: 200 m) 35 3x120 sq mm xlpe (1 drum: 200 m) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 empty drums) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m) 45 120 sq. mm ( 1 drum 500 m) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road (earth) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials,elec. works, transportion, lead, lift etc., 58 4/6/8 way & mini pillar boxes for 2 feet i e 0.6m 59 4/6/8 way& mini pillar boxes for 3 feet i e 0.9m(rate for hb/con) 60 4/6/8 way & mini pillar boxes for 4 feet i e 1.2 m(rate for hb/con) 61 4/6/8 way & mini pillar boxes for 5 feet i e 1.5 m(rate for hb/con) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4/6/8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc/rsj/psc pole and other poles including excavation of pole pit (pit size 2x3x1/6th of the length of poles) 73 excavation ofpole pit for 7.5/8 meters 74 erection of pole pit for7.5/8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1/2size 79 erection of v cross arm41/2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay (excluding pole erection and earth excavation) 95 concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and m sand including coping (m sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) 96 7.5 meters/8 meters pole 97 9.14 meters pole (with coping of 1 dia upto height of 1.1/2 above ground level) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht/lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7/2.59 mm acsr/7/2.50 aaac 101 upto 7/3.35 mm acsr/7/3.15 aaac 102 raccoon 7/4.09 per 103 dog conductor 7/4.72 104 numbering of location/each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding(split neutral grounding) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet/4 feet (all materials supplied by the board) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer /line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a).loading of poles 129 7.5/8 meters pole /each 130 9.14 meters pole rcc /9.0 mtr psc/9.14 rsj /each 131 b).un loading of poles 132 7.5/8 meters pole (rcc/psc)/each 133 9.14 meters pole rcc /9.0 mtr psc/9.14 rsj /each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity (pole mounted structure) 142 dp/tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box /6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only.(checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating). 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only.(checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating). 164 33 kv ab switch at ss/ structure 165 tree cutting (tree clearance) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle/bushes/velikathan clearence 169 straitening ofleanedht/lt poles 170 pin point location 171 cut point location 172 resagging of ht/lt lines for all conductor sizes 173 re sagging (ht) 7/4.72 mm 174 re sagging (ht/lt) 7/4.09 mm 175 re sagging (ht/lt) 7/3.35 mm and 7/3.15 sqmm 176 re sagging (ht/lt) 7/2.59 mm and 7/2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles/rsj/tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7/2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7/3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation/office premises per sq.mtr(jungle clearance) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum (to&fro) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33/ 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv /11 kvlas 199 cleaning of 33/11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33/11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33/11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt (16 ,25 & 40 kva) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt ,fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch ...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33693080 erection and dismantling of networks ( oh line and cable ) including maintenance works of lines and sub stations inthiruverkadusub division of ambattur division of cedc / west erection of distribution transformer structure 2 excavation of structure pole pit 2x3x1/6 th of height 3 erection of 9.14 m rcc/9.0 mtr psc /rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m and erection of stayset complete 8 sleeve concrete for stay set including all materials 9 erection of hg fuse set with transport 10 erection of 11 kv ab switch complete setwith transport 11 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt 12 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 13 for triple pole and four pole structure 14 erection of l.t.open type fuse unit including cable jumpering upto the line. 15 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 16 erection of h.t. jumpering in dp structure complete 17 erection of h.t. las 18 erection of l.t. las 19 erection of dt excluing loading and unloading 20 upto 100 kva 21 above 100 kva 22 painting of two coats of aluminium paints for dp structure and iron materials including cost of paint and distemper etc. 23 loading and unloading of distribution transformer at site and store. 24 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. (excluding loading and unloading) 25 upto 100 kva 26 above 100 kva 27 crane hire charges 28 laying of ht cable 29 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., 30 normal road (earth) 31 tar road 32 concrete road 33 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites. 34 3x300 sq mm xlpe (1 drum: 200 m) 35 3x120 sq mm xlpe (1 drum: 200 m) 36 laying of ht cable 37 laying of 300 sq mm xlpe cable 38 laying of 120 sq mm xlpe cable 39 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 40 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 empty drums) 42 laying of lt cable 43 tansport of lt cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites. 44 240 sq.mm ( 1 drum 200 m) 45 120 sq. mm ( 1 drum 500 m) 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. 47 normal road (earth) 48 tar road 49 concrete road 50 laying of lt cable 51 laying of 240 sq.mm cable 52 laying of 120 sq.mm cable 53 laying of 25 sq.mm cable 54 laying of 16 sq.mm cable 55 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 56 erection of pillar box 57 erection of pillar box including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials,elec. works, transportion, lead, lift etc., 58 4/6/8 way & mini pillar boxes for 2 feet i e 0.6m 59 4/6/8 way& mini pillar boxes for 3 feet i e 0.9m(rate for hb/con) 60 4/6/8 way & mini pillar boxes for 4 feet i e 1.2 m(rate for hb/con) 61 4/6/8 way & mini pillar boxes for 5 feet i e 1.5 m(rate for hb/con) 62 cleaning & painting with aluminium paint 2 coats & numbering with fdr details 63 8 way pillar box 64 6 way pillar box 65 4 way pillar box 66 mini way pillar box 67 dismantling of pillar box 68 dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 69 4/6/8 way pillar box 70 mini pillar box 71 miscellaneous oherection work 72 erection of rcc/rsj/psc pole and other poles including excavation of pole pit (pit size 2x3x1/6th of the length of poles) 73 excavation ofpole pit for 7.5/8 meters 74 erection of pole pit for7.5/8 meters 75 excavaion of polepit for 9.14 meters 76 erection of polepit for 9.14 meters 77 base concerting 30 cm thick for one pole including of all materials 78 erection of v cross arm 3 1/2size 79 erection of v cross arm41/2 size 80 erection of tapping channel 5 size 81 erection of stay set complete 82 fixing of 11 kv ti fitting 83 fixing of 33 kv ti fitting 84 fixing of lt 3 phase cross arm 85 fixing of lt ti fitting 86 fixing of single phase cross arm 87 lt pin insulator with pin 88 lt shackle with strap sets 89 11 kv pin insulator with gi pin 90 33 kv pin insulator with gi pin 91 11 kv strain disc with metal parts 92 33 kv strain disc with metal parts 93 fixing of aluminium knob 94 providing of fly stay (excluding pole erection and earth excavation) 95 concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and m sand including coping (m sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) 96 7.5 meters/8 meters pole 97 9.14 meters pole (with coping of 1 dia upto height of 1.1/2 above ground level) 98 earthing of poles 99 paving out conductor, stringing and sagging of line of all sizes of acsr / aaac conductors of ht/lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 100 upto 7/2.59 mm acsr/7/2.50 aaac 101 upto 7/3.35 mm acsr/7/3.15 aaac 102 raccoon 7/4.09 per 103 dog conductor 7/4.72 104 numbering of location/each including cost of paint and labour 105 providing of guarding per span excluding of stay set erection 106 2 wire flat guarding(split neutral grounding) 107 4 wire flat guarding 108 craddle guarding including earthing and earth pit excavation 109 erection of street ligh fittings 2 feet/4 feet (all materials supplied by the board) labour alone. 110 erection of cross bracing set 111 dp structure 112 tp structure 113 erection oftop channels 114 10 centre 115 15 centre 116 erection of33 kv centre rotating ab switch complete set 117 erection of11 kv centre rotating ab switch complete set 118 erection ofspacers , line seperators & jumpers 119 single phase spacer /line seperators 120 three phase spacer / line seperators 121 provision of paa jumper per phase for lt 122 provision of paa jumper per phase for ht 123 metering set loading & unloading 124 loading 125 un loading 126 erection ofmetering sets 127 up to 11 metering set 128 a).loading of poles 129 7.5/8 meters pole /each 130 9.14 meters pole rcc /9.0 mtr psc/9.14 rsj /each 131 b).un loading of poles 132 7.5/8 meters pole (rcc/psc)/each 133 9.14 meters pole rcc /9.0 mtr psc/9.14 rsj /each 134 loading of conductor drum 135 conductor drum of all sizes with conductor 136 conductor drum of all sizes without conductor 137 un loading of conductor drum 138 conductor drum of all sizes with conductor 139 conductor drum of all sizes without conductor 140 maintenance work 141 maintenance of dt structure for various capacity (pole mounted structure) 142 dp/tp structure maintenance 143 dt maintenance 144 replacement of ht bushing rod 145 replacement of lt bushing rod 146 replacement of gasket 147 structure earthi re wiring . 148 replacement of structure earthing in complete without material 149 dt structure yard cleaning 150 numbering of location including cost of paint and labour 151 maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing. 152 8 way pillar box /6 way pillar box 153 4 way pillar box 154 mini pillar box 155 fixingofmissing doors in pillars including materials 156 ms mini pillar door 157 ms 4 waypillar door 158 ms 6 way / 8 waypillar door 159 frp 4 way pillar door 160 maintenance of 11 kv abs only.(checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating). 161 11 kv ab switch at structure in work site 162 11 kv ab switch at ss 163 maintenance of 33 kv abs only.(checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating). 164 33 kv ab switch at ss/ structure 165 tree cutting (tree clearance) 166 cutting of big tree fouling on the line. 167 clearing of heavy bushes 168 jungle/bushes/velikathan clearence 169 straitening ofleanedht/lt poles 170 pin point location 171 cut point location 172 resagging of ht/lt lines for all conductor sizes 173 re sagging (ht) 7/4.72 mm 174 re sagging (ht/lt) 7/4.09 mm 175 re sagging (ht/lt) 7/3.35 mm and 7/3.15 sqmm 176 re sagging (ht/lt) 7/2.59 mm and 7/2.50 sqmm 177 dismantling works 178 dismantling of 9.14 mtr. poles/rsj/tubular poles 179 dismantling of8mtr / 7.5 mtr poles / 180 dismantling of stay set complete 181 dismantling of conductors upto 7/2.59 mm including coiling and transporting from workspot to road side 182 dismantling of conductors 7/3.35 mm and above including coiling and transporting from workspot to road side 183 dismantling of damaged 6 way / 4 waypillar box 184 dismatling of transformer structure materials 185 dismatling ofab switch with hg fuse set 186 releasingof v x arm 187 stacking of materials / scarp 188 substation maintenance 189 removing weed in substation/office premises per sq.mtr(jungle clearance) 190 hot oil circulation for replacement of tr.oil in pr.tr. with filter machine & loading. 191 transporting offilter machine unit& oil drum (to&fro) 192 cleaning of110 kv breakersincluding cts and allied maintenance work 193 cleaning of 110 kvlas 194 cleaning of 110 kvab switch and applying petroleum jelly 195 cleaning of 110 kv power transformer insulators and other maintenance work 196 cleaning of 110 kv bus insulators 197 cleaning of33/ 11 kv breakersincluding cts and allied maintenance work 198 cleaning of 33 kv /11 kvlas 199 cleaning of 33/11 kvab switch including tightening of bolt & nutt and applying petroleum jelly 200 cleaning of 33/11 kv kv power transformer insulators and other maintenance work 201 cleaning of 33/11 kvbus insulators 202 aluminium painting in substation 203 33kvstructure 204 11kv structure 205 power transformer 206 breaker 207 erection ofsingle poledtstructure 208 loading andunloading of rcc 9 / 9.14 mtrsquare pole 209 excavation ofpole pit for 3 x 3 x 6size 210 erection of rcc 9 / 9.14 mtrsquare pole including base plate erection. 211 loading , unloading and erection ofhvdsdt (16 ,25 & 40 kva) 212 excavation of stay pit for 2 x 2 x 6 size 213 erection of stay set complete including base plate 214 single poletransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt ,fixing of earth connections with gi wire , bolt and nuts. 215 erection oftransformerstructure materials 216 erection of hg fuse set 217 erection of 11 kv ab switch complete set 218 provision of mass concreting of pole with cement , sand and jelly 219 erection of h.t. las 220 erection of l.t. las 221 erection of h.t. jumpering in dt structure complete 222 erection of l.t.open type fuse unit including cable jumpering complete set. 223 erection of ab switch alone for dp switch ...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33660721 supply of aluminum paintsupply of brushing type good quality aluminum paint in non returnable container of 4 litre capacity paste and medium packed separately. the ingredient solving provided in such preparation that when mixed. the material shall be containing not less than the equivalent of 50% by weight of aluminum powder. the remainder being medium and ready mixed material shall contain not more than 50% volatile matter conform iss 2337 / 63 and is 259 latest issue....

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33592887 labour charges for carrying out extension / improvement / oh fault rectification & other maintenance works in gummidipoondi sub division of ponneri division in chennai north circle 1 labour charges for erection of double pole structure with distribution transformer. 2 excavation of structure pole pit 2 x 3 x 1 / 6 th of height of pole 3 erection of 9.14 m rcc / 9.0 mtr psc / rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 mtr for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m 8 erection of stay set complete 9 sleeve concrete for stay set including all materials & cement 10 erection of hg fuse set with transport 11 erection of 11 kv ab switch complete set with transport 12 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough 13 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 14 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for tp structure 15 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for four pole structure 16 erection of l.t.open type fuse unit including cable jumpering upto the line. 17 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 18 erection of h.t. jumpering in dp structure complete ( 150 * 3 ) 19 erection of h.t. las ( 3 nos ) 20 erection of l.t. las ( 4 nos ) 21 erection of dt excluing loading and unloading using crane 63kva / 100kva 22 erection of dt excluing loading and unloading using crane above 100 kva 23 painting of two coats of aluminium paint for dp structure and iron materials including cost of paint and distemper etc. without material 24 painting of two coats of aluminium paint for dp structure and iron materials including cost of paint and distemper etc. with material 25 painting of structure pole with distemper including cost of material 26 loading and unloading of distribution transformer at site and store. ( all rating ) 27 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) upto 100 kva 28 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. ( excluding loading and unloading ) above 100 kva 29 labour charges for laying of ht cable 30 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., normal road 31 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., tar road 32 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., concrete road 33 loading and unloading of ht cable including coiling and recoiling 34 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle upto 5 km 35 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle above 5 km 36 laying of 11kv 3 x 300 sq mm xlpe cable 37 laying of 11kv 3 x 120 sq mm xlpe cable 38 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 39 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 40 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 drums ) upto 5 km 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores ( minimum 2 drums ) above 5 km 42 labour charges for laying of lt cable 43 loading and unloading of lt cable including coiling and recoiling 44 transporting of 11 kv lt cable from departmental stores to work spot by engaging private vehicle upto 5 km 45 transporting of 11 kv lt cable from departmental stores to work spot by engaging private vehicle above 5 km 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. normal road 47 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. tar road 48 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. concrete road 49 laying of lt 4 x 240 sq.mm cable 50 laying of lt 4 x 120 sq.mm cable 51 laying of lt 4 x 25 sq.mm cable 52 laying of lt 2 x 16 sq.mm cable 53 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 54 labour charges for erection of pillar box 55 erection of 4 / 6 way pillar box 3 feet height using concrete only including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, el. works, transportation, lead, lift etc., 56 erection of mini pillar box 3 feet height using concrete only including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials, el. works, transportation, lead, lift etc., 57 cleaning&painting with aluminium paint 2 coats & numbering with fdr details with materials 8 way pillar box 58 cleaning&painting with aluminium paint 2 coats & numbering with fdr details without materials 8 way pillar box 59 cleaning&painting with aluminium paint 2 coats & numbering with fdr details with materials 6 way pillar box 60 cleaning&painting with aluminium paint 2 coats & numbering with fdr details without materials 6 way pillar box 61 cleaning&painting with aluminium paint 2 coats & numbering with fdr details with materials 4 way pillar box 62 cleaning&painting with aluminium paint 2 coats & numbering with fdr details without materials 4 way pillar box 63 cleaning&painting with aluminium paint 2 coats & numbering with fdr details with materials mini pillar box 64 cleaning&painting with aluminium paint 2 coats & numbering with fdr details without materials mini pillar box 65 labour charges for dismantling of pillar box 66 dismantling of old 4 / 6 / 8 way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 67 dismantling of old mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 68 labour charges for miscellaneous work 69 excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) for 7.5mtrs / 8 mtrs pole 70 erection of 7.5m / 8m rcc / rsj / psc pole and other poles 71 excavation of pole pit ( pit size 2x3x1 / 6th of the length of poles ) for 9.14m pole 72 erection of 9.14m rcc / rsj / psc pole and other poles 73 trasportation of pole of all sizes from road side to work spot 74 trasportation of pole of all sizes from stores to road side upto 2km 75 trasportation of pole of all sizes from stores to road side upto above 2 km 76 base concerting 30 cm thick for one pole including of all materials 77 transporting of dts / metering sets / line materials through private vehicle from store to work spot / vice versa upto 10 km 78 transporting of dts / metering sets / line materials through private vehicle from store to work spot / vice versa above 10 km 79 erection of v cross arm 3 1 / 2size 80 erection of v cross arm41 / 2 size 81 erection of tapping channel 5 size / v cross arm 5 size 82 excavation of stay pit 83 erection of stay set complete 84 fixing of 11 kv ti fitting 85 fixing of 33 kv ti fitting 86 fixing of lt 3 phase cross arm 87 fixing of lt ti fitting 88 fixing of single phase cross arm 89 lt pin insulator with pin 90 lt shackle with strap sets 91 11 kv pin insulator with gi pin 92 33 kv pin insulator with gi pin 93 11 kv strain disc with metal parts 94 33 kv strain disc with metal parts 95 fixing of aluminium knob 96 fixing of caution / danger board 97 providing of fly stay ( excluding pole erection and earth excavation ) 98 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 7.5m / 8m pole 99 concreting of poles with 1:3:6 mix, 1.1 / 2 broken metal jelly and m sand including coping ( m sand, jelly and cement, will be supplied by the contractor ) ( size 2x3x1 / 6th of pole height ) 9.14 metres pole ( with coping of 1 dia upto height of 1.1 / 2 above ground level ) pole 100 earthing of poles 101 paving out conductor, stringing and sagging of line of 7 / 2.59mm acsr / 7 / 2.50 mm aaac conductors of lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 102 paving out conductor, stringing and sagging of line of 7 / 3.35mm acsr / 7 / 3.15 mm aaac conductors of lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 103 paving out conductor, stringing and sagging of line of 7 / 4.09mm acsr racoon conductors of ht lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 104 paving out conductor, stringing and sagging of line of 7 / 4.72mm dog conductors of ht lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 105 numbering of location / each including cost of paint and labour 106 providing of 2 wire flat guarding ( split neutral grounding ) per span excluding of stay set erection 107 providing of 4 wire flat guarding per span excluding of stay set erection 108 providing of craddle guarding including earthing and earth pit excavation per span excluding of stay set erection 109 erection of street light fittings 2 feet / 4 feet ( all materials supplied by the board ) labour alone. 110 erection of cross bracing set 10 / 15 structure dp structure 111 erection of cross bracing set 10 / 15 structure tp structure 112 erection oftop channels 10 / 15 structure dp structure 113 erection oftop channels 10 / 15 structure tp structure 114 erection of33 kv centre rotating ab switch complete set 115 erection of11 kv centre rotating ab switch complete set 116 erection of single phase spacer 117 erection of three phase spacer 118 provision of jumper per phase for lt 119 provision of jumper per phase for ht 120 provision of pa jumpers 121 loading of metering set 122 un loading of metering set 123 erection of metering sets up to 11kv metering set 124 erection of metering sets above 11kv metering set 125 loading of 7.5 / 8 metres pole ( rcc / psc ) / each 126 loading of9.14 metres pole rcc / 9.0 mtr psc / 9.14 rsj / each 127 unloading of 7.5 / 8 metres pole ( rcc / psc ) / each 128 unloading of 9.14 metres pole rcc / 9.0 mtr psc / 9.14 rsj / each 129 loading of conductor drum of all sizes with conductor 130 loading of conductor drum of all sizes without conductor 131 unloading of conductor drum of all sizes with conductor 132 unloading of conductor drum of all sizes without conductor 133 manufacturing of ms clamps at works spot as per requirement , including alteration by using 50 x 8 mm flat ( with material ) 134 manufacturing of ms clamps at works spot as per requirement , including alteration by using 65 x 10 mm flat ( with material ) 135 cutting of channel / flat / angle 136 cutting of rsj pole 137 cutting of tubular pole 138 cutting of rail pole 139 drilling of 5 / 8, 3 / 8, 1 / holes in channels / angles slot holes 140 drilling of 5 / 8, 3 / 8, 1 / holes in channels / angles round holes 141 fixing of missing doors in ms mini pillar box 142 fixing of missing doors in ms 4 waypillar box 143 fixing of missing doors in ms 6 waypillar box 144 fixing of missing doors in ms 8 waypillar box 145 fixing of missing doors in frppillar box 146 provision of 2 nos hinges in all types of pillar box 147 labour charges for maintenance work 148 dp / tp structure maintenance pole mounted 149 dt maintenance for various capacity 150 structure earthing wire redoing various capacity 151 replacement of structure earthing in complete without material various capacity 152 dt structure yard cleaning various capacity 153 watering to earth pits 154 numbering of location including cost of paint and labour 155 maintenance of 8 way pillar box such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 156 maintenance of 6 way pillar box such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 157 maintenance of 4 way pillar box such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 158 maintenance of mini pillar box such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 159 numbering of pillar with feeder details including cost of paint and labour 160 maintenance of 11 kv abs only at structure. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 161 maintenance of 11 kv abs only at ss. ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 162 maintenance of 33 kv abs at structure ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 163 maintenance of 33 kv abs at ss ( checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating ) . 164 cutting of big tree fouling on the line. 165 cutting of tree branches fouling on the line. 166 clearing of heavy bushes 167 jungle / bushes / velikathan clearence 168 set righting leanedht / lt poles at pin point location 169 set righting leanedht / lt poles at cut point location 170 re sagging of ht line 7 / 4.72 mm 171 re sagging ( ht / lt ) line 7 / 4.09 mm 172 re sagging ( ht / lt ) line7 / 3.35 mm 173 re sagging ( ht / lt ) line 7 / 2.59 mm 174 dc of single phase service 175 dc of three phase service 176 rc of single phase service 177 rc of three phase service 178 labour charges for dismantling work 179 dismantling of 7.5m / 8.0m poles 180 dismantling of 9.14 mtr. poles / rsj / tubular poles 181 dismantling of stay set complete 182 dismantling of conductors including coiling and transporting from workspot to road side upto 7 / 3.35mm conductor without transport 183 dismantling of conductors including coiling and transporting from workspot to road side above 7 / 3.35mm conductor without transport 184 releasing of lt s ph x arm / ti fitting 185 releaasing of lt 3 ph x arm 186 releasing of 3 6 v cross arm / tapping channal / guardingx arm 187 releasing of 4 6 andv cross arm 188 releasing of5v cross arm 189 releasing of distn.tr. only at field 190 dismantling of transformer structure materials up to 100 kva 191 dismantling of transformer structure materials above 100 kva 192 dismantling of 11kv ab switch at structure 193 dismantling of 33kv ab switch at structure 194 dismantling of h.g. fuse set 195 dismantling of ht las at dt structure 196 dismantling of lt las at dt structure 197 dismantling of earth pipe and structure earthing complete 198 dismantling of 2 sets open type fuse unit with all wiring complete ( including bus bar arrangement ) 199 dismantling of cross bracing set 200 dismantling of top channel 201 dismantling of guarding including dismantling of cross arm per span 202 dismantling of single ph service wire & re effecting service including meter 203 dismantling of three ph service wire & re effecting service including meter 204 breaking of rcc damaged poles after dismantling, releasing the grill including transporting to road side 205 stacking materials / scrap 206 labour charges for erection of single pole structure 207 loading and unloading of 9.0m square pole 208 excavation of pole pit 209 erection of 9.0m square pole 210 transporting of square pole from road side to pole pit 211 excavation of stay pit 0.95x0.60x1.5m 212 erection of stay set complete 213 fixing of single pole structure material in complete shape 214 erection of 16 / 25 / 40 kva distribution transformer 215 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough 216 structure pole mass concreting and coping 0.6x0.6x1.65 mtr for dp structure including cost of materials and cement. 217 sleeve concrete for stay set including all materials 218 erection of ht las ( 3 nos ) 219 erection of lt las ( 4 nos ) 220 erection of lt wiring kit ( double open type circuit ) 221 painting of single pole structure including iron materials double coat with materials 222 painting of single pole structure including iron materials double coatwithout materials 223 painting of structure pole with distemper including cost of material 224 gst...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33592875 labour charges for carrying out extension / improvement / oh fault rectification & other maintenance works in panchetty sub division of ponneri division in chennai north circle 1 labour charges for erection of double pole structure with distribution transformer. 2 excavation of structure pole pit 2 x 3 x 1/6 th of height of pole 3 erection of 9.14 m rcc/9.0 mtr psc /rsj pole 4 transporting of 9.14 m poles from road side to pole pit 5 structure pole mass concreting and coping 0.6x0.6x1.65 mtr for dp structure including cost of materials and cement. 6 erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.dpdc channel, t.i. fitting etc., in complete. 7 excavation of stay pit 0.95x0.60x1.5m 8 erection of stay set complete 9 sleeve concrete for stay set including all materials & cement 10 erection of hg fuse set with transport 11 erection of 11 kv ab switch complete set with transport 12 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough 13 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for dp structure 14 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for tp structure 15 erection of aluminium bus bar pipe complete for h.t.bus bar arrangements for four pole structure 16 erection of l.t.open type fuse unit including cable jumpering upto the line. 17 providing lt bus bar arrangementsin dt structure including fixing of cross arm and insulator. 18 erection of h.t. jumpering in dp structure complete (150 * 3) 19 erection of h.t. las(3 nos) 20 erection of l.t. las(4 nos) 21 erection of dt excluing loading and unloading using crane 63kva/100kva 22 erection of dt excluing loading and unloading using crane above 100 kva 23 painting of two coats of aluminium paint for dp structure and iron materials including cost of paint and distemper etc. without material 24 painting of two coats of aluminium paint for dp structure and iron materials including cost of paint and distemper etc. with material 25 painting of structure pole with distemper including cost of material 26 loading and unloading of distribution transformer at site and store. (all rating) 27 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. (excluding loading and unloading) upto 100 kva 28 dismantling of failed dt from the structure including removing ht & lt connection and all other incidental works. (excluding loading and unloading) above 100 kva 29 labour charges for laying of ht cable 30 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., normal road 31 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., tar road 32 excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., concrete road 33 loading and unloading of ht cable including coiling and recoiling 34 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle upto 5 km 35 transporting of 11 kv ht cable from departmental stores to work spot by engaging private vehicle above 5 km 36 laying of 11kv 3 x 300 sq mm xlpe cable 37 laying of 11kv 3 x 120 sq mm xlpe cable 38 covering ht cable by cement v trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & cable size onthe trough 39 refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 40 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 km 41 transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 km 42 labour charges for laying of lt cable 43 loading and unloading of lt cable including coiling and recoiling 44 transporting of 11 kv lt cable from departmental stores to work spot by engaging private vehicle upto 5 km 45 transporting of 11 kv lt cable from departmental stores to work spot by engaging private vehicle above 5 km 46 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. normal road 47 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. tar road 48 excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and t&p etc. concrete road 49 laying of lt 4 x 240 sq.mm cable 50 laying of lt 4 x 120 sq.mm cable 51 laying of lt 4 x 25 sq.mm cable 52 laying of lt 2 x 16 sq.mm cable 53 refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 54 labour charges for erection of pillar box 55 erection of 4 / 6 way pillar box 3 feet height using concrete only including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc., 56 erection of mini pillar box 3 feet height using concrete only including excavation of foundation pits as per standard specification 2 nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc., 57 cleaning&painting with aluminium paint 2 coats & numbering with fdr details with materials 8 way pillar box 58 cleaning&painting with aluminium paint 2 coats & numbering with fdr details without materials 8 way pillar box 59 cleaning&painting with aluminium paint 2 coats & numbering with fdr details with materials 6 way pillar box 60 cleaning&painting with aluminium paint 2 coats & numbering with fdr details without materials 6 way pillar box 61 cleaning&painting with aluminium paint 2 coats & numbering with fdr details with materials 4 way pillar box 62 cleaning&painting with aluminium paint 2 coats & numbering with fdr details without materials 4 way pillar box 63 cleaning&painting with aluminium paint 2 coats & numbering with fdr details with materials mini pillar box 64 cleaning&painting with aluminium paint 2 coats & numbering with fdr details without materials mini pillar box 65 labour charges for dismantling of pillar box 66 dismantling of old 4 / 6 / 8 way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 67 dismantling of old mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 68 labour charges for miscellaneous work 69 excavation of pole pit (pit size 2x3x1/6th of the length of poles) for 7.5mtrs/8 mtrs pole 70 erection of 7.5m / 8m rcc/rsj/psc pole and other poles 71 excavation of pole pit (pit size 2x3x1/6th of the length of poles) for 9.14m pole 72 erection of 9.14m rcc/rsj/psc pole and other poles 73 trasportation of pole of all sizes from road side to work spot 74 trasportation of pole of all sizes from stores to road side upto 2km 75 trasportation of pole of all sizes from stores to road side upto above 2 km 76 base concerting 30 cm thick for one pole including of all materials 77 transporting of dts/metering sets/line materials through private vehicle from store to work spot / vice versa upto 10 km 78 transporting of dts/metering sets/line materials through private vehicle from store to work spot / vice versa above 10 km 79 erection of v cross arm 3 1/2size 80 erection of v cross arm41/2 size 81 erection of tapping channel 5 size / v cross arm 5 size 82 excavation of stay pit 83 erection of stay set complete 84 fixing of 11 kv ti fitting 85 fixing of 33 kv ti fitting 86 fixing of lt 3 phase cross arm 87 fixing of lt ti fitting 88 fixing of single phase cross arm 89 lt pin insulator with pin 90 lt shackle with strap sets 91 11 kv pin insulator with gi pin 92 33 kv pin insulator with gi pin 93 11 kv strain disc with metal parts 94 33 kv strain disc with metal parts 95 fixing of aluminium knob 96 fixing of caution / danger board 97 providing of fly stay (excluding pole erection and earth excavation) 98 concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and m sand including coping (m sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) 7.5m/8m pole 99 concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and m sand including coping (m sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) 9.14 metres pole (with coping of 1 dia upto height of 1.1/2 above ground level) pole 100 earthing of poles 101 paving out conductor, stringing and sagging of line of 7/2.59mm acsr / 7/2.50 mm aaac conductors of lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 102 paving out conductor, stringing and sagging of line of 7/3.35mm acsr / 7/3.15 mm aaac conductors of lt lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 103 paving out conductor, stringing and sagging of line of 7/4.09mm acsr racoon conductors of ht lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 104 paving out conductor, stringing and sagging of line of 7/4.72mm dog conductors of ht lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 105 numbering of location/each including cost of paint and labour 106 providing of 2 wire flat guarding(split neutral grounding)per span excluding of stay set erection 107 providing of 4 wire flat guarding per span excluding of stay set erection 108 providing of craddle guarding including earthing and earth pit excavation per span excluding of stay set erection 109 erection of street light fittings 2 feet/4 feet (all materials supplied by the board) labour alone. 110 erection of cross bracing set 10 / 15 structure dp structure 111 erection of cross bracing set 10 / 15 structure tp structure 112 erection oftop channels 10 / 15 structure dp structure 113 erection oftop channels 10 / 15 structure tp structure 114 erection of33 kv centre rotating ab switch complete set 115 erection of11 kv centre rotating ab switch complete set 116 erection of single phase spacer 117 erection of three phase spacer 118 provision of jumper per phase for lt 119 provision of jumper per phase for ht 120 provision of pa jumpers 121 loading of metering set 122 un loading of metering set 123 erection of metering sets up to 11kv metering set 124 erection of metering sets above 11kv metering set 125 loading of 7.5/8 metres pole (rcc/psc)/each 126 loading of9.14 metres pole rcc /9.0 mtr psc/9.14 rsj /each 127 unloading of 7.5/8 metres pole (rcc/psc)/each 128 unloading of 9.14 metres pole rcc /9.0 mtr psc/9.14 rsj /each 129 loading of conductor drum of all sizes with conductor 130 loading of conductor drum of all sizes without conductor 131 unloading of conductor drum of all sizes with conductor 132 unloading of conductor drum of all sizes without conductor 133 manufacturing of ms clamps at works spot as per requirement , including alteration by using 50 x 8 mm flat (with material) 134 manufacturing of ms clamps at works spot as per requirement , including alteration by using 65 x 10 mm flat (with material) 135 cutting of channel/flat/angle 136 cutting of rsj pole 137 cutting of tubular pole 138 cutting of rail pole 139 drilling of 5/8, 3/8, 1/ holes in channels / angles slot holes 140 drilling of 5/8, 3/8, 1/ holes in channels / angles round holes 141 fixing of missing doors in ms mini pillar box 142 fixing of missing doors in ms 4 waypillar box 143 fixing of missing doors in ms 6 waypillar box 144 fixing of missing doors in ms 8 waypillar box 145 fixing of missing doors in frppillar box 146 provision of 2 nos hinges in all types of pillar box 147 labour charges for maintenance work 148 dp/tp structure maintenance pole mounted 149 dt maintenance for various capacity 150 structure earthing wire redoing various capacity 151 replacement of structure earthing in complete without material various capacity 152 dt structure yard cleaning various capacity 153 watering to earth pits 154 numbering of location including cost of paint and labour 155 maintenance of 8 way pillar box such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 156 maintenance of 6 way pillar box such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 157 maintenance of 4 way pillar box such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 158 maintenance of mini pillar box such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 159 numbering of pillar with feeder details including cost of paint and labour 160 maintenance of 11 kv abs only at structure.(checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating). 161 maintenance of 11 kv abs only at ss.(checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating). 162 maintenance of 33 kv abs at structure(checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating). 163 maintenance of 33 kv abs at ss(checking of alignment and replacement of wornout fixed and moving contacts pt insulator, changing earthing and lubricating). 164 cutting of big tree fouling on the line. 165 cutting of tree branches fouling on the line. 166 clearing of heavy bushes 167 jungle/bushes/velikathan clearence 168 set righting leanedht/lt poles at pin point location 169 set righting leanedht/lt poles at cut point location 170 re sagging of ht line 7/4.72 mm 171 re sagging (ht/lt) line 7/4.09 mm 172 re sagging (ht/lt) line7/3.35 mm 173 re sagging (ht/lt) line 7/2.59 mm 174 dc of single phase service 175 dc of three phase service 176 rc of single phase service 177 rc of three phase service 178 labour charges for dismantling work 179 dismantling of 7.5m/8.0m poles 180 dismantling of 9.14 mtr. poles/rsj/tubular poles 181 dismantling of stay set complete 182 dismantling of conductors including coiling and transporting from workspot to road side upto 7/3.35mm conductor without transport 183 dismantling of conductors including coiling and transporting from workspot to road side above 7/3.35mm conductor without transport 184 releasing of lt s ph x arm/ti fitting 185 releaasing of lt 3 ph x arm 186 releasing of 3 6 v cross arm/tapping channal/guardingx arm 187 releasing of 4 6 andv cross arm 188 releasing of5v cross arm 189 releasing of distn.tr. only at field 190 dismantling of transformer structure materials up to 100 kva 191 dismantling of transformer structure materials above 100 kva 192 dismantling of 11kv ab switch at structure 193 dismantling of 33kv ab switch at structure 194 dismantling of h.g. fuse set 195 dismantling of ht las at dt structure 196 dismantling of lt las at dt structure 197 dismantling of earth pipe and structure earthing complete 198 dismantling of 2 sets open type fuse unit with all wiring complete(including bus bar arrangement) 199 dismantling of cross bracing set 200 dismantling of top channel 201 dismantling of guarding including dismantling of cross arm per span 202 dismantling of single ph service wire & re effecting service including meter 203 dismantling of three ph service wire & re effecting service including meter 204 breaking of rcc damaged poles after dismantling,releasing the grill including transporting to road side 205 stacking materials/scrap 206 labour charges for erection of single pole structure 207 loading and unloading of 9.0m square pole 208 excavation of pole pit 209 erection of 9.0m square pole 210 transporting of square pole from road side to pole pit 211 excavation of stay pit 0.95x0.60x1.5m 212 erection of stay set complete 213 fixing of single pole structure material in complete shape 214 erection of 16 / 25 / 40 kva distribution transformer 215 transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough 216 structure pole mass concreting and coping 0.6x0.6x1.65 mtr for dp structure including cost of materials and cement. 217 sleeve concrete for stay set including all materials 218 erection of ht las (3 nos) 219 erection of lt las (4 nos) 220 erection of lt wiring kit (double open type circuit) 221 painting of single pole structure including iron materials double coat with materials 222 painting of single pole structure including iron materials double coatwithout materials 223 painting of structure pole with distemper including cost of material 224 gst ...

Southern Railway - Tamil Nadu

33528805 supply of paint aluminium .paint aluminium .,paint aluminium for general purpose in dual container to is:2339/1963 (reaffirmed 2009) amdt. no.4 of april 2006 & icf/md/spec 052, issue status 2, rev.01 packed in 20 litres new and sound non returnable m.s.drums to is:2552/89 gr.b2. => limited...

Tamil Nadu Cooperative Sugar Federation Limited - Tamil Nadu

33496003 co gen paint brush and other items tender notice for co gen paint brush and other items , paint brush 1 , paint brush 2 , paint brush 3 , paint brush 4 , paint enamal as per isi std aluminium paint with heat with stand up to 1200° degree , paint enamal as per isi std blocks , paint enamal as per isi std red oxide , paint po red , precision blue 20 ml tube , pu tube 10 mm , rustoline (500 ml) , spark lighter , std edta 0.02n solution (500 ml) , std h2 so4 0.02.n solution (500 ml) , teflon tape , thinner , transporment plastic cover roll 20 length 50 mtrs. 50 micron , universal ph indicator (make: qualigons) (500 ml) , welding gloves , welding rod e 60183.15mm...

Tamil Nadu Cooperative Sugar Federation Limited - Tamil Nadu

33495993 co gen hardware items tender notice for co gen hardware items , ag 4 cutting wheel , ag 4 grinding wheel , ag 5 cutting wheel , ag 5 grinding wheel , ag 7 grinding wheel , aluminium foil tape 48 mm width 20 mtrs. , aluminium paint oil , baniyan waste , brass 6 mm straight union , cable tie 150 mm , cable tie 300 mm , corrosion coupon rack for cooling tower , da cutting nozzle 3/64 , dal cast 1350 , dm plant mixed bed resin strainer 0.5 thread , emery sheet (120) medium , emery sheet (80) rough , graphite powder , hacksaw blade 12 x 1/2 , hose clamp 1 , hose clamp 2 , kada cloth , kana flex hose 1 , kana flex hose 2 , malecute paste , m seal (100 gm.) , namadha packing 6 feet x 1/2...

Southern Railway - Tamil Nadu

33488110 supply of paint aluminiumpaint aluminium,paint aluminium for general purpose in dual container to is:2339/1963 (reaffirmed 2009) amdt. no.4 of april 2006 & icf/md/spec 052, issue status 2, rev.01 packed in 20 litres new and sound non returnable m.s.drums to is:2552/89 gr.b2. => limited...

Southern Railway - Tamil Nadu

33487966 supply of paint aluminiumpaint aluminium,paint aluminium for general purpose in dual container to is:2339/1963 (reaffirmed 2009) amdt. no.4 of april 2006 & icf/md/spec 052, issue status 2, rev.01 packed in 20 litres new and sound non returnable m.s.drums to is:2552/89 gr.b2. => limited...

Department Of Atomic Energy - Tamil Nadu

33316331 bids are invited for acrylic polyurethane finish paint eau de nil shade , heat resistant silicone aluminium paint , high build epoxy paint eau de nil shade , inorganic zinc silicate primer , thinner for acrylic polyurethane finish paint , thinner for heatresistant silicone aluminium paint , thinner for high buildepoxy paint , thinner for zinc silicate primer total quantity : 3540...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33213453 running contract for erection maintenance dismantling of electrical networks ( oh line and cable ) including ss maintenance in alandur sub divisionat alandur 1 excavation of pole pit / stay pit 2 excavation of pole pit of size 2x2x1 / 6 of theheight of the pole upto8 mtr pole by usingjcbor manual 3 excavation of pole pit of size 2x2x1 / 6 of theheight of thepole for 9 mtr / square pole by usingjcbor manual 4 excavation ofrsj / rail / tubular pole pitabove 9.0m by usingjcb or manual 5 excavation of pit in hard rock placewhich requires blasting 6 excavation of pit in hard rock placewhich doesnotrequires blasting ( where houses arelocated ) 7 excavation of stay pit2x2x5 depthby usingjcb or manual 8 erectionof poles / stay 9 erectionof rccpoles / psc poles / metal polesup to 8.00m ( 27 ) by usingjcb or manual 10 erectionof rccpoles / psc poles / metal poles9.0m by usingjcb or maual 11 erectionof rsj , rail andfabricated poles above 9.0m by usingjcb or maual 12 erection ofstay set complete 13 fixingofline materails 14 fixing of htv cross arms ( all types ) / channel cross arms / guarding cross arms 15 fixing of lt 3 phasecross arms 16 fixing of lt single phase crossarms 17 fixing of ht / lt tifittings 18 fixingofhtpininsulators 11 kv / 22 kv / 33 kv 19 fixingofht11 kv strain disc. 20 fixingofht22 kv / 33 kv strain disc. 21 fixingofltpin insulator 22 fixingofltshackle 23 fixingofaluminium knob 24 earthing ofpole with pinincludingloopingbindingandburying 25 earthing ofadditional cross arm 26 fixingoftop channel 15 centre 27 fixing of beltingangle 28 fixingofcross bracing ( 4 nosangles ) 10 centre 29 fixingofcross bracing ( 4 nosangles ) 15 centre 30 fixing of danger board 31 erectionof transformer centre setarrangments 32 fixingofdistribution transformernameboard ( name ofthe 22 / 11kv #, nameof the ss andcapacity ) includingsupplyof board ( 1 x 1.5x 3 mm thickness ) includingthecostof paintandlabourcharges 33 fixing of lt cable arrangements while erecting singlepole dt 34 fixing of earthcoller for earth pits 35 erectionof aluminium busbarpipe complete for ht busbararrangements for dp structure 36 for triple pole andfour pole structure 37 excavation ofstay pit by jcb or manual 38 erection ofstayset complete 39 lt bus arrangement 40 feederarrangementswith opentypefuseunits 41 lt las fixing 42 paving and stringing of conductor 43 pavingof conductor, stringing, binding, jumpering etc., complete with acsr forlines with dog conductor 44 pavingof conductor, stringing, binding, jumpering etc., complete with acsr forlines with 7 / 4.09 mm 45 pavingof conductor, stringing, binding, jumpering etc., complete with acsr forlines with 7 / 3.35 mm acsr or 7 / 3.15 mmaaac 46 pavingof conductor, stringing, binding, jumpering etc., complete with acsr for lines with 7 / 2.59 mmor 7 / 2.50mm 47 painting of poles and materials 48 numbering of pole by usingenamelpaintincludingcostof paintandpainting charges ( 150diameter with 2.5height letters or 100x150mm with 2.5letters ) 49 paintingof cement polesby usingdistemper paint ( singlecoat ) 50 paintingof metal poles by usingaluminium paint ( singlecoat ) 51 painting oftop channel 52 painting ofab switch 53 painting crossbracing ( 4 nos. angles ) both10 & 15 centre 54 painting oftransformer ( only one coat ) upto100kva 55 painting oftransformer ( only one coat ) above 100kva 56 painting ofhgfuse. 57 painting ofhtmetering set andbox 58 paintingof polesandall other metalparts while erecting newdouble pole 59 paintingof polesandall other metalparts while erecting d.p structure 60 paintingof pole andall other metalparts while erecting newsinglepole distribution transformer structure 61 concretingof poles: 62 structure concreting , concreting of poleswith size ( 2x2x5 ) includingcostof cemnet , jelly andsand with a mixture of 1:3:6andplastering of concrete with ratio1:2 63 sleeve concreting with size ( 2x2x3 ) includingcostof excavation cement , jelly andsand with a mixture of 1:3:6andplastering of concrete with ratio1:2 includingmaterials 64 stayconcreting of staywith size 1.5x 1.5x 3.0includingcostof 40mm cement, jelly andsand ( withsupply ) with mixture 1:3:6 alongsleeve concreting andplastering of concrete portion above theground level with ratio1:2. 65 erection of structure 66 erection of double pole transformer structure complete 67 excavation ofstructurepolepit 2 x 2 x 6 by usingjcb or manual 68 erection ofpolesby usingjcb or manual 69 erection of top channel 70 erection of bed channel 71 erection of crosswith studfor bedchannel 72 belting angle 73 erection ofab switch 74 erection ofh.g.fuse 75 structureearthing complete with 3 pits and earthloops 76 ht las fixing 77 htjumpering complete 78 erection of single pole transformer structure complete 79 excavation ofstructurepolepit 2 x 2 x 6 by usingjcb or manual 80 erection ofpolesby usingjcb or manual 81 erection of tapping channel 82 erection of transformer centre setarrangements 83 erection ofab switch 84 erection ofh.g.fuse 85 structureearthing complete with 3 pits and earthloops 86 ht las fixing 87 htjumpering complete 88 guarding arrangements 89 ltsplit neutral guarding 90 flatguarding including fixingof2 nos. cross armshtlt 91 d.o.t. crossing 92 railway crossing ( cradleguarding ) . 93 . loading , unloading and transporting of materials 94 transportofpoles / materials / conductors / dt / metering set and other materials ( excluding loadingand unloading charges. ) 95 a ) .below8kms. 96 b ) .above 8kms. foradditional km. 97 loading ofpolesup to27 rcc / psc / metal poles 98 loading ofpoles30 rcc / psc polesandrsj pole of all sizes 99 unloading ofpoles 100 loading ofcementbag of50kg. 101 unloading ofcementbag of50kg. 102 loading oftransformeroildrum with oil200lit. capacity 103 unloading oftransformeroildrumwith oil200lit. capacity 104 loading of materials 105 un loading of materials 106 loading andstacking of materials 107 transporting of polesfrom roadsideto pole pit location includingloading and unloading of poles by usingjcb or manualup to 200m 108 transporting of polesfrom roadsideto pole pit includingloading and unloading of poles by usingjcb or manualabove 200m 109 erectionof transformer 110 loading orunloading oftransformer upto 200kva andmeteringset 111 loading orunloading oftransformer above200kva 112 erection of transformerupto200kva includingconnections 113 erection ofnewtransformerabove 200 kva includingconnections 114 loading / unloading / erection of ht meteringsetincludingconnections 115 resagging of conductors 116 re sagging of ht line with acsr 7 / 4.72 mmconductor 117 re sagging of ht / lt line with acsr 7 / 4.09mm conductor 118 re sagging of ht / lt line with acsr 7 / 3.35mm or aaac 7 / 3.15 mm conductor 119 re sagging of ht / lt with acsr 7 / 2.59mm or aaac7 / 2.50 mm conductor 120 other works 121 erection ofstreetlight includingfixure fitting 122 erection ofstreetlight service 123 fixingofnew sv / mv / led lamp fittings 124 assisting forsurvey ofht / lt 125 hutservice fixing 126 agricultural service fixing / service 127 breakingandreleasing ofgrillsfrom rccpsc poles 128 releasing ofsinglephaseservice wire andre fixing. 129 releasing of3 phaseservicewire and ( upto 50 hp ) re fixing. 130 releasing of3 phaseservicewire and ( above 50 hp ) re fixing. 131 labour chargesforalteration ofback clampsto suit forthe works 132 labour chargesforalteration ofstayclampsto suit forthe works 133 fixingofdouble channel x arm / doublevcross arm. 134 erection ofnew earthpipe byreplacing the corroded earthpipe including burying, loopingandbinding 135 providing ltbus bar arrangementin distn.trs. structurelocation 136 fixingofmeteron lv side ofdt 137 earthing of newdouble pole distribution transformer structure complete 138 erection of3 nosnew 10 earth pipe replacing the corroded earthpipe and renewal of earthing including burying looping andbinding. 139 earthing ofd.p.complete 140 earthing of newsinglepole distribution transformer structure complete 141 erection ofconcreteearthtub to distribution transformer earthpipe 142 dismantling ofdetoriated cables / replacement of various size ( 95, 120, 185 sq.mm ) from distribution transformerltbushing to lt open type clamp and provision of suitable lugs at both the ends. 143 dismantling and erection ofltopentype fuse unit aluminium clamps 144 dismantling ofdistn.transformerfrom structure transporting to special maintenance assisting the special maintenance crew inoverhauling and reerection at thestructure. 145 a ) upto 8kms 146 b ) above8kms perkm 147 releasing ofacsr / aaac conductors from conductordrum and coiling acsr 7 / 3.35, 7 / 2.59, aaac 7 / 2.50, 7 / 3.15 mm ( per / km. ) 148 tidingofservice connection with erection ofclamp jumperinlow tension singlephase sc / line, aerial board, fuseunit andlooping. 149 tidingofservice connection with erection ofclampjumperinlow tension three phase line, aerial board, fuseunit andlooping. 150 renewal ofjumperfrom 22 / 11 kv line to ab switch to hg fuse, hg fuse to distn.transformerwith pg clamps. 151 cuttingof coconut leaves / tree branches 152 drilling of hole in channel only 3 / 4 & 1 perhole 153 cuttingof flat 154 cuttingof channel 155 cuttingof angle 156 cuttingof pipe 157 rsj pole cutting 158 rsj pole welding 159 providingof line spacers for singlephase line 160 providingof line spacers for three phase line 161 hiring charges for jcb 162 clearingofjungle 163 clearingof scrupin yard ( dt / ss ) 164 set righttheleaning of pole in ht / lt in pin point 165 set righttheleaning of pole in ht / lt in cut point 166 erectionof lt shuntcapacitor 167 groundpatrolling of ht lines duringbreakdown 168 rectification of snapped ht line duringbreak down 169 rectification of snapped lt line duringbreak down 170 erectionof single phase meters 171 erectionof threephase meters 172 maintenance of distribution transformer 173 monthly maintenance 174 maintainingtransformer yard andearth pits neat andtidy 175 cleaningtheentire transformer includingthebushings 176 checkingfor oil level andreportingif thelevel is belowthemark 177 checkingtheearth connections andwatering theearth pits 178 checkingtheoil leaksandreporting if any noticed 179 reconditioning thebreather ( by reactivating silicagel or replacing it if necessary ) 180 checkingthelt fusesandrenewing them if necessary 181 quarterly maintenance 182 renewing thehg fuses 183 measuring theinsulation resistance andload currents 184 annual maintenance 185 lubricating theab switches andchecking theiroperation 186 checkingthelines andearth connections of ab switch 187 checkingthelines andearth connections of ht andlt lightningarresters 188 checkingthehv andlv bushing connections 189 substation maintenance 190 complete maintenance of powertransformer of all capacities 191 complete maintenance ofbreaker, ct / pt for 110kv andabove 192 complete maintenance of breaker, ct / pt for capacity lessthan110kv 193 complete maintenance of centre rotating switch110kv andabove 194 complete maintenance of centre rotating switchbelow110kv 195 replacement of clampsof all sizes 196 complete maintenance of las 110kv andabove 197 complete maintenance of las below110kv 198 replacement of jumpers lessthan1 metre 199 replacement of jumpers morethan1 metre 200 maintenance of earth pits andwatering 201 cleaningof controlandrelaypanels ( front, back andinside ) 202 mainenance of capacitor bank cell 203 replacement of capacitor bankcell 204 replacement of pt insulator 205 replacement of female / male contact for 110kv 206 replacement of female / male contact for lessthan110kv 207 maintenance of battery 208 dismantling charges 209 dismantling of line materials / other itemsfor which theratehavenotbeen given 210 laying of ht cable 211 excavtion of cable trench 0.6 meters width and 1.2 meters depth including cost 212 normalroad ( earth ) 213 tar road 214 concrete road 215 transporting of 11 kv ht cable from departmental stores to work spot by 216 3x300sq mm xlpe ( 1 drum: 200m ) 217 3x120sq mm xlpe ( 1 drum: 200m ) 218 laying of ht cable 219 laying of 300sq mmxlpe cable 220 laying of 120sq mmxlpe cable 221 coveringht cableby cement v trough aftercovering thecablewith good looseearth includingloading, unloading andtransport from stores to siteand letter painting of feeding details& cable size on thetrough 222 refilling with excavated earth layerswell consolidated as perstdspecification includingall materials, lead, lift etc., complete. 223 transport backany balance cable, empty drums andother materials if any by engaging private vehicleincludingrecoiling, coiling andloadingandunloading at bothsidesfrom workspot to departmental stores ( minimum 2 empty drums ) 224 laying of lt cable 225 transport of lt cable by engaging private vehicle including recoiling coiling and 226 240sq.mm ( 1 drum 200meters ) 227 120sq.mm ( 1 drum 500meters ) 228 25 sq.mm ( 1 drum 500meters ) 229 16 sq.mm ( 1 drum 500meters ) 230 excavation of cable trench 45 cm width and 75 cm depth including cost of 231 normalroad ( earth ) 232 tar road 233 concrete road 234 laying of lt cables 235 laying of 240sq.mm cable 236 laying of 120sq.mm cable 237 laying of 25 sq.mm cable 238 laying of 16 sq.mm cable 239 trenchless cable laying ( new / rectification ) 240 laying of cable using trenchless technique with scanner without pipes 241 upto50 mt lt / 11 kv / 33 kv singlerun 242 above 50 mt lt / 11 kv / 33 kv singlerun 243 erection of pillar box 244 erection of pillar box including excavation of foundation pits as per standard 245 mini pillar boxesfor 3 feet 246 4 / 6 / 8 way pillar box 3 feet 247 4 / 6 / 8 way pillar box 4 feet 248 cleaning, painting with aluminium paint 2 coats & numbering pillar box with 249 8 way pillar box 250 6 way pillar box 251 4 way pillar box 252 mini way pillar box 253 dismantling of pillar box 254 dismantling of old pillar box including associated accessories, loading on the 255 4 / 6 / 8 way pillar box 256 mini pillar box 257 maintenance of pillars works such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing 258 8 way pillar box 259 6 way pillar box 260 4 way pillar box 261 mini pillar box 262 earthing of pillar boxes 263 8 / 6 / 4 andmini pillar boxes 264 lt cable fault rectification works 265 earth work exacavation to the ( cable route ) required depth, width 266 normal 267 tar 268 concrete 269 laying of lt cable 270 240sq mm 271 120sq mm 272 25 sq mm 273 16 sq mm 274 refilling thetrench cable 275 transport of all materials to attending thefaultfrom office to siteandsiteto office vice versa 276 provisionof joint 277 240 / 120 sq mm 278 25 / 16 sq mm 279 ht cable fault rectification works 280 attending to faults in 11kv & 33kv cables by doing it manually 281 earth work excavation to the required depth, width ( cable route ) is 1.2m x 0.6m respectively ( as per prevailing pwlcrates ) 282 normal 283 tar 284 concrete 285 laying of ht cable / m ( as per prevailing pwlcrate ) 286 11 kv 287 33 kv 1 x 630sqmm 288 33 kv 3 x 630sqmm & 3x 400sqmm 289 installation of terminatios by employing private jointer in the absence of company jointer ( intimation to be given to company through mail / company phone nos and record to be maintained ) 290 11 kv 120 / 300 sqmm indoor / outdoor terminations 291 33 kv 1x630sqmm indoor / outdoor terminations 292 33 kv 3x400 / 3x630 sqmm indoor / outdoor terminations 293 installation of joint by employing private jointer in the absence of company jointer ( intimation to be given to company through mail / company phone nos and record to be maintained ) 294 lt 295 11 kv 296 33 kv ( 1x630sqmm ) 297 33 kv ( 3x400sqmm ) 298 refilling with m sand over the cable and joints cost of m sand pwdschedule of rate ) 299 11 kv 300 33 kv 301 refilling labour charges / mtr ( as per pwlcrate ) 302 11 kv 303 33 kv 304 transporting of cables and joint kits from stores to site ( sl.no.7 or 8, whichever is applicable ) 305 11 kv 306 33 kv 307 transporting of cables and joint kits from office to site ( sl.no.7 or 8 , whichever is applicable ) 308 11 kv 309 33 kv 310 rates for labour & tools& plant usedfor attending 33kv & 11kv cable faults 311 engaging jcb for excavation of earth and back filling the earth after rectification of fault 312 11 kv 313 33 kv 314 engaging hydraulic compressor ( tractor ) for breaking concrete / tar roads ( wherever necessary ) 315 11 kv 316 33 kv 317 rental for de watering pump as per pwdschedule of rate ( wherever necessary ) 318 11 kv 319 33 kv 320 engaging labour for manual excavation and cleaning the trench, joint pit excavation and identify the cable in addition to engaging jcb. 321 11 kv 322 33 kv 323 concreting after rectification of fault by using pcc 1:3:6 ( if applicable, with necessary justification & certification by concern executive engineer for reqd length, width and depth as per site condition 324 11 / 33 kv 325 conversion of oh to ug cables 326 releasing the service connection cable from oh line, cutting the service cable of 327 ltug 2x16sqmm cable 328 ltug 4x25sqmm cable 329 ltug 4x120sqmm cable 330 sub total 331 epf @ 13% 332 esi @ 3.25 % 333 gst 18% for sub total 334 total...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33213436 erection and dismantling of networks ( oh line and cable ) including maintenance works of lines and sub stations innanganallur sub division of guindy division. 1 excavation of pole pit / stay pit 2 excavation of pole pit of size 2x2x1 / 6 of theheight of the pole upto8 mtr pole by usingjcbor manual 3 excavation of pole pit of size 2x2x1 / 6 of theheight of thepole for 9 mtr / square pole by usingjcbor manual 4 excavation ofrsj / rail / tubular pole pitabove 9.0m by usingjcb or manual 5 excavation of pit in hard rock placewhich requires blasting 6 excavation of pit in hard rock placewhich doesnotrequires blasting ( where houses arelocated ) 7 excavation of stay pit2x2x5 depthby usingjcb or manual 8 erectionof poles / stay 9 erectionof rccpoles / psc poles / metal polesup to 8.00m ( 27 ) by usingjcb or manual 10 erectionof rccpoles / psc poles / metal poles9.0m by usingjcb or maual 11 erectionof rsj , rail andfabricated poles above 9.0m by usingjcb or maual 12 erection ofstay set complete 13 fixingofline materails 14 fixing of htv cross arms ( all types ) / channel cross arms / guarding cross arms 15 fixing of lt 3 phasecross arms 16 fixing of lt single phase crossarms 17 fixing of ht / lt tifittings 18 fixingofhtpininsulators 11 kv / 22 kv / 33 kv 19 fixingofht11 kv strain disc. 20 fixingofht22 kv / 33 kv strain disc. 21 fixingofltpin insulator 22 fixingofltshackle 23 fixingofaluminium knob 24 earthing ofpole with pinincludingloopingbindingandburying 25 earthing ofadditional cross arm 26 fixingoftop channel 15 centre 27 fixing of beltingangle 28 fixingofcross bracing ( 4 nosangles ) 10 centre 29 fixingofcross bracing ( 4 nosangles ) 15 centre 30 fixing of danger board 31 erectionof transformer centre setarrangments 32 fixingofdistribution transformernameboard ( name ofthe 22 / 11kv #, nameof the ss andcapacity ) includingsupplyof board ( 1 x 1.5x 3 mm thickness ) includingthecostof paintandlabourcharges 33 fixing of lt cable arrangements while erecting singlepole dt 34 fixing of earthcoller for earth pits 35 erectionof aluminium busbarpipe complete for ht busbararrangements for dp structure 36 for triple pole andfour pole structure 37 excavation ofstay pit by jcb or manual 38 erection ofstayset complete 39 lt bus arrangement 40 feederarrangementswith opentypefuseunits 41 lt las fixing 42 paving and stringing of conductor 43 pavingof conductor, stringing, binding, jumpering etc., complete with acsr forlines with dog conductor 44 pavingof conductor, stringing, binding, jumpering etc., complete with acsr forlines with 7 / 4.09 mm 45 pavingof conductor, stringing, binding, jumpering etc., complete with acsr forlines with 7 / 3.35 mm acsr or 7 / 3.15 mmaaac 46 pavingof conductor, stringing, binding, jumpering etc., complete with acsr for lines with 7 / 2.59 mmor 7 / 2.50mm 47 painting of poles and materials 48 numbering of pole by usingenamelpaintincludingcostof paintandpainting charges ( 150diameter with 2.5height letters or 100x150mm with 2.5letters ) 49 paintingof cement polesby usingdistemper paint ( singlecoat ) 50 paintingof metal poles by usingaluminium paint ( singlecoat ) 51 painting oftop channel 52 painting ofab switch 53 painting crossbracing ( 4 nos. angles ) both10 & 15 centre 54 painting oftransformer ( only one coat ) upto100kva 55 painting oftransformer ( only one coat ) above 100kva 56 painting ofhgfuse. 57 painting ofhtmetering set andbox 58 paintingof polesandall other metalparts while erecting newdouble pole 59 paintingof polesandall other metalparts while erecting d.p structure 60 paintingof pole andall other metalparts while erecting newsinglepole distribution transformer structure 61 concretingof poles: 62 structure concreting , concreting of poleswith size ( 2x2x5 ) includingcostof cemnet , jelly andsand with a mixture of 1:3:6andplastering of concrete with ratio1:2 63 sleeve concreting with size ( 2x2x3 ) includingcostof excavation cement , jelly andsand with a mixture of 1:3:6andplastering of concrete with ratio1:2 includingmaterials 64 stayconcreting of staywith size 1.5x 1.5x 3.0includingcostof 40mm cement, jelly andsand ( withsupply ) with mixture 1:3:6 alongsleeve concreting andplastering of concrete portion above theground level with ratio1:2. 65 erection of structure 66 erection of double pole transformer structure complete 67 excavation ofstructurepolepit 2 x 2 x 6 by usingjcb or manual 68 erection ofpolesby usingjcb or manual 69 erection of top channel 70 erection of bed channel 71 erection of crosswith studfor bedchannel 72 belting angle 73 erection ofab switch 74 erection ofh.g.fuse 75 structureearthing complete with 3 pits and earthloops 76 ht las fixing 77 htjumpering complete 78 erection of single pole transformer structure complete 79 excavation ofstructurepolepit 2 x 2 x 6 by usingjcb or manual 80 erection ofpolesby usingjcb or manual 81 erection of tapping channel 82 erection of transformer centre setarrangements 83 erection ofab switch 84 erection ofh.g.fuse 85 structureearthing complete with 3 pits and earthloops 86 ht las fixing 87 htjumpering complete 88 guarding arrangements 89 ltsplit neutral guarding 90 flatguarding including fixingof2 nos. cross armshtlt 91 d.o.t. crossing 92 railway crossing ( cradleguarding ) . 93 . loading , unloading and transporting of materials 94 transportofpoles / materials / conductors / dt / metering set and other materials ( excluding loadingand unloading charges. ) 95 a ) .below8kms. 96 b ) .above 8kms. foradditional km. 97 loading ofpolesup to27 rcc / psc / metal poles 98 loading ofpoles30 rcc / psc polesandrsj pole of all sizes 99 unloading ofpoles 100 loading ofcementbag of50kg. 101 unloading ofcementbag of50kg. 102 loading oftransformeroildrum with oil200lit. capacity 103 unloading oftransformeroildrumwith oil200lit. capacity 104 loading of materials 105 un loading of materials 106 loading andstacking of materials 107 transporting of polesfrom roadsideto pole pit location includingloading and unloading of poles by usingjcb or manualup to 200m 108 transporting of polesfrom roadsideto pole pit includingloading and unloading of poles by usingjcb or manualabove 200m 109 erectionof transformer 110 loading orunloading oftransformer upto 200kva andmeteringset 111 loading orunloading oftransformer above200kva 112 erection of transformerupto200kva includingconnections 113 erection ofnewtransformerabove 200 kva includingconnections 114 loading / unloading / erection of ht meteringsetincludingconnections 115 resagging of conductors 116 re sagging of ht line with acsr 7 / 4.72 mmconductor 117 re sagging of ht / lt line with acsr 7 / 4.09mm conductor 118 re sagging of ht / lt line with acsr 7 / 3.35mm or aaac 7 / 3.15 mm conductor 119 re sagging of ht / lt with acsr 7 / 2.59mm or aaac7 / 2.50 mm conductor 120 other works 121 erection ofstreetlight includingfixure fitting 122 erection ofstreetlight service 123 fixingofnew sv / mv / led lamp fittings 124 assisting forsurvey ofht / lt 125 hutservice fixing 126 agricultural service fixing / service 127 breakingandreleasing ofgrillsfrom rccpsc poles 128 releasing ofsinglephaseservice wire andre fixing. 129 releasing of3 phaseservicewire and ( upto 50 hp ) re fixing. 130 releasing of3 phaseservicewire and ( above 50 hp ) re fixing. 131 labour chargesforalteration ofback clampsto suit forthe works 132 labour chargesforalteration ofstayclampsto suit forthe works 133 fixingofdouble channel x arm / doublevcross arm. 134 erection ofnew earthpipe byreplacing the corroded earthpipe including burying, loopingandbinding 135 providing ltbus bar arrangementin distn.trs. structurelocation 136 fixingofmeteron lv side ofdt 137 earthing of newdouble pole distribution transformer structure complete 138 erection of3 nosnew 10 earth pipe replacing the corroded earthpipe and renewal of earthing including burying looping andbinding. 139 earthing ofd.p.complete 140 earthing of newsinglepole distribution transformer structure complete 141 erection ofconcreteearthtub to distribution transformer earthpipe 142 dismantling ofdetoriated cables / replacement of various size ( 95, 120, 185 sq.mm ) from distribution transformerltbushing to lt open type clamp and provision of suitable lugs at both the ends. 143 dismantling and erection ofltopentype fuse unit aluminium clamps 144 dismantling ofdistn.transformerfrom structure transporting to special maintenance assisting the special maintenance crew inoverhauling and reerection at thestructure. 145 a ) upto 8kms 146 b ) above8kms perkm 147 releasing ofacsr / aaac conductors from conductordrum and coiling acsr 7 / 3.35, 7 / 2.59, aaac 7 / 2.50, 7 / 3.15 mm ( per / km. ) 148 tidingofservice connection with erection ofclamp jumperinlow tension singlephase sc / line, aerial board, fuseunit andlooping. 149 tidingofservice connection with erection ofclampjumperinlow tension three phase line, aerial board, fuseunit andlooping. 150 renewal ofjumperfrom 22 / 11 kv line to ab switch to hg fuse, hg fuse to distn.transformerwith pg clamps. 151 cuttingof coconut leaves / tree branches 152 drilling of hole in channel only 3 / 4 & 1 perhole 153 cuttingof flat 154 cuttingof channel 155 cuttingof angle 156 cuttingof pipe 157 rsj pole cutting 158 rsj pole welding 159 providingof line spacers for singlephase line 160 providingof line spacers for three phase line 161 hiring charges for jcb 162 clearingofjungle 163 clearingof scrupin yard ( dt / ss ) 164 set righttheleaning of pole in ht / lt in pin point 165 set righttheleaning of pole in ht / lt in cut point 166 erectionof lt shuntcapacitor 167 groundpatrolling of ht lines duringbreakdown 168 rectification of snapped ht line duringbreak down 169 rectification of snapped lt line duringbreak down 170 erectionof single phase meters 171 erectionof threephase meters 172 maintenance of distribution transformer 173 monthly maintenance 174 maintainingtransformer yard andearth pits neat andtidy 175 cleaningtheentire transformer includingthebushings 176 checkingfor oil level andreportingif thelevel is belowthemark 177 checkingtheearth connections andwatering theearth pits 178 checkingtheoil leaksandreporting if any noticed 179 reconditioning thebreather ( by reactivating silicagel or replacing it if necessary ) 180 checkingthelt fusesandrenewing them if necessary 181 quarterly maintenance 182 renewing thehg fuses 183 measuring theinsulation resistance andload currents 184 annual maintenance 185 lubricating theab switches andchecking theiroperation 186 checkingthelines andearth connections of ab switch 187 checkingthelines andearth connections of ht andlt lightningarresters 188 checkingthehv andlv bushing connections 189 substation maintenance 190 complete maintenance of powertransformer of all capacities 191 complete maintenance ofbreaker, ct / pt for 110kv andabove 192 complete maintenance of breaker, ct / pt for capacity lessthan110kv 193 complete maintenance of centre rotating switch110kv andabove 194 complete maintenance of centre rotating switchbelow110kv 195 replacement of clampsof all sizes 196 complete maintenance of las 110kv andabove 197 complete maintenance of las below110kv 198 replacement of jumpers lessthan1 metre 199 replacement of jumpers morethan1 metre 200 maintenance of earth pits andwatering 201 cleaningof controlandrelaypanels ( front, back andinside ) 202 mainenance of capacitor bank cell 203 replacement of capacitor bankcell 204 replacement of pt insulator 205 replacement of female / male contact for 110kv 206 replacement of female / male contact for lessthan110kv 207 maintenance of battery 208 dismantling charges 209 dismantling of line materials / other itemsfor which theratehavenotbeen given 210 laying of ht cable 211 excavtion of cable trench 0.6 meters width and 1.2 meters depth including cost 212 normalroad ( earth ) 213 tar road 214 concrete road 215 transporting of 11 kv ht cable from departmental stores to work spot by 216 3x300sq mm xlpe ( 1 drum: 200m ) 217 3x120sq mm xlpe ( 1 drum: 200m ) 218 laying of ht cable 219 laying of 300sq mmxlpe cable 220 laying of 120sq mmxlpe cable 221 coveringht cableby cement v trough aftercovering thecablewith good looseearth includingloading, unloading andtransport from stores to siteand letter painting of feeding details& cable size on thetrough 222 refilling with excavated earth layerswell consolidated as perstdspecification includingall materials, lead, lift etc., complete. 223 transport backany balance cable, empty drums andother materials if any by engaging private vehicleincludingrecoiling, coiling andloadingandunloading at bothsidesfrom workspot to departmental stores ( minimum 2 empty drums ) 224 laying of lt cable 225 transport of lt cable by engaging private vehicle including recoiling coiling and 226 240sq.mm ( 1 drum 200meters ) 227 120sq.mm ( 1 drum 500meters ) 228 25 sq.mm ( 1 drum 500meters ) 229 16 sq.mm ( 1 drum 500meters ) 230 excavation of cable trench 45 cm width and 75 cm depth including cost of 231 normalroad ( earth ) 232 tar road 233 concrete road 234 laying of lt cables 235 laying of 240sq.mm cable 236 laying of 120sq.mm cable 237 laying of 25 sq.mm cable 238 laying of 16 sq.mm cable 239 trenchless cable laying ( new / rectification ) 240 laying of cable using trenchless technique with scanner without pipes 241 upto50 mt lt / 11 kv / 33 kv singlerun 242 above 50 mt lt / 11 kv / 33 kv singlerun 243 erection of pillar box 244 erection of pillar box including excavation of foundation pits as per standard 245 mini pillar boxesfor 3 feet 246 4 / 6 / 8 way pillar box 3 feet 247 4 / 6 / 8 way pillar box 4 feet 248 cleaning, painting with aluminium paint 2 coats & numbering pillar box with 249 8 way pillar box 250 6 way pillar box 251 4 way pillar box 252 mini way pillar box 253 dismantling of pillar box 254 dismantling of old pillar box including associated accessories, loading on the 255 4 / 6 / 8 way pillar box 256 mini pillar box 257 maintenance of pillars works such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing 258 8 way pillar box 259 6 way pillar box 260 4 way pillar box 261 mini pillar box 262 earthing of pillar boxes 263 8 / 6 / 4 andmini pillar boxes 264 lt cable fault rectification works 265 earth work exacavation to the ( cable route ) required depth, width 266 normal 267 tar 268 concrete 269 laying of lt cable 270 240sq mm 271 120sq mm 272 25 sq mm 273 16 sq mm 274 refilling thetrench cable 275 transport of all materials to attending thefaultfrom office to siteandsiteto office vice versa 276 provisionof joint 277 240 / 120 sq mm 278 25 / 16 sq mm 279 ht cable fault rectification works 280 attending to faults in 11kv & 33kv cables by doing it manually 281 earth work excavation to the required depth, width ( cable route ) is 1.2m x 0.6m respectively ( as per prevailing pwlcrates ) 282 normal 283 tar 284 concrete 285 laying of ht cable / m ( as per prevailing pwlcrate ) 286 11 kv 287 33 kv 1 x 630sqmm 288 33 kv 3 x 630sqmm & 3x 400sqmm 289 installation of terminatios by employing private jointer in the absence of company jointer ( intimation to be given to company through mail / company phone nos and record to be maintained ) 290 11 kv 120 / 300 sqmm indoor / outdoor terminations 291 33 kv 1x630sqmm indoor / outdoor terminations 292 33 kv 3x400 / 3x630 sqmm indoor / outdoor terminations 293 installation of joint by employing private jointer in the absence of company jointer ( intimation to be given to company through mail / company phone nos and record to be maintained ) 294 lt 295 11 kv 296 33 kv ( 1x630sqmm ) 297 33 kv ( 3x400sqmm ) 298 refilling with m sand over the cable and joints cost of m sand pwdschedule of rate ) 299 11 kv 300 33 kv 301 refilling labour charges / mtr ( as per pwlcrate ) 302 11 kv 303 33 kv 304 transporting of cables and joint kits from stores to site ( sl.no.7 or 8, whichever is applicable ) 305 11 kv 306 33 kv 307 transporting of cables and joint kits from office to site ( sl.no.7 or 8 , whichever is applicable ) 308 11 kv 309 33 kv 310 rates for labour & tools& plant usedfor attending 33kv & 11kv cable faults 311 engaging jcb for excavation of earth and back filling the earth after rectification of fault 312 11 kv 313 33 kv 314 engaging hydraulic compressor ( tractor ) for breaking concrete / tar roads ( wherever necessary ) 315 11 kv 316 33 kv 317 rental for de watering pump as per pwdschedule of rate ( wherever necessary ) 318 11 kv 319 33 kv 320 engaging labour for manual excavation and cleaning the trench, joint pit excavation and identify the cable in addition to engaging jcb. 321 11 kv 322 33 kv 323 concreting after rectification of fault by using pcc 1:3:6 ( if applicable, with necessary justification & certification by concern executive engineer for reqd length, width and depth as per site condition 324 11 / 33 kv 325 conversion of oh to ug cables 326 releasing the service connection cable from oh line, cutting the service cable of 327 ltug 2x16sqmm cable 328 ltug 4x25sqmm cable 329 ltug 4x120sqmm cable 330 sub total 331 epf @ 13% 332 esi @ 3.25 % 333 gst 18% for sub total 334 total...

Chennai Petroleum Corporation Limited - Tamil Nadu

33207938 zonal contract 2022 23 for projects related electrical works in manali refinery of cpcl zonal contract 2022 23 for projects related electrical works in manali refinery of cpcl , ht cable laying in trenches: the scope of work includeslaying of armoured / unarmoured pilca / pvc insulated and pvc sheathed / xlpe ht power cables of voltage grade exceeding 1.1 kv but not exceeding 11 kv ( e ) of following sizes in pre excavated cable trench or existing trench / rcc or hume or stoneware or metal pipe / masonry duct, fixing of cable number tag at specified interval and both ends, testing plus transportation from stores to site , unpacking, straightening, dressing of cable, required clamping, cable route markering at a frequent interval and returning the empty drum / cable drum with unused cable, if any, to stores / scrap yard or any other place within cpcl , all complete with labour as per the drawings, specifications of the tender and directions of the engineer in charge. note: necessary crane or forklift, tractor and trailershall be arranged by the contractor. the scope also includes area cleaning and vegetation removal as a enabling activity for cable laying. the scope excludes supply of cables. , single core, upto 630 sq.mm , from 3c x 120 sq.mm to 3c x 185 sq.mm , from 3c x 185 sq.mm to 3c x 300 sq.mm , ht cable laying on trays / structures: the scope of work includes horizontal and vertical laying of armoured / unarmoured pilca / pvc insulated and pvc sheathed / xlpe ht power cables of voltage grade exceeding 1.1 kv but not exceeding 11 kv ( e ) of following sizes on cable racks / wall and steel structures upto any height, fixing of saddles, aluminium strip, number tags ( if required ) , testing plus transportation from stores to site, unpacking, straightening, dressing of cable, fixing with clams / cleats as required and returning the empty drum / cable drum with unused cable, if any, to stores / scrap yard or any other place within cpcl , all complete with labour as per the drawings, specifications of the tender and directions of the engineer in charge. note: necessary crane or forklift, tractor and trailershall be arranged by the contractor.the scope also includes area cleaning and vegetation removal as a enabling activity for cable laying. the scope excludes supply of cables. , single core, upto 630 sq.mm , from 3c x 120 sq.mm to 3c x 185 sq.mm , from 3c x 185 sq.mm to 3c x 300 sq.mm , laying of lt power / control / telephone / plant communication and other cables in trenches: the scope of work includes horizontal and vertical laying of one or more armoured / unarmoured pijf / pvc insulated and pvc sheathed / xlpe lt power ( voltage grade upto1.1 kv ) / multi pair or multicore control cables / telephone and other cables of following sizes in pre excavated cable trench or existing trench / rcc or hume or stoneware or metal pipe / masonry duct, fixing of cable number tag at specified interval and both ends, testing plus transportation from stores to site, unpacking, straightening, dressing of cable, required clamping, and returning the empty drum / cable drum with unused cable, if any, to stores / scrap yard or any other place within cpcl , all complete with labour as per the drawings, specifications of this tender and directions of the engineer in charge. for 2c, 3c, 4c cables below rates of 3.5c cables will be applicable. note: necessary crane or forklift, tractor and trailershall be arranged by the contractor. the scope also includes area cleaning and vegetation removal as a enabling activity for cable laying. the scope excludes supply of cables. , all controlcables and power cables upto 3.5 c x 25 sq.mm , power cables above 3.5c x 25 sq.mm upto 3.5c x 95 sq.mm , power cables above 3.5c x 95 sq.mm upto 3.5c x 185 sq.mm , power cables above 3.5c x 185 sq.mm upto 3.5c x 300 sq.mm , single core cable above 500 sq.mm upto 1000 sq.mm , laying of lt power / control / telephone / plant communication and other cables on cable trays / structures: the scope of work includes horizontal and vertical laying of one or more armoured / unarmoured pijf / pvc insulated and pvc sheathed / xlpe lt power ( voltage grade upto1.1 kv ) / control / telephone and other cables of following sizeson cable racks / wall and steel structures upto any height, fixing of saddles, aluminium strip, fixing of cable number tag at specified interval and both ends, testing plus transportation from stores to site, unpacking, straightening, dressing of cable, fixing with clams / cleats as required and returning the empty drum / cable drumwith unused cable, if any, to stores / scrap yard or any other place within cpcl etc. all complete with labour as per the drawings, specifications of this tender and directions of the engineer in charge. for 2c, 3c, 4c cables below rates of 3.5c cables will be applicable. note: necessary crane or forklift, tractor and trailershall be arranged by the contractor. the scope also includes area cleaning and vegetation removal as a enabling activity for cable laying. the scope excludes supply of cables. , all controlcables and power cables upto 3.5 c x 25 sq.mm , power cables above 3.5c x 25 sq.mm upto 3.5c x 95 sq.mm , power cables above 3.5c x 95 sq.mm upto 3.5c x 185 sq.mm , power cables above 3.5c x 185 sq.mm upto 3.5c x 300 sq.mm , single core cable upto 1000 sq.mm , temporary cable laying : the scope of work includes temporary layingof ht / lt power / control / telephone cables on any surface as required including shifting, handling, testing, cutting, sealing, etc., transporation of cable from stores to site and returning the empty drum / cable drum with unused cable, if any, to stores / scrap yard or any other place within cpcl , all complete with labour and materials as per the drawing, specification of this tender and direction of the engineer in charge.for 2c, 3c, 4c cables below rates of 3.5c cables will be applicable. note: necessary crane or forklift, tractor and trailershall be arranged by the contractor. the scope also includes area cleaning and vegetation removal as a enabling activity for cable laying. the scope excludes supply of cables. , all lv control cables and lv power cables upto 3.5c x25 sq.mm , lv power cables above 3.5c x 25 sq.mm upto 3.5c x 95 sq.mm , lv power cables above 3.5c x 95 sq.mm upto 3.5c x 185 sq.mm , lv power cables above 3.5c x 185 sq.mm upto 3.5c x 300 sq.mm , single core lv power cable upto 1000 sq.mm , single core ht cable upto 630 sq.mm , ht cables from 3c x 120 sq.mm upto 3c x 185 sq.mm , ht cables from 3c x 240 sq.mm upto 3c x 300 sq.mm , cat 6 cabling: the scope of work includes supply and laying of cat 6 type in already available pvc pipe / casing caping with all necessary accessories for computer networking. only isi marked wires of make finolex / polycab / havells / kei / rpg / v guard shall be used. , straight through jointing kit , ht cable jointing kits: the scope of work includes supply of heat shrinkable straight through jointing kitsand making straight through joints for xlpe insulated ht power cables 6.6kv / 11kv ( ue ) grade of following sizeswith copper / aluminium ferrules including all labour, tools and materials, as per the direction of engineer in charge. , 1c upto 630 sqmm , 3c upto 300 sqmm , lt cable jointing kits: the scope of work includes supply ofstraight through jointing kitsand making straight through joints for pvc insulated ltpower cables, control cables of 1100v grade of following sizeswith copper / aluminium ferrules including all labour, tools and materials, as per the direction of engineer in charge. for 2c, 3c, 4c cables below rates of 3.5c cables will be applicable. , all control cables / lv power cables upto 3.5c x 25 sq.mm , lv power cables above 3.5c x 25 sq.mm upto 3.5c x 95 sq.mm , lv power cables above 3.5c x 95 sq.mm upto 3.5c x 185 sq.mm , lv power cables above 3.5c x 185 sq.mm upto 3.5c x 300 sq.mm , single core lv power cable upto 1000 sq.mm , glanding & end termination , ht end termination kits: the scope of work includes supply of heat shrinkable end termination kits and making end terminations for xlpe / pvc insulated ht power cables of 6.6kv / 11kv ( ue ) grade of following sizes including supply of copper / aluminium lugs, crimping / soldering as necessary, earthing of armour, connecting to equipment terminal, including cutting, stripping and glandingwith all labour, tools and materials and as per the direction of engineer in charge. note: the scope excludes supply of glands. , 1c upto 630 sq.mm , 3c upto 300 sqmm , lt cable end termination: the scope of work includes glanding and making end terminations for xlpe / pvc insulated lt power cables of 1100 v grade of following sizes including supply of copper / aluminium lugs, bimetallic strip, crimping paste, crimping / soldering as necessary, earthing of armour, connecting to equipment terminal, including cutting stripping and glandingwith all labour, tools and materials and as per the direction of engineer in charge. for 2c, 3c, 4c cables below rates will be applicable. note: the scope excludes supply of glands. , all lv control cables and lv power cables upto 3.5c x 25 sq.mm , lv power cables above 3.5c x 25 sq.mm upto 3.5c x 95 sq.mm , lv power cables above 3.5c x 95 sq.mm upto 3.5c x 185 sq.mm , lv power cables above 3.5c x 185 sq.mm upto 3.5c x 300 sq.mm , single core lv power cable upto 1000 sq.mm , communication cable end termination: the scope of work includes end terminations oftelephone / plant communicationcables of 1100 v gradeof following sizes including supply oflugs, crimping / soldering as necessary, connections in crone terminal / any terminals, including cutting , stripping and glanding, all complete with labour, tools and material, as per specifications of this tender and directions of engineer in charge. the scope excludes the supply of cable glands. , 100 paircommunication cable , 20 pair to 50 pair communication cable , upto 10 pair communication cable , gi pipes: the scope of work includes supply and laying of gi pipes of following sizes of class ‘b’ type, fixed on steel, duct bank, concrete, wall crossing, wing trenches or similar structures, including shifting of pipes to site using contractors vehicle, cutting, bending, threading, supply & installation of supports, clamps, small iron structures, spacer, seats, plugs, bush and fittings / fixtures like bends, tees, nipples, reducers etc., all complete with labour and materials, as per the specifications of this tender and directions of engineer in charge. the scope of work also includes sealing of pipe ends and joints with bushes and bitumen based fillings and other miscellaneous works to make the piping water tight. , 150 mm od gi pipe , 100 mm od gi pipe , 50 mm od gi pipe , miscellaneous electrical works , supply of extension board: the scope of work includes supply of 4 way extension board ofhavells ahlklup104 maglev or equivalent model, as per the specifications of this tender and directions of engineer in charge. , decorative luminaire: the scope of work includes supply and fixing of ( 2’ x 2’ ) decorative led luminaire of philips make rc380b g3, minimum 34w, 6500k fiting or equivalent in philips / cg / ge / havells, including consumables required for suspension / clamp arrangement, civil work ( if any ) required for installation, all complete with labour , tools and materials, as per the specifications of this tender and directions of engineer in charge. , led downlights: the scope of work includes supply & fixing of recess mounted, compact vertical, round shapedupto 10w led 6000k downlighter with removable driver of havells make or equivalentsuitable for low ceiling heights, all complete with labour and materials, as per the specifications of this tender and directions of engineer in charge. , tube light fitting: the scope of work includes supply and fixing of led decorative slim linear 4 ft batten fittings with bulb min.18 w 6500 k1, cool daylight ( cdl ) , of havells catalogue or equivalent , including civil work ( if any ) required for installation, all complete with labour and materials, as per the specifications of this tender and directions of engineer in charge. , twin led tube light fitting: the scope of work includes supply and fixing ofmin. 2 x 18 watts 4 ft industrial tube light fittings with bulb of havells catalogue titania sleek t8 led tubelight or equivalent, including civil work ( if any ) required for installation, all complete with labour and materials, as per the specifications of this tender and directions of engineer in charge. , socket outlet: the scope of work includes supply and fixing of 20 amps, 240 volts, spn industrial type, socket outlet, with 2 pole and earth, metal enclosed plug top along with 20 amps, g series, single pole mcb in sheet steel enclosure, on surface or in recess, with chained metal cover for the socket outlet, including connections, testing and commissioning etc. as required, all complete with labour and materials, as per the specifications of this tender and directions of engineer in charge. note:isi marked sockets of approved make shall be used. , 3 phase 6 way distribution board: the scope of work includes supply, erection, connecting, testing and commissioning of 3 phase 6 way distribution board concealed in wall / partition. the board shall be powder coated with below mentioned provisions and necessary accessories for db, all complete with labour , tools and materials, as per the specifications of this tender and directions of engineer in charge. note:isi marked components of approved make shall be used. , with incoming 63a four pole mcb, 63a 30ma elcb and out going 18 nos. of 6 / 10 amps mcbs , 4 way flp / wp junction box: the scope of work includes supply of 4 way junction box of below mentioned type, as per the specifications of this tender and directions of engineer in charge. note:isi marked components of approved make shall be used. , flameproof jb , weather proof jb , supply of mcb: the scope of work includes supply of following rating, 240 / 415 volts, 50hz, 10kaminiature circuit breaker ( suitable for motor, lighting and other inductive loads and conforming to is 8828: 1996, iec 60898: 2002 ) of following poles in the existing mcb db with required rails / fastenersfor fixing as per the specifications of this tender and directions of engineer in charge. note: isi marked mcbs as per approved vendor list attached with the tender shall be used. , upto 32a, single pole , upto 32a, double pole , upto 63a, 4p / tpn , installation of mcb:the scope of work includes fixing of mcbupto 63 a, 4p with required rails / fastenersincluding connections, testing and commissioning etc, all complete with labour and tools, as per the specification of this tender and directions of engineer in charge , supply of rccb: the scope of work includes supply offollowing rating 240 / 415 volts, residual current circuit breaker ( rccb ) , isi marked, having a sensitivity current indicated miliamperes in the existing mcb db with required rails / fastenersfor fixing, all complete with labour and materials, as per the specifications of this tender and directions of engineer in charge. note: isi marked rccb shall be used. , upto 32 a, 30 ma, 2p , 63 amps., 30 ma, 4p , installation of rccb:the scope of work includes fixing of rccb of rating upto 63 a, 4p with required rails / fastenersincluding connections, testing and commissioning etc, all complete with labour and tools, as per the specification of this tender and directions of engineer in charge , supply of mpcb: the scope of work includes supply offollowing rating ofmotor protection circuit breaker ( mpcb ) , isi marked with required rails / fastenersfor fixing, all complete with labour and materials, as per the specifications of this tender and directions of engineer in charge. , upto 6.3 a , above 6.3 a upto 13 a , above 13 a upto 25 a , above 25 a upto 32 a , installation of mpcb:the scope of work includes fixing of mpcb of following rating with required rails / fastenersincluding connections, testing and commissioning etc, all complete with labour and tools, as per the specification of this tender and directions of engineer in charge. , supply of pvc wires: the scope of work includes supply of following size of pvc insulated, copper conductor for laying in the existing surface / recessed, pvc / steel conduit / pvc casing and capping as required, as per the specifications of this tender and directions of engineer in charge. note: only isi marked cables shall be used. , 1.5 sq.mm , 2.5 sq.mm , 4 sq.mm , 6 sq.mm , supply of pvc conduits: the scope of work includes supply of following size of pvc conduit along with the accessories to be used for installation in surface / concealed as required, as per the specifications of this tender and directions of engineer in charge. note: only isi marked conduits shall be used. , upto 25 mm , above 25 mm upto 40 mm , above 40 mm , laying of pvc conduit: the scope of work includes fixing of following size of pvc conduit along with the accessories to be used for installation in surface / concealed as required, including cutting the wall and making good the same in case of recessed, as per the specifications of this tender and directions of engineer in charge. , upto 40 mm , more than 40 mm , supply of pvc casing / caping: the scope of work includes supply of following size of pvc casing and capingon surface as required, as per the specifications of this tender and directionsof engineer in charge. , 20 mm x 10 mm , 25 mm x 10 mm , 40 mm x 20 mm , laying of pvc casing / caping: the scope of work includes fixing of following size of pvc casing and capingon surface as required, as per the specifications of this tender and directions of engineer in charge. , upto 40 mm x 20 mm , laying of pvc wires: the scope of work includes drawing / laying of following size of pvc insulated, copper conductor for laying in the existing surface / recessed, pvc / steel conduit / pvc casing and capping as required, as per the specifications of this tender and directions of engineer in charge. , 1 x 1.5 sq.mm , 2 x 1.5 sq.mm , 3 x 1.5 sq.mm , 1 x 2.5 sq.mm , 2 x 2.5 sq.mm , 3 x 2.5 sq.mm , 2 x 4 sq.mmto 2 x 6 sq.mm , switch socket / outlet: the scope of work includes supply, fixing and connection of 250 vflush type anchor make or approved equivalent switch, socket bell push etc. on perpex sheet on ms box including supply and fixing of nuts, bolts, cutting etc. but excluding the perpex sheet, all complete with labour and materials, as per the specifications of this tender and directions of engineer in charge. , 1 way 5 / 6 amps. penta flush type switch with isi mark , 1 way 15 / 20 amps penta flush type switch with isi mark , 5 pins 5 / 6 amps. penta flush type socketwith isi mark , 6 pins 10 / 20 amps.socket outlet with isi mark , 3 pins 5 / 6 amps. isi marked polycarbonate unbreakable plug top , 3 pins 15 / 16 amps. isi marked polycarbonate unbreakable plug top , telephone jack , 10 / 20 amps 5 pins switch socket combinedisi marked , supply and fixing of module box:supply and fixing of plastic / metal boxes of following sizes with all accessories including necesssary base frame plates / mounting plates, etc., suitable for fixing decorative switches of type roma or equivalent make in havells / siemens / anchor / l&t , 1 or 2 module box , 3 module box , 4 module box , 6 module box , 8 module box , 12 module box , supply, fixing and connection of modular type of anchor make ( roma ) or approved equivalent switch, socket bell push etc in havells / siemens / anchor / l&t / equivalent, complete with labour, tools andmaterials as per direction of the engineer in charge. , 10 a, 1way switch , 20a, 1 way switch , 3 pins 5 / 6 amps socket with isi mark , 3 pins 10 / 20a, heavy duty uni socket outlet with isi mark , 3 pins 5 / 6 amps. isi marked polycarbonate unbreakable plug top , 3 pins 15 / 16 amps. isi marked polycarbonate unbreakable plug top , rj11 telephone jack single with shutter along with base module box , single module dimmer / fan regulator 450w , rj 45 computer socket cat 6 with shutter & box , elmex terminals: the scope of work includes supply & installation of elmex type terminals, wherever required. the scope of work also includes drilling holes, providing and fixing clamps / din rail, nuts and bolts etc. suitable for terminating copper conductor of below mentioned size as per drawings and specifications of this tender and directions of engineer in charge. ( per terminal ) . , elmex connectors of 2.5 / 4 sq.mm , elmex connectors of 6 / 10 sq.mm , elmex cbt 110 connectors from 16 sq.mm upto 50 sqmm ( with bars ) , din rail channels: the scope of work includes supply and fixing of din rail channels for installation of elmextype terminals wherever required. the scope of work also includes drilling holes, providing and fixing clamps, nuts and bolts etc., as per the drawings and specifications of this tender and directions of engineer in charge. , telephone system , 2 pair telephone cable: the scope of work includes supply and laying of 2 pair telephone cablefrom the epabx system / telephone jb to officer’s table, all complete with labour, tools and materials, as per the specifications of this tender and directions of engineer in charge. , 100p telephone junction box: the scope of work includes supply and installation of 100 pair telephone junction box with crone connector with cable entry provision for1 number of 100 pair cable for incomingand 1 number of 50 pair cable, 2 numbers of 20 pair cable , 1 number of10 pair cable for out going, all complete with labour, tools and materials, as per the specifications of this tender and directions of engineer in charge. , 50p telephone junction box: the scope of work includes supply and installation of 50 pair telephone junction boxwith crone connector with cable entry provision for 1 number of50 pair cable for incomingand 2 numbers of20 pair cableand 1 number of 10 pair cablefor out going, all complete with labour, tools and materials, as per the specifications of this tender and directions of engineer in charge. , 20p telephone junction box: the scope of work includes supply and installation of 20 pair telephone junction boxwith crone connector with cable entry provision for 1 number of 20 pair cablefor incomingand 2 numbers of 10 pair cablefor out going, all complete with labour, tools and materials, as per the specifications of this tender and directions of engineer in charge. , supply of corded telephone: the scope of work includes supply of telephone instruments of model m71corded landline phone of beetel make or equivalent as per the direction of engineer in charge. , supply of cordless telephone: the scope of work includes supply of telephone instruments of model x69n cordless landline phone of beetel make or equivalent as per the direction of engineer in charge. , supply of flameproof telephone:the scope of work includes supply of flameproof telephone instrument as per the specification of this tender and directions of engineer in charge. , fans , ceiling fan: the scope of work includes supply, installation, testing and commissioning of 1200mm sweep bldc ceiling fan ofbajaj / crompton greaves / khaitan / usha / havells / atomberg / equivalent make of following sweep withceiling fan, including wiring the down rod of standard length ( upto 30 cm ) with 1.5 sqmm, pvc insulated, copper conductor, single core cable etc., as required, , as per the specifications of this tender and directions of engineer in charge. , exhaust fan: the scope of work includes supply offresh air fan / exhaust fan of almonard / bajaj / crompton greaves / khaitan / usha / havells / equivalent make of below mentioned sweep andinstallation in existing frames, testing and commissioning offresh air fan / exhaust fan, including lead in wires and accessories as required, all complete with labour and material, with necessary fixing accessories, louvers wherever required, as per the specifications of this tender and directions of engineer in charge. , 300 mm sweep , 450 mm sweep, heavy duty industrial type , upto 450 mm sweep, flp , wall mounted fan: the scope of work includes supply of bldc wall mounted fans of bajaj / crompton greaves / khaitan / usha / havells / atomberg / equivalent make of 400mm sweep and installation, testing and commissioning of wall mounted fan, including wires and accessories as required, all complete with labour and material, necessary fixing accessories, as per the specifications of this tender and directions of engineer in charge. , pedestal fan: the scope of work includes supply ofbldc pedestal fans of bajaj / crompton greaves / khaitan / usha / havells / equivalent make of 400mm sweep and installation, testing and commissioning of the same, including wires and accessories as required, all complete with labour and material, as per the specifications of this tender and directions of engineer in charge. , installation & commissioning of flp / wp fittings: the scope of work includes installation, connection, testing and commissioning of flp / wp type fittings such as junction boxes, welding sockets, lighting panels, convenience outlets / convenience outlets with built in transformer etc, in surface / channel / wall / steel structuresall complete, with labour and tools as per drawings & specifications of this tender and directions of engineer in charge. , weight of the unit upto 2 kg , weight of the unit above 2 kg but upto 5 kg , weight of the unit above 5 kg but upto 10 kg , weight of the unit above 10 kg but upto 20 kg , weight of the unit above 20 kg but upto 50 kg , cable tray , supply of cable trays: the scope of work includes supply of the following sizes of gi cable trays of ladder type / perforated type made out of hot rolled sheet steel of 2mm thick including straight length elbows, tees, crosses, couplers plates etc., as per the specification of this tender and directions of engineer in charge. , upto 50 mm , above 50 mm but upto 100 mm , above 100mm but upto 150 mm , above 150 mmbut upto 300 mm , above 300 mmbut upto 450 mm , installation of cable trays: the scope of work includes installation of the following sizes of gi cable trays of ladder type made out of hot rolled sheet steel of 2mm thick including straight length elbows, tees, crosses, couplers plates, cable tray supports etc., including welding and bolting of cable trays in existing / new supports, all complete with labour and tools, as per the specification of this tender and direction of engineer in charge. , upto 150 mm , above 150 mmbut upto 300 mm , above 300 mmbut upto 450 mm , push button stations , supply : the scope of work includes supply of industrial weather prooftype push button stations with canopy, with start & stop push buttons and ammeter of scale suitable for motor , as per the specifications of this tender and directions of engineer in charge. , supply: the scope of work includes supply of industrial flp type push button stationswith canopy, with start & stop push buttons and ammeter of scale suitable for motor, as per the specifications of this tender and directions of engineer in charge. , supply: the scope of work includes supply of industrial frp type push button stations with canopy, with start & stop push buttons and ammeter of scale suitable for motor, as per the specifications of this tender and directions of engineer in charge. , supply : the scope of work includes supply of industrial weather prooftype push button stations with canopy, with start & stop push buttons, auto / manual switch and ammeter of scale suitable for motor, , as per the specifications of this tender and directions of engineer in charge. , supply: the scope of work includes supply of industrial flp type push button stationswith canopy, with start & stop push buttons, auto / manual switch and ammeter of scale suitable for motor, as per the specifications of this tender and directions of engineer in charge. , supply: the scope of work includes supply of industrial frp type push button stations with canopy, with start & stop push buttons, auto / manual switch and ammeter of scale suitable for motor, as per the specifications of this tender and directions of engineer in charge. , commissioning: the scope of work includes installation, testing & commissioning of wp / frp / flp push button stations, with ms channels grouted with pcc including excavation, alignment, erection and connection of push button, connection of control cable, earthing including supply and fixing of saddles, nuts, bolts etc., painting with two coats of bituminous aluminium paint / synthetic enamel paint over a coat of red oxide primer, including supply of necessary hardware, touch up painting, including supply of paint, including transportation to site at the place of installation, unpacking, using contractors own testing equipments, tools & tackles, all complete with labour , tools and materials, as per the specifications of this tender and directions of engineer in charge. , earthing system , earth pit: the scope of work includes supply , installation , testing and commissioning ofearth pitwith 65 mm dia 3000 mm longearth electrodes , complete with all necessarymaterialsincludingexcavation of earth pit, all civil works, chamber constructions , fillingwith charcoaland salt, back filling , providing cement ( concrete ) slab for earth pits, paintingand markingof earth pit nosand connectionsincluding all labour, tools and materials as per the specifications of this tender and directions of engineer in charge. , earth flat / wire: the scope of work includes supply, installation and connection of following gi earthing strips along the cable trenches or cable trays or fixing to walls or structures and for connecting equipments to the plant grid including welding at joints, providing anti corrosive paint or bitumen and jute covering for welded portion, clamping and necessary hardware for connection etc., including all labour and materials, as per approved drawings, specification of this tender and direction of engineer in charge. , supply of earth flats , 75 x 10 gi earth flat , 25 x 3 gi earth flat , 50 x 10 gi earth flat , 40 x 6 gi earth flat , 25 x 6 gi earth flat , 8 swg wire for earthing , installation of earth flats / gi wire / pvc insulated cable cores the scope of work includes installation ofearth flats / gi wire / pvc insulated single core cablefor earthing with all labour and material including nuts, bolts, washers, aluminium lugs etc , as per the specifications of this tender and directions of engineer in charge. , 75 x 10 gi earth flat , 50 x 10 gi earth flat , 40 x 6 gi earth flat , 25 x 3 gi earth flat , 25 x 6 gi earth flat , 8 swgwire , upto 25 sq.mm cable , above 25 sq.mm upto 70 sq.mm cable , above 70 sq.mm upto 185 sq.mm cable , lighting system , supply of street light poles: the scope of work includes supply of7 m ( above ground ) octagonal gi street light poles of make bajaj / philips / cg / ge / havells / equivalent make with marshalling box to accommodate insulated armoured cablewith terminals, with supply of all necessary accessoriesandmaterial , as per the drawings attached with the tender and direction of engineer in charge. the scope of work also includes supply of suitable cable from fixture to marshalling box but excluding street light fixtures. , installation / commissioning of street light poles: the scope of work includes installation of7 metres street light poles with marshalling box to accommodate 2 nosof4 x 10 sq.mm pvc insulated armoured cablewith elmex connectors, earthing of pole / marshalling box & connecting it to the existing earth grid, but excluding lighting fixtures , including excavation, suitable foundation / mounting arrangement with all labour and tools , as per specifications and drawings attached with the tender and direction engineer in charge. if the street lighting pole is issued as a free issue item to contractor by cpcl, then the contractor is required to shift the lighting pole within the cpcl premesis to the site as per the direction of engineer in charge. the scope of work also includes laying of suitable cable from fixture to marshalling box. , supply of platform light poles: the scope of work includes supply of3 metres gi platform light poleswith supply of all necessary accessories and material, as per the drawings attached with the tender and direction of engineer in charge. the scope of work also includes supply of suitable cable from fixture to marshalling box but excluding light fixtures. , installationof platform light poles: the scope of work includes installation ofplatform light poles with 4 way flp / wp jb including all sundry material as required, painting, welding and all structural works, with all labour and tools , as per the approved drawings, specifications of this tender and directions of engineer in charge. the scope of work also includes installation of cable from fixture to junction box. the scope of work also includes shifting of lighting pole within the cpcl premises to the site as per the direction of engineer in charge. , street light fixtures: the scope of work includes supply of led street light fitting, min. 70w equivalent to crompton model lstp 72 cdl in the existing street light pole. ip66, lumen >100 lm / w, as per the approved makes listed in the tender and necessary mounting accessories, suitablecable glands and support structures, as per the specifications of this tender and directions of engineer in charge. , flp well glass light fixtures: the scope of work includes supply of min. 40w flp well glass led lights of baliga / flexpro / fcg or any other approved makesuitable for mounting with platform poles including supply of suitable flp double compression cable glands, as per drawings and specifications attached with the tender and directions of engineer in charge. , wp well glass light fixtures: the scope of work includes supply of min. 40w wp well glass led lights ofapproved makesuitable for mounting with platform poles including supply of suitable cable glands, as per drawings and specifications attached with the tender and directions of engineer in charge. , flood light fixtures: the scope of work includes supply of min. 100w led flood light equivalent to crompton greaves model, lfln 100 cdl / 60, ip66of approved make, as per the directions of engineer in charge. , flood light fixtures: the scope of work includes supply of 150w led flood light equivalent to crompton greaves model, lfln 150 cdl / 60, ip66of approved make, as per the directions of engineer in charge. , flameproof flood light fixtures:the scope of work includes supply ofmin. 150w led flameproof flood light of baliga / flexpro / fcg or any other approved make including supply of suitable flp double compression cable glands, as per the directions of engineer in charge. , installation oflight fittings: the scope of work includes installation, testing and commissioning of led or conventional bulkhead / well glass fitting / street light fittings / flood light fittings etc, including fixing of control gear, cable glanding, termination and connections in fixtures as per the directions of engineer in charge. , installation upto 6 meters , installation at a height more than 6 meters , removal & relocation of high mast: the scope of work includes the following: a ) dismantling of electrical fittings & cables from high mast and dismantling of high mast from the existing foundation and location b ) construction of foundation for high mast in the new location with suitable foundation bolt according to the existing mast. necessary calculations and drawings for foundation shall be done by the contractor c ) shifting and installation of light fixtures, fixture arangement, mast parts and all other relevant accessories from old location to new location within cpcl premises with all labour and material , as per the approved drawings, specifications of this tender and directions of engineer in charge. , for the above mentioned removal scope , for the above mentioned relocation & installation scope , supply of wp junction box: supply / fabrication of following type dust , vermin proof and weather proof junction / adaptor boxes complete with all fixing hardwares like supports, nuts & bolts, etc including painting.the scope includes all material required to complete the job, as per drawings & specifications of this tender and directions of engineer in charge. , weight of the unit upto 2 kg. , weight of the unit above 2 kg but upto 5 kg. , weight of the unit above 5 kg but upto 10 kg. , supply of flp junction box: supply of following type dust , vermin proof, weather proof and flame proof junction / adaptor boxes complete with all fixing hardwares like supports, nuts & bolts, etc including painting. the number of cable glands holes and cable terminals shall be as per the directions of eic. the scope includes all material required to complete the job, as per drawings & specifications of this tender and directions of engineer in charge. , supply of flp junction box with dimensionupto 420 mm x 420 mm equivalent to type db 31340a in fcg catalogue , supply of flp junction box with dimension above 420 mm x 420 mmto420 mm x 550 mm equivalent to type db 31340ab in fcg catalogue , supply of flp junction box with dimensionupto550 mm x 550 mm ( which are not included in s.no. 2260 and 2270 ) equivalent type to db 31340abs2 in fcg catalogue , civil & structural works , excavation: the scope of work includes excavation of earth for cable laying / laying of gi pipes / earth strip etc., in all types of soil including saturated soil, for a maximum depth of 1.5 m and width approximately 0.5 m, including shoring, shuttering and dewatering ( if necessary it shall be paid separately as per sor ) , backfilling and compacting in layers not exceeding 20 cm thick to the finished ground level, including consolidation and disposal of surplus earth , all complete with labour and tools, as per approved drawings, specifications of this tender and directions of engineer in charge. ( excavated trench dimensions shall be measured ) . , removal of sand from cable trench: the scope of work includes removal of sand from the cable trenchwithout any damage to the cableand disposing it, all complete with labour and tools, as per the specifications of this tender and directions of engineer in charge. , back filling of sand from cable trench: the scope of work includes filling of sand back to trench, all complete with all labour with required tools, as per the specifications of this tender and directions of engineer in charge. , slab removal & relaying: the scope of work includes removal of rcc slabplaced above the cable trench, handlingcarefully without any damage of the slab and cable beneath it and keeping it back in position after laying / removing the cable and sealing the same between rcc covers with cement & sand, including hydra crane ( if required ) , job complete in all respect with labours and tools, as per the specifications of this tender and directions of engineer in charge. , pcc floor cutting: the scope of work includes pcc floor cutting for providing gi conduit laying, earth flat laying, cable laying etc., all complete with labour and tools and the contractor shall carry out the necessary housekeeping in the area as per the specifications of this tender and directions of engineer in charge. , rcc demolishing: the scope of work includes demolishing r.c.c. work for gi pipe laying including stacking of steel bars and disposal of unserviceable material, all complete with labour and tools, as per approved drawings & specifications of this tender and directions of engineer in charge. , dewatering electrical pump: the scope of work includes pumping out of water, including dewatering water mixed with oil / sludge, etc. from cable trenches, depressions etc. by contractors own electrical pump, with cable, labour, hoses, consumables, etc., complete as per the specifications of this tender and directions of engineer in charge. , supply of gi sheet: the scope of work includes supply of gi sheet of 2 mm thick for push button station, field call station, welding receptacle, plant ldb etc as per the the directions of engineer in charge , fabrication & fixing of rainhood for motors: the scope of work includes fabrication and fixing of rainhoods using gi sheet including painting for following rating motors as per the directions of the engineer in charge. , upto 3.7 kw motor , above 5 kw to 18.5 kw , above 18.5 kw to 37 kw , above 37 kw to 55 kw , above 55 kw to 90 kw , above 90 kw to 200 kw , fabrication & fixing of rainhood for miscellenous items: the scope of work includes fabrication and fixing of rainhoods using gi sheet including painting for following miscellaneous items as per the directions of the engineer in charge. , push button stations , welding receptacle , plant ldb , street light jb , telephone / plant communication jb , sfu , structural steel: the scope of work includes supply, fabrication & erection of ms base frames, supports for switchgear, control panels and brackets for miscellaneous electrical equipments, cable tray and cable tray supports out of rolled ms sections, pipe, vertical raceways, plate etc., including welding, bolting, riveting, supply of necessary anchor bolts and grouting, etc., supply & drilling in rcc and fixing of metallic anchor fasteners for supporting cable trays and other miscellaneous switchgear, all complete with labour and materials, as per the specifications of this tender and directions of engineer in charge. , supply , fabrication & erection / installation , supply of paint and applying one coat of anti rust primer and two finished coats of approved synthetic enamel paint for structural steel, all complete with labour, tools and materials, as per the specifications of this tender and directions of engineer in charge. , brick work: the scope of work includes supply and laying of approved 2nd class bricks of thickness 75 mm in cable trench for cable protection as per approved drawings & specifications of this tender and directions of engineer in charge. , chequered plate: the scope of work includes supply, fabrication and installation of 6 mm thick ms chequered plate for covering floor cut outs / cable trenches, etc., including all labour and materials as per approved drawings & specifications of this tender and directions of engineer in charge. , cable markers: the scope of work includes supply and installation of cable markers for under ground cables with 14 swg enamelled steel plate with white letteringon jade green background inclusive of providing and fixingsupports and including all labour and material, as per the specifications of this tender and directions of engineer in charge. , providing and laying plain cement concrete ( pcc ) 1:4:8 by volume ( 1cement : 4 m sand:8 coarse aggregate ) with opc 53 grade and 40mm & down size graded crushed stone aggregates for all depths wherever required like in foundations, fillings , floors, pavements & ramps or any other works etc., including shuttering, tamping, ramming, vibrating, curing, etc. all as specified in any shape, position, thickness and finishing the top surface rough or smooth as specified and directed all complete including cement cost etc, all complete as directed by engineer in charge. , providing and laying of reinforced cement concrete ( rcc ) 1:1.5:3 by volume ( 1cement: 1.5 m sand:3 aggregate ) with opc 53 grade and 20mm and down size graded crushed stone aggregate materials for sub structure upto plinth beam levelfor all depths including pavement, machine mixing, curing, consolidating with vibrator, cement cost etcall complete as per instructions of engineer in charge excluding cost of shuttering and reinforcement. , dismantling: , dismantling of switch & sockets: the scope of work includes disconnection and dismantling of all types of switches, sockets and plug points without damage and returning them to our stores or any other place or site within the premises as decided by the engineer in charge, all complete with labour and tools , as per the specifications of this tender and directions of the engineer in charge. , dismantling of trays: the scope of work includes dismantling of following sizes of slotted / ladder type gi cable trays along with straight length elbows, tees, crosses, couplers plates etc., including, cutting, grinding and any other jobs required to dismantle, without any damage and returning it to stores or any other place or site within premises, all complete with labour and tools, as per the specifications of this tender and directions of the engineer in charge. , width upto 300 mm , width above 300 mmbut upto 600 mm , width above 600 mmbut upto 800 mm , dismantling of electrical wiring: the scope of work includes dismantling of electrical wiring ( comprising of single or twin core pvc wires upto 6 sq.mmand single earth wire upto swg ) along with its connected accessories including conduits , casings etc, as per the specifications of this tender and directions of engineer in charge. , dismantling of electrical flp / wp fittings: the scope of work includes disconnection and dismantling of surface / channel / wall / steel structures mounted wp / flp type fittings such as lighting fixtures, push button stations / motor control stations, junction boxes, welding sockets, lighting panels convenience outlets / convenience outlets with built in transformer etc. all complete without damage and returning them to cpcl stores or any other place or site within the premises, including dismantling of any supports, poles, frames or any other structures related to the fittings, as per the specifications of this tender and directions of engineer in charge. , weight of the unit upto 2 kg. , weight of the unit above 2 kg but upto 5 kg , weight of the unit above 5 kg but upto 10 kg , weight of the unit above 10 kg but upto 20 kg , dismantling of platform lighting poles: the scope of work includes disconnection and dismantling of platform light poles ( upto 3 metres height ) along with fittings and shifting it to the stores or to a new location including disconnection of power cable, removal of lighting fixtures and jbs without damage with all labour and tools and as per the specifications of this tender and directions of engineer in charge. , dismantling of street lighting poles: the scope of work includes disconnection and dismantling of street light poles along with fittings and shifting it to the stores or to a new location including disconnection of power cable , dismantling of foundation, excavation, removal of lighting fixtures and jbs without damage with all labour and material and as per the specifications of this tender and directions of engineer in charge. the scope of work includes arranging of necessary heavy duty vehicles like crane, tractor and trailer etc. as required. , dismantling of ht / lt switchgear ( 6.6 kv / 415 v ) : the scope of work includes dismantling of ht panels, lt panels, ups or any other panels as given below, ( i ) including electrical isolation ( i.e. ) disconnection of ht / lt / control cables and deglandingby competent personnel from connected lines ( under the supervision of valid licensed person ) , ( ii ) removal of copper / aluminium bus bars ( both horizontal and vertical ) in the ht / lt panel, ( iii ) removal of all switchgear components like cts, pts, fuses, mcbs, switches, bus bar supports ( insulators ) , relays, terminal boxes, selector switches, transducers, meters, indication lamps, interconnecting wires, nuts, bolts etc. from the dismantled panels. ( iv ) the scope includes dismantling job pretaining to 6.6kv / 415 breakers and shifting to any location within cpcl premises using contractor’s own equipments, tools, tackles, consumables and laboursas per the specification of this tender and directions of engineer in charge. tractor with trailor and hydra charges shall be paid as per the sor based on usage. note: each indicates one feeder and its cable chamber , weight upto 100 kg , above 100 kg upto 500 kg , above 500 kg upto 1000 kg , above 1000 kg upto 1500 kg , dismantling of ht softstarter ( 6.6 kv ) : the scope of work includes dismantling of ht softstarter of weight upto 3500 kg as given below, ( i ) including electrical isolation ( i.e. ) disconnection of ht / lt / control cables and deglandingby competent personnel from connected lines ( under the supervision of valid licensed person ) , ( ii ) removal of copper / aluminium bus bars in thepanel, ( iii ) removal of all switchgear components like cts, pts, fuses, mcbs, switches, bus bar supports ( insulators ) , relays, terminal boxes, selector switches, transducers, meters, indication lamps, interconnecting wires, nuts, bolts etc. from the dismantled panels. ( iv ) the scope includes dismastling job pretaining to 6.6kv breakers. within cpcl premises using contractor’s own equipments, tools, tackles, consumables and laboursas per the specification of this tender and directions of engineer in charge. the scope shall also include shifting of panel from substation to any other place inside the cpcl premises with all neccessary vehicles like tractor trailor, hydra, crane etc and manpower as per the requirements. , dismantling of structures: the scope of work includes dismantling of any support structures at ground level. the scope of work includes removal of structures from the ground support by welding / cutting, all complete with labour and tools, as per the specifications of this tender and directions of engineer in charge. , stencilling:the scope of work includes stencilling of letters / numbers on panels, cable drums etc., as per the directions of engineer in charge including all labour and materials. , letter / number of size up to 2 , letter / number of size above 2 to 4 , letter / number of size above 4 to 6 , dismantling of cables: the scope of work includes dismantling / pulling out the lt / ht, pvc / xlpe, power / control / telephone / computer, armoured / unarmoured cables of various voltage grades / types / sizes / makes from the trench ( upto 1.5 metres deep ) / pipes / structures / racks or trays, all complete with labour and tools. the scope also includes disconnection, deglanding, declamping of cables ( if required ) as per the directions of engineer in charge. , overall diameter upto 35 mm , overall diameter above 35 mm but upto 55 mm , overall diameter above 55 mm but upto 75 mm , overall diameter above 75 mm , cable dismantling and relaying:cable dismantling / pulling out of lt / ht, pvc / xlpe power / control / telephone / computer , armoured / unarmoured cables of various volatge grades / sizes from trench / pipes / structures / racks or trays and declamping, rerouting and relaying of cable for reglanding etc. as per the directions of engineer in charge. for 2c, 3c, 4c cables below rates of 3.5c cables will be applicable , all lv control cables and lv power cables upto 3.5c x25 sq.mm , lv power cables above 3.5c x 25 sq.mm upto 3.5c x 95 sq.mm , lv power cables above 3.5c x 95 sq.mm upto 3.5c x 185 sq.mm , lv power cables above 3.5c x 185 sq.mm upto 3.5c x 300 sq.mm , single core lv power cable upto 1000 sq.mm , single core ht cable upto 1000 sq.mm , ht cables from 3c x 120 sq.mm upto 3c x 185 sq.mm , ht cables from 3c x 240 sq.mm upto 3c x 300 sq.mm , retrieving of cables: the scope of work includes uncoiling of cables from damaged cable drums / retreiving of cables from broken drums / scrap, without causing any damage to the cables, all complete with labour and accessories required for the job, as per the specifications of this tender and directions of engineer in charge. job also includes disposal of the broken drums. necessary crane, tractor with trailer shall be arranged by the contractor. , overall diameter upto 25 mm , overall diameter above 25 mm but upto 35 mm , overall diameter above 35 mm but upto 45 mm , overall diameter above 45 mm but upto 55 mm , overall diameter above 55 mm but upto 75 mm , re rolling of healthy cables: the scope of work includes re rolling of healthy loose cables onto cable drums / empty drums, measuring and marking the length, providing end caps etc. without causing any damage to the cables and drums, all complete with labour and accessories required for the job, as per the specifications of this tender and directions of engineer in charge. ( cable drums will be provided by cpcl ) , overall diameter upto 25 mm , overall diameter above 25 mm but upto 35 mm , overall diameter above 35 mm but upto 45 mm , overall diameter above 45 mm but upto 55 mm , overall diameter above 55 mm but upto 75 mm , cable dressing:the scope of work includes cable dressing in trays, structures / channels / walls etc. dressing of cables shall be done with suitable clamps, fasteners of gi or aluminium at an uniform interval of 1 metre with all labour and materials, as per the instructions of eic , cable trays upto 150 mm wide , cable trays 300 mm to 450 mm wide , cable trays above 450 mm to 600 mm wide , cable trays above 600 mm to 750 mm , hiring of heavy duty vehicles , the scope of work includes hiring of 20 feet trailer with tractor ( on daily basis ) on workingdays on 8hrs shift, inclusive of driver, one assistant, consumables like diesel etc., with all safety instruments as per the specifications of this tender and directions of engineer in charge. all required tools, tackles, wire ropes, pulley blocks, belts, chains etc., for lifting, aligning, tying, stacking shall be arranged by contractor. 1vehicle day = 1 vehicle x 1 day ( 8hrs ) . , the scope of work includes hiring of 12t hydra ( escorts make f 17 model or equivalent ) on daily basis on working days on 8hrs shiift, inclusive of driver, one assistant, consumables like diesel etc., with all safety instrumentsas per the specifications of this tender and directions of engineer in charge. all required tools, tackles, wire ropes, pulley blocks, belts, chains etc., for lifting, aligning, tying, stacking shall be arranged by contractor. 1vehicle day = 1 vehicle x 1 day ( 8hrs ) . , manpower assistance: the scope of work includes supply of labour classified under the following categories as and when required, as per the specifications of this tender and directions of engineer in charge. , full day work , highly skilled , skilled , semi skilled , unskilled , over time work , highly skilled , skilled , semi skilled , unskilled , supply of inverter air conditioning unit: the scope of work includes supply of minimum 3 star inverter split air conditioning units of following tonnage of any approved make including any other hardwares and consumables required forcomplete installation as per specifications of this tender and directions of engineer in charge. , 1.5 tonnes , 2 tonnes , installation of air conditioning unit: the scope of work includes installation ofinverter or split air conditioning units with all related accessories as per specifications of this tender and directions of engineer in charge. , 1.5 tonnes , 2 tonnes , supply & installation of stabilizers: the scope of work includes supply , installation and commissioning of voltage stabilizers of below mentioned ratings of v guard or equivalent approved make, for ac unitsas per specifications of this tender and directions of engineer in charge. , 4 kva for 1.5 ton inverter ac , 5 kva for 2 ton inverter ac , ac repair & miscellaneous works: . , supply and fixing of stand for outdoor units of 1 / 1.5 / 2 ton split ac , supply and fixing of copper tube size 3 / 4 and 3 / 8 ( soft pipe ) for ac unit , the scope of work includes removal of window / split ac units as perscope of work and as per direction of engineer in charge , cost towards healthiness checking of ac unit ( window / split ac ) , gas charging of 1 / 1.5 / 2 ton split ac including all materials, labour and tools as per the directions of engineer in charge , supply, installation / commissioning of cassette unit: the scope of work includes supply, installation of indoor, factory assembled, cassette type air conditioning unit, rotary / scroll compressors, evaporator, remote air cooled condenser coil ( outdoor unit ) , refrigeration components, thermostats, controls, diagnostics, safety devices, accessories and suitable for operation in high ambient temperatures ( upto 115 deg f ) and coastal environments; indoor and outdoor units shall be factory pressure tested, run tested and supplied inclusive of full operating charge of gas.the capacity as follows. supply and installation shall be as per the specifications of this tender and directions of engineer in charge. , supply of 1.5 tr cassette type air conditioner , supply of 2.0 tr cassette type air conditioner , installation / commissioning of 1.5 tr cassette type air conditioner , installation / commissioning of 2.0 tr cassette type air conditioner , fire proof coating of cables , supply of hilti or equivalent make indoor application fire proof paint for 40 minutes fire retardant capacity for all cables cp678 ( weight of 20 kgs each box ) , supply of hilti or equivalentmake outdoor application fire proof paint for 40 minutes fire retardant capacity for all cables cp679a ( weight of 20 kgs each box ) , applying of fire proof paint over cables as per the directions of engineer in charge inclusive of all consumables & labour required , supply of meters / transformer : the scope of work includes supply of following type of meters / transformers as per approved vendor list, specifications of this tender and directions of engineer in charge: , three phase multifunction meter, ac 110v, 230v, 440 v ( make: rishab / schneider / conzerv / equivalent ) , programmable multifunction transducer ( rishabh m40 or equivalent ) , aux. supply: 85 230v ac / dc , analogue ammeter ( ae / rishab / schneider / meco / equivalent ) , analogue voltmeter ( ae / rishab / schneider / meco / equivalent ) , ht panel testing and commissioning: the scope of work shall include arrangement of manpower along with all tools, consumables & testing equipments to site for ( a ) carrying out secondary injection testing of protection relays ( b ) injection testing of 6.6kv current transformers ( c ) ht breaker servicing & testing including buffer replacement, measuring of crm, closing / tripping time etc ( d ) panel wiring checks including retermination, dressing as required the scope of work also includes submission of test reports and as built drawings as per the specification of tender and engineer in charge , differential stability test: the scope of work includes carrying out differential stability test for transformers, cables, ht busincluding supply of manpower along with all tools & testing equipments, as per the directions of engineer in charge . the scope of work also includes submission of test reports and as built drawings , lt panel testing and commissioning ( breaker feeder ) : the scope of work shall include arrangement of manpower along with all tools, consumables & testing equipments to site for ( a ) carrying out secondary injection testing of protection relays ( b ) injection testing of 415 v current transformers ( c ) measurement of ir values ( d ) lt breaker servicing & testing including buffer replacement, measuring of crm, closing / tripping time etc ( e ) panel wiring checks including retermination, dressing as required the scope of work also includes submission of test report and as built drawings as per the specification of tender and engineer in charge , lt panel testing and commissioning ( contactor feeder ) : the scope of work shall include arrangement of manpower along with all tools, consumables & testing equipments for ( a ) carrying out secondary injection testing of protection relays ( b ) injection testing of 415 v current transformers ( c ) measurement of ir values ( d ) panel wiring checks including retermination, dressing as required the scope of work also includes submission of test report and as built drawings as per the specification of tender and engineer in charge , transformer testing: the scope of work includes testing of transformers including all labour and materials, as per the specifications of this tender and directions of engineer in charge and shall submit the test reports. testing of transformer shall include the following test as a minimum requirement: *transformer winding resistance measurement *transformer ratio test *checking various alarms and trips *testing of the bucholz relay *oil breakdown voltage testing *measurement of insulation resistance *dielectric tests of transformer *tests on on load / off load tap changer *oil pressure test on transformer to check against leakages past joints and gaskets , cable hipot testing: the scope of work shall include arrangement of manpower along with all tools, consumables & testing equipments for cable hipot testing of 6.6 kv cables and submission of test reports as per the direction of engineer in charge. each shall indicate each cable. , numerical relay testing: the scope of work shall include arrangement of manpower along with all tools, consumables & testing equipments for numerical relay testing . the scope also includes submission of test reports as per the directions of engineer in charge.the scope of work shall include arrangement of manpower along with all tools, consumables & testing equipments , ht breaker testing :the scope of work includes ht breaker testing includingmeasuring of crm, closing / tripping time etc all complete with labour and materials as per the directions of engineer in charge. the scope of work shall include arrangement of manpower along with all tools & testing equipments. , lt breaker testing :the scope of work includes lt breaker testing includingmeasuring of crm, closing / tripping time etc all complete with labour and materials as per the directions of engineer in charge. the scope of work shall include arrangement of manpower along with all tools & testing equipments. , ht breaker servicing :the scope of work includes ht breaker servicing includingbuffer replacement all complete with labour and materials as per the directions of engineer in charge. the scope of work shall include arrangement of manpower along with all tools. , lt breaker servicing :the scope of work includes lt breaker servicing includingbuffer replacement all complete with labour and materials as per the directions of engineer in charge. the scope of work shall include arrangement of manpower along with all tools. , the scope of work includes supply and installation of zip type heat shrinkable outer sleeves for 6.6 kv / 11kv cables as per the details below, specifications of this tender and directions of engineer in charge: , overall diameter above 40mm upto 110mm, standard length 965mm , overall diameter above 57mm upto 145mm, standard length 1100mm , the scope of work includes supply of self amalgamating ht tapes of scapa or equivalent make, as per the directions of engineer in charge , rubber mat: the scope of work includes supply and laying of 900 mm wide safety insulation mats complying to is 15652, of following grades required for maintenance of electrical equipment in substation, including cutting to required shape in running length, including all labour and materials, as per applicable indian or international standards and cea guidelines and as per directions of engineer in charge. , 3.3 kv grade. , 11 kv grade. , the scope of work includes supply of following eqiupments as per approved vendor list, specifications of this tender and directions of engineer in charge: , led indication lamps, wide band ( 24 240v ac / dc ) , siemens / l&t / teknic / equivalent make , local / remote selector switch of salzer / kaycee / equivalent make , the scope of work includes supply of fm1 / quartz time switch 240v ac base / din mounting as per the specification of this tender and engineer in charge , the scope of work includes supply of digital time switch 240v ac base / din mounting as per the specification of this tender and engineer in charge , erection and dismantling of steel scaffolding:erection and dismantling of steel scaffolding at the required locations as directed by engineer in charge ( e.i.c ) using supply of 1.5 dia steel tubular pipes with suitable clamping arrangement, providing steel gratings at the required locations firmly tied on to the scaffolding pipes and to the satisfaction of e.i.c and removal / dismantling of the steel scaffolding materials on completion of the job. the job also includes supply of scaffolding materials, all types of tools andtackles, lifting arrangements like chain pulley blocks, all consumables and required labour to complete the job in all respects, including transportation of materials and steel gratings up to the work site. , erection and dismantling upto 5 meters height of scaffolding , erection and dismantling above 5 meters upto 10 meters height of scaffolding , erection and dismantling above 10 meters upto 20 meters height of scaffolding , shifting of package substation: the scope of work includes dismantling, shifting and re installation of existing package substationincluding all labour and tools, as per the specifications of this tender and directions of engineer in charge. the scope includes arranging of necessary crane, tractor, trailor, slings etc.by the contractor but excludes civil jobs for re installation. , supply of transformer oil : the scope of work includes the supply of transformer oil as per is 335 standard. routine and type test certificate shall be submitted along with supply of transformer oil , transformer oil filtration: the scope of work includes charges for transformer oil filtration per litre per circulation as per the tender document. the scope also includes testing of initial and final ( after filtration ) breakdown values bdv of transformer oil, transportation charges for filter machine etc. ( cost shall be inclusive of vehicle transportation charges, retention charges ( if any ) ) , supply of wp cable gland: the scope of work includes supply of weather proof cable glands as per the specifications of this tender and directions of engineer in charge. , overall diameter upto 19 mm ( 0.75 inch ) , overall diameter above 19 mm but upto 25 mm ( 1.0 inch ) , overall diameter above 25 mm but upto 32 mm ( 1.25 inch ) , overall diameter above 32 mm but upto 38 mm ( 1.5 inch ) , overall diameter above 38 mm but upto 51 mm ( 2.0 inch ) , overall diameter above 51 mm but upto 64 mm ( 2.5 inch ) , overall diameter above 64 mm but upto 76 mm ( 3.0 inch ) , supply of flp cable gland: the scope of work includes supply of double compression flameproof cable glands as per the specifications of this tender and directions of engineer in charge. , overall diameter upto 19 mm ( 0.75 inch ) , overall diameter above 19 mm but upto 25 mm ( 1.0 inch ) , overall diameter above 25 mm but upto 32 mm ( 1.25 inch ) , overall diameter above 32 mm but upto 38 mm ( 1.5 inch ) , overall diameter above 38 mm but upto 51 mm ( 2.0 inch ) , overall diameter above 51 mm but upto 64 mm ( 2.5 inch ) , overall diameter above 64 mm but upto 76 mm ( 3.0 inch ) , supply of monobloc pumps: the scope of work includes the supply of monobloc pumps of 1 hp along with required accessories as per the specification of this tender and directions of engineer in charge , supply of trefoil clamp: the scope of work includes the supply of trefoil clamp along with required accessories as per the specification of this tender and directions of engineer in charge , supply of flexible cables: the scope of work includes supply of unarmoured flexible copper cable, pvc insulated as per the specifications of this tender and directions of engineer in charge. , 3c x 1.5 sq.mm , 3c x 2.5 sq.mm , 4c x 2.5 sq.mm , 4c x 4 sq.mm , 4c x 6 sq.mm , supply of ladder: the scope of work includes supply of min. 8 feet frp ladder as per the specification of this tender and directions of engineer in charge , supply of distillation water unit: the scope of work includes supply of distilled water still with three heaters, heater details: 6 kw, 230 v, capacity : 8 litres / hr , servicing of ht megger: the scope of work includes servicing of ht megger with necessary parts and battery replacement as per the specification of this tender and directions of engineer in charge , shifting of scrap / miscellaneous items: the scope of work includes shifting of scrap / miscellaneous items anywhere within cpcl premises, all complete with labour and tools, as per the specifications of this tender and directions of engineer in charge. => limited...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33172037 tender for works contract for “hvds implementation of 22 kv idaikattur feeder @ 110 / 22 kv manamadurai ss underrdss” 1 for pole above 8.00m length by using jcb / manual 2 excavation of stay pit of 4.5 to 5 depth using jcb / manual 3 erection of rcc, rec, psc poles above 8.00m length by using crane / manual 4 erection of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. 5 erection of 22 kv single pole structure including erection of dt complete with centre support 6 v cross arm4.5 feet 7 fixing of lt 3 phase cross arm 8 fixing of ht disc insulator with pin 22 kv 9 fixing of lt pin insulator 10 fixing of two tapping cross arm per cut point upto 33 kv line including fixing of discs, insulators and jumpering etc.. 11 fixing of shackle 12 fixing of ht / lt ti fitting 13 fixing of aluminium knob 14 fixing of ht las ( 3 nos. ) 15 fixing of lt las ( 3 nos. ) 16 fixing of ht pin insulator with pin 22 kv 17 paving and stringing of conductors ofabove7 / 2.59 mm acsr or other equivalent conductor upto 7 / 3.35mm acsr or other equivalent conductor 18 paving and stringing of conductors of7 / 4.09mm acsr or other equivalent conductor 19 erection of distribution transformer structure complete as per tneb standard including painting, feeders arrangrment, colour washing of rcc poles etc.. fixing of poles type to be unit ht / lt las and jumpering 3 nos earth pits with earth trough except erection of distribution transformer. 20 ( ii ) above 25 kva to 100 kva 21 loading / unloading of lt pin insulator shackle, guy shackle, lt pin, metal parts, ht pin etc., 22 un loading of stay plate 23 loading of stay plate 24 un loading of base plate 25 loading of baseplate 26 leveling 27 tree cutting 28 transportation of all type of poles by bullock cart or other vehicle ( for all sizes of poles including loading and unloading ) upto 1 km 29 loading / unloading of 22kv strain disc 30 loading / unloading of line materials 31 unloading of conductor 32 loading of conductor 33 loading or unloading of distribution transformerupto 100 kva 34 split neutral 35 ( i ) for a lead upto 5 km 36 ( i ) transporting of distribution transformer / line materials from stores to office / site upto 10 km distance by engaging 1 ton capacity minidor ( lorry ) 37 painting of distribution transformer of all capacities ( paint to be supplied by the board ) including cleaning of dt 38 numbering of poles including base painting and with cost of paint 39 painting of cement poles by distember coating including cost of distember 40 painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details ( items 1 to 6 brush to be owned by the contractor ) ( paint to be supplied by department ) 41 transporting of conductors of all sizes from road side to pit locations upto one km of conductor 42 ( ii ) above 5 km of lead of every km 43 ( ii ) all rec, rcc pole above 8.00 m length 44 erection of metal supports above 9m / rsj / rail pole / tubular poles 45 ( i ) earthing of poles with gi wires 4 or 6 swg by coil earthing 46 ( iii ) stay concreting 47 ( ii ) sleeveconcreting 48 ( i ) mass concreting of poles 49 ( i ) flat guarding with earth pit 50 pipie earthing including excavation of earth pit and fixing earth pipe 3 m length 51 set right of all sizes of leaning poles...

Bharat Heavy Electricals Limited - Tamil Nadu

33114358 bhel / trichy invites applications for regd. from suppliers / manufacturers for supply of various items bhel trichy cast: aluminium, astm a 217 c12a castings, cast iron castings for windbox, feeder, coal nozzles ( sg iron castings up 850 kgs ) , castings for oil field equipments: carbon, alloy and stainless steel qcnrv castings, hemi spehrical dished ends ¿ grade hemi spehrical dished ends ¿ alloy steel upto gr 22 ) , die forgings for oil field equipments:, carbon, alloy and stainless steel, open forgings f91, f92, f92 forgings, closed die forged components forged finned elbow, forged flanges, formed fittings: large 12 and above, forged finned elbows, formed fittings: small 2 to <12 socket welded forged fittings, open forgings carbon, alloy and stainless steel except sa 182 f91, inconal fittings, inconel forgings for valves , investment castings for connectors, windbox sa 351 gr ch 20, sa 351 ck 20, investment castings, castings: malleable iron nickel based castings, non ferrous castings for feeder: is 617 4223, is 617 4450, is 305 gr ab1, astm b 148 gr 9c, non ferrous castings ( 0.5 to 200 kg ) open forgings for oil field, equipments: carbon, alloy and stainless steel, open forgings for hp bypass valves: carbon and alloy steel, formed fittings p91, f92 fittings, steel castings, sg iron machined castings for coal, nozzles, split collar for wind box: astm a 536 gr 654512 sg iron castings, close die forgings: carbon, alloy and stainless steel, open forgings for valves, carbon steel, alloy steel and stainless steel castings for valves name plate metallic, , , fasteners: hsfg bolts and nuts as per tdc:5:211 / 01, , precsn bolts, studs, screws and nuts dip coat paint, thinner and special additive, h.r. aluminium paints grade i h.r. aluminium paints grade ii , conventional paints and thinners, epoxy based paints and thinners, epoxy finish paints and thinners, special primer paints and thinners seamles p91 / p92 pipes, alloy steel pipes: sa 335 p11, p12, p22, od 88.9 to 1016 mm, 6.02 to 135 mm thick carbon steel pipes: sa106 gr b, c; od, 88.9 to 1016 mm, 6.02 to 135 mm thick pipes & tubes ( welded stainless steel, erw / saw pipes : api 5l gr b, od 219.1 to 1168 mm, 4 to 14.3 mm thick, erw black pipes: is 1239, nb 80 to nb 150, light, medium and heavy thick, seamles p91 / p92 pipe alloy steel pipes: sa 335 p11, p12, p22 od 88.9 to 1016 mm, 6.02 to 135 mm thick, carbon steel pipes: sa106 gr b, c; od 88.9 to 1016 mm, 6.02 to 135 mm thick, alloy steel rounds for valves:, 21crmov57, sa 193 b7, a322 gr 6150, sa 193 b16, sa 182 f22 cl3, aisi 4140, aisi 1040, : dia 22 mm to 300 mm, brass sheets, 0.2 mm and 1.0 mm thick, 17% gr. ss ( othron steel ) rods, astm a182 f430, dia 25 mm to 200 mm, special alloy steel rods for hplp valves alloy steel plates to grade sa387 gr91 cl alloy steel rounds to grade sa182 f91, stain l ess steel rods, dia 25 mm to 250 mm of different specs including sa 182 f304, sa 479 304, sa 182 f316, a276 410, , aisi 410, a582 416, a276 420, a565 616, sa 564 630, a182 f6a cl3, 17 4 ph, special stainless steel rounds: x 19 cr mo vn bn 111 6010 dia 52mm, 56 mm and 125 mm, alloy steel rounds / blooms, alloy steel plates: sa 387 gr 12 cl 2, gr 22, gr 91 4 mm to 120 mm thick., alloy steel rounds: sa 182 f12, f22, sa193 b7, b16, astma600t4 dia 6 mm 200 mm, carbon steel plates boiler quality ( sa299 gr a ) 65 mm to 190 mm thick, carbon steel plates boiler quality ( sa515 gr 70 ) 5 mm, 6 mm, 63 mm to mm thick, carbon steel rounds / blooms, structural quality plates bsen 10025 3 / s420n, a36 75 mm to 155 mm thick, structural quality plates carbon steel is 2062 e250 gr a, b / is 513 osk, and dsk / is 1079 0.9 mm to 63 mm thick corsn resi. steel sheets and plates , , astm a 588 gr a, corten a, jis 3125 2.5 mm to 5.0 mm thick angle, channel, beams heavy section ( a 130 200 mm, b 400 600 mm and c 300 ? 400 mm ) , angle, channel, beams light section ( a 40 65 mm, b 125 200 mm and c 75 ? 100 mm ) , angle, channel, beams medium section 75 100 mm, b 250 350 mm and c 200 ? mm ) , parallel flange beam / u beam / h beam 150 mm to 700 mm, carbon steel boiler quality rounds: sa 105 20 mm to 200 mm dia, . carbon steel rounds: is 2062, is 1875 4 8 mm to 100 mm dia. stainless steel sheets and plates: sa 240 tp 300, 400 series 0.6 mm to 50 mm thick, stainless steel rounds: sa 479 tp 300, 400 series, sa 182f316 6mm to 100 mm dia., tmt bars dia 8 mm to 40 mm weld stud / ferrules, ifm gas ignitor, 0.25 kw heat capacity, length of ignitor 900 to 1265mm, 110 v / 240 v, ac, regulating duty electrical actuator ( for dampers ) , transmitter ( pressure / flow / temp ) actuator: pneumatic ( open / close type ) , regulating duty pneumatic actuator ( for dampers ) proximity switch , bdt / tubular level gauges, electrical accessories for valves, fractional hp motor for soot blowers, panels: plc based control system, cast aluminium junction box ( non flame proof ) , compensating / extension cable, cable dressing materials, mpgfc cpu, brass cable gland and cable gland adapter, gi perforated / ladder type cable tray cable tags, cable lugs, pvc insulated copper control cable frls ) , pvc insulated multipair instrumentation cable ( frls ) , frp junction box, flame scanner head assy ( safe flame ) , flame scanner cable, thermoplastic / elastomeric / equiv alent, material insulated double shielded copper, instrumentation cable ) , flame scanner assy ( industrial boilers ) , flame scanner head assy test kit flame scanner head electronics, mpgfc i / o modules / mp based gr. feder control, mpgfc kbd and ps / mp based gfc key, board and power supply, bhelfeed20s modules, electrical panels: ac / dc distibution, ptfe insulated and outer sheathed, extension cables, mpgfc rack, pcb and accessories, vfd controller, wired modular panel local control, panel, weighing module, wired modular panel remote , control panel, airfilter regulator, sheet steel junction boxes, starter / cntrl boxes: dc and ac local starter / mill fire, flame proof boxes ( cast aluminium ) galvanized sheet junction box, electrical actuator, motor control centre / power control centre stainless steel junction boxes, ash level switch, , acoustic pyrometer, modular type cabinet, bottom ash load cell bhelvision: electrical accessories, cctv system for furnace flame, viewing, gravimetric feeder control modules electronic modules for flame scanner system, electronic modules for acoustic, steam leak detection ( asld ) system electronic modules for electronic, water level indicator ( ewli ) , pressure switch for electromatic releif valve, electronic water level indicators fluegas analyzers ( dilution probe ) flue gas analyzers, smoke density: opacity / particulate measurements fluegas analyzers: oxygen measurement at boiler eco. inlet fluegas analyzers: sox / nox hot extraction type flow nozzles furnace flame viewing camera system and thermographic analysis system dp gauges pressure gauges temperature gauges signal isolator ( i / p converter ) local instrument enclosure passenger and goods elevator local instrument rack mass flow meter metal temperature measurement thermocouple process thermocouples and rtds with thermowell orifice plate assy purge meter ptfe insulated multipair instrumentation cable erv controller and control station steam and water analysers online carbon in ash analyser system vibration monitoring system for motor / fan bearing xlpe insulated lt power cable ( copper and aluminium ) coal motion monitor sensor cable assembly digital tachometer feeder belt motors: weather proof / flame proof panels for feeder integral cabinet fibre optic cable and lens barrel assy. calibration kit for solid state feeders copper / ss tube for instrumentation application decibel scanner unit with pc and software for asld system micro switch for gravimetric feeder pressure and dp swithces pressure gauges critical application pressure switches position transmitter for quick closing non return valves electrical control panel for soot blowers limit switches push button station, boxes etc for soot blowers solenoid for electromatic relief valves solenoid for hp bypass valves sonic tube assy and sensor housing drum saddle slide bearing plate: ptfe slide bearing on one side and the mirror polished ss sheet on the other side. load bearing capacity upto 200 kg / mm2 soot blower pressure reducing valve fuel oil control and trip valves control valve: high pressure steam application gun metal valve hp fill and purge filter assembly intrascope nitrogen blanket system high pressure startup control valve direct water level gauge refractory for cfbc boiler ceramic wool castable / crushed refractory insulation: calcium silicate slab / block / pipe electro forged floor grills long span fire bricks wool mattress / rtd / pipe section pourable insulation sealing compound ss wiremesh rope woven wire cloth stainless steel steel glazed windows cd. plated / galvanised fasteners pre painted galvanised sheets for boiler roof hea ignitor assy ( oil / gas ) solenoid valves ball valves ( fire safe design ) trip valves strainers: simplex goggle valve high pressure hoses ( dynamic pressure of 200 bar, static pressure of 290 bar, proof test pressure of 552 bar max, bursting pressure of 1103 bar max ) isolation valves / knife edge gate valves light duty limit switches gear pump with motor ( drain oil ) self actuating valves sump pump motor assembly speed regulator steam trap y type strainers neoprene hoses mill seal air filter assembly oil accumalator ( fuel oil ) actuator: elec. open / close ( damper / gates ) scanner air fan ( with dc motor / ac motor ) scanner air filter elements dynamic shaft seals ss flexible hoses graphite alloy damper bearing and bushings 400 deg c operation butterfly valves ( wafer design ) drag link chain feeder gaskets for coupling rockwell / sleeve couplings variable orifice victaulic / pipe couplings heat resistent glass ( pyrex glass dia 109mm, 5 mm thick, violet / light colour to withstand 500 deg c ) metallic expansion bellows non metallic expansion joints slide bearing plates teflon slide bearing plate gravimetric feeder assembly solenoid valve ( boi ) boiler circulating water pumps gravimetric feeder components frp cable trays instrument fittings: brass / ss double compression fittings, cs / as welded fittings, gi threaded fittings teflon hose ( ss braided, flexible ) furnace maintenance platform handling equipment: electrically operated trolly with hoists handling equipment: manually operated mobile platform quick errect scaffolding ( aluminium ) quick erect scaffolding system steel actuator for full bore valve pneumatic actuators for quick closing non return valves airset ( mech ) / air filter / regulator anti seize : spray lubricant head pulley bush bearings coal valves clad roller brg. assy strainers: duplex feeder components assembly fittings like male stud olive coupling / elbow / tee, bleeded plug, bulk head union feeder light fittings gaskets gasket eliminator / sealant fuel oil ( triple screw pump ) springs link chains o rings oil seals plug valves metallic seated high pressure rubber hoses sintered flange bronze bushes slip on pipe coupling ss spiral wound gasket tadpole tape fully built electric bus supply of power assisted safety valves special bearing for oil field equipment isolating ball valves pneumatic actuated full valves boiler water recirculating pump chains for soot blowers sdm: fully machined ofe castings machined components for valves zinc and xylan coated fasteners for oil field equipment plc panels for soot blower corrugated al sheet air / oil cylinder for quick closing nrv sdm:kgv:elastomers elastomers for oil field equipment sdm: 12 point cap screw flow bean for oil field equpment feed back transmiter high pressure filter circlips for feeders glass globe / light fitting for feeder fabricator metal component gear box and clean out conveyor drive gear box with motor for soot blowers gear box for valves special glass for water level gauge accumulatars accessories hp bypass system high tensile fasteners limit switch boxes premium threaded ( fox, acme, vamtop, etc., ) body hanger and adaptors non asbestos packings non metallic end covers drive belts pulleys for temperature probe o rings and oil seals aluminium sheet: plain / corrugated air cylinder open / close, retractor assembly special packing set for full bore valves limit switches for quick closing nrv ring joint gasket ( api ) ultrasonic digital thickness gauges with accessories sintered bronze bush soft iron gaskets and sealing rings silencers for safety valves swagelock fittings coil springs for safety valves coil springs for safety valves with ibr tc special tools for oil field equipments anhydrous ammonia hose agitator for waste ammonia dilution system ammonia injection skid butterfly valves for dilution air and ammonia injection system dilution air fan & motor assembly including filter de dusting system dosing tank & pumping system dilution air heater ( electrical ) expansion bellows emergency eye wash & safety shower frp grating hydraulic jack for scr cart ammonia injection control valve ammonia knife edge gate valve anhydrous ammonia pump skid dilution air heater ( steam ) & accessories spray nozzle for spraying sealing rings, retainer rings, drive screws safety selector for tank relief valve spray water self regulating valve fibre glass tadpole tape ammonia trip valves ( ball type, manual, pneumatic & electrical ) anhydrous ammonia truck unloading skid wind indicator water level gauge rings and washers excess flow valves & check valves tunguston carbide balls, bearings, etc for ofe ( oil field equipment ) spiral wound gaskets oil supply unit for hp bypass system teflon o rings, packing rings etc. accumulator manifold keys, pins, washers etc. valve diaphragm actuator valves elec actuators hydraulic actuators & accessories hydraulic power unit proportional valve valves special ( iq ) actuators throttle device for hydraulic power unit washers and circlips coated abbrasives adaptors api gauges te abrasives polytap hss circular saw bi metal band saw blades te boring, facing head bta tools carbide burrs carbide tipped circular saw disc slitting wheels thread gauges grinding wheels shelf life grinding wheels hss cutting tools carbide cutting tools hacksaw blades high q carbide cutting tools measurnig instruments letter and number punchs special cutters spade drills stellite turning inserts spiral fluted tap symmetrical carbide drills threading taps threading tools tube expanders wrenches indexable carbide drills vdi holders zircon belts alloy steel flats carbon steel strips tubes: erw black is 1161 yst 240 and bsen 10305 alloy steel tubes: sa 213 t11 / t12 / t22 / t23 / t91 / t92 boiler quality carbon steel tubes: sa 210 gr c , sa210 gra1, sa192 boiler quality stainless steel tubes: sa 213 tp 347h tp316 / tp304h / s304h boiler quality alloy steel tubes t91, t92 fused saw flux for drum welding fused saw flux for tube to fin welding gtaw wire for t92 er80s b2 bulk pack gmaw wire gmawwire ernicrfe 7a gmaw wire er 70s a1 gmaw wire er 80s b2 gmaw wire er347 gmaw wire ernicr3 gmaw wire er90s b9 gmaw wire er70s 6 gmaw wire er80s g 1cr mo gmaw wire er90s g 2cr mo gmaw wire for t23. saw flux p91 saw flux for sa335p92 saw wire for sa335p92 weld:ss overlay flux f48p2 em12k submerged arc welding flux for structural application saw flux struct.weld gtaw rod t92 / p92 gtaw rod er309l er 70s a1 gtaw rod er 80s b2 gtaw rod er 90s b3 gtaw rod gtaw rod tig er347 gtaw rod tig ernicr gtaw rod er90b9 er80s d2 gtaw rod gtaw rod super 304h smaw electrode e7018 a1 smaw electrode e8018 b2 smaw electrode e9018 b3 smaw electrode e9015 b9 smaw elecd t92 / p92 smaw electrode e6013 smaw electrode e7018 smaw electrode e7018 1 e7018 smaw electrode flux cored wire e71t 1 flux cored wire e309t0 1 fcaw wire e309lmoto 1 flux cored wire e81t1 b2 flux cored wire e91t1 b3 bulkpack :e551t1 b2c smaw:hf electrode ecocra smaw electrode ecocr e smaw electrodes enicrfe3 smaw electrode smaw ss electrodes ( e308 16 ) smaw ss electrdes low carbon ( e308l 16 ) smaw electrodes e309 16 smaw electrodes e310 16 smaw electrodes e316 16 smaw electrodes e316l 16 smaw electrodes e347 16 hayness alloy 25 ( ha 25 ) filler rod hayness alloy 21 ( ha 21 ) filler rod ercocr a rod hard facing powder type cocr a hard facing powder type cocr e el 8 saw wire saw wire eb3 wg:wire:saw er430 saw wire eb2 saw wire ea4 saw wire em12ksaw wire eb 9 er 309 saw wire er 347 saw wire weldwire saw em12k...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33102379 running contract for extension / improvement works in illuppur sub division in pudukkottai edc 2 pit excavation for 7.5 mts / 8 mts pole in ordinary soil including cleaning of site ( each pit ) 3 1.25 x 0.6 x 1.5m [ ordinary soil ] 4 semi rocky soil 5 pole pit for 9.0m and 9.14 m psc / rcc / all metal poles ( each pit ) 1.25 x 0.6 x 1.83 mtr 6 ordinary soil 7 semi rocky soil 8 heavy rocky soil where blasting / cheseling required [ specific approval should be obtained from concerned ee ] 9 stay pit 10 in ordinary soil [ 0.95 x 0.6 x 1.2m ] 11 semi rocky soil 12 stay pit in heavy rocky soil where blasting / cheseling reqiured [ specific approval should be obtained from concerned ee ] 13 erection of poles & stays ( including refilling of excavated earth ) 14 erection of 7.5m / 8.0m poles [ rcc / psc ] 15 erection of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles 16 stay set 17 erection stay set complete 18 stay erection without rod and pit 19 replacement of stay rod only. ( including stay pit excavation & refilling & erection ) 20 replacement of guy shackle only in existing stay 21 erection of line materials 22 fixing of lt 1 ph x arm 23 fixing of lt / ht ti fitting 24 fixing of lt 3 ph x arm 25 fixing of 3 [ 1 / 2 ] v` x arm 26 fixing of4 [ 1 / 2 ] v` x arm 27 fixing of 5 v x arm 28 fixing of tapping channel / guarding x arm 29 providing of line spacers in lt lines 1 phase 30 providing of line spacers in lt lines 3 phase 31 erection of ab switch with pt insulator & jumpering complete 32 erection of centre rotating switch ab switch complete 33 fixing of ht pin insulator / strain disc 34 11 kv pin insulator with pin 35 11 kvstrain disc / polymer disc with hardware 36 22 kv pin insulator with pin 37 22 kv strain disc / polymer disc with hardware 38 33 kv pin insulator with pin 39 33 kv pinstrain disc / polymer discwith hardware 40 fixing of lt pin insulator with pin 41 lt shakle with hardware 42 fixing of aluminium knob 43 paving stringing and sagging of conductor including binding of pin and proper tight [ including transport of condutor from road side to work spot ] per run 44 upto 7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm 45 acsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm 46 acsr 7 / 4.09 mm 47 above 7 / 4.09 mm acsr & dog conductor 48 for lc works ( all types of conductor ) 49 route surveying andpeg marking of ht / ltlines 50 earthing wiring and connection including transporting of earth pipe and excavation of pit ] 51 transformer structure earthing 10ft depth 3 nos of pipe throughtubes 52 dp earthing including all works [ double side earthing ] 53 erection of 4th earth pipe including earthing 54 earthing of poles 55 earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. 56 replacement of detoriated earth pipe per location 57 concreting with mixture 1:3:6 [ including all materials ] . 58 ( a ) transformer structure poles mass concreting with coping 0.75mx0.5mx1.8m coping material supplied by the contractor ( cement =100 kg river sand, 40 mm jully including labour 2 nos of pole in structure ) 59 ( b ) mass concerting for pole in line0.75mx0.5mx1.8m 60 ( c ) sleeve concret for poles in line 0.75m x 0.5x 0.9m 61 ( d ) sleeve concret for stay set 0.3x0.3x0.75 62 erection of distribution transformer structure complete 63 excavation of structure pole pits 0.9 x0.9 x 1.83 mtr 64 transporting of pole to pit location 2 nos. 65 erection of poles 2 nos 66 excavation of stay pit 4 nos 67 erection of stay set ( 4 sets ) 68 mass concreting ( cement:sand:jelly supplied by the contractor ) 2 nos. 69 erection ofab switch 70 transformer structure earthing 10ft depth 3 nos of pipe through earth tubes 71 erection of top channel 72 bed channel [ 2 nos channel ] erection 73 cross with stud for bed channel erection 74 erection of belting angle / hg fuse angle 75 erection ofhg fuse set 76 erection of ht las with jumpering and earthing 77 erection of lt las with jumbering and earthing 78 erection of jumpering [ ht side ] 79 transformer wiring in lt side including jumpering bus bar etc. 80 erection lt open type fuse unit arrangement single 81 erection lt open type fuse unit arrangementdouble 82 painting of stru. complete excluding dt [ two coat of red oxide ] all metal parts ( excluding cost of paint ) . 83 painting of stru. complete excluding dt [ one coat alu paint, excluding cost of paint ) 84 colour washing of 2 numbers structure pole [ excluding cost of distember / snowsem ] 85 painting name of ss at seating channel including paint. 86 painting of dt alone [ excluding painting ] with red oxide and double coating of aluminium paint. 87 erection of single pole mounted dt erection work ( including pole concreting & 3nos earth pipe & paintimng ) 88 erection of dt metering arrangement ( materials supplied by the board ) 89 erection of distribution transformer / dismantling of dt 90 upto 100 kva 91 above 100 kva and upto 250 kva 92 500 kva 93 colour washing of rcc / psc poles 94 numbering of poles including cost of paint / loc [ black background and yellow letters ] 95 painting of sc details in the meter board / agl boxes / hut scs including paint. 96 service connection 97 transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling 98 transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp / led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. 99 fixing of street light fitting with 2 cfl / 4 cfl 100 provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. 101 erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot 102 erection / dismantling of metering set 11 kv / 22 kv / 33 kv 103 fabrication works. 104 labour charges for alteration of back clamp / stay clamp to suitable for works. 105 providing of holes. 106 all size angles / channel upto 5 / 8 107 all size angles / channel above 5 / 8 108 slot holes in flat / angles / channel upto 3 / 4 109 slot holes in flat / angles / channel above 3 / 4 110 fabrication of centre support only for dt structure 111 cutting of rs joist / angles / ms channels 112 welding of rs joist / angles / ms channels 113 general 114 set right the leaning pole in both ht & lt [ pin point ] location 115 set right the leaning pole in both ht & lt [ cut point ] location 116 resagging of lines for all sizes cut point location 117 converting pin point into cut point ht lines 118 converting pin point into cut point lt lines 119 clearing tree branches ofcoconut tree 120 clearing tree branches of neem, tamarind, countrytree etc., 121 releasing and re erection of1 ph sc wire [ during conductor or support change ] 122 releasing and re erection 3 ph sc wire [ during conductor or support change ] 123 destruction of pole concerting at site. 124 retrieving grill from detoriated pole [ grill separate from damaged pole ] 125 re earthing of structure completely including earthpipe changing if any 3nos earth pipe 126 re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) 127 guarding arrangement : 128 cradle guarding including earthing and earth pit excavation [ railway & p&t crossing ] 129 flat guarding with 4 wire 130 split netural guarding 131 loading and unloading : 132 loading of 7.5 mtr / 8.0 mtr rcc / psc / metal pole [ per pole ] 133 loading of [ 9.14 mtr ] 9.0 mtr poles rcc / psc pole / metal pole [ per pole ] 134 unloading of psc / rcc / metal poles 135 transporting from road side to workspot 136 transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km 137 transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] 138 transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km 139 transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof 140 transport of line materials 141 transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms 142 transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km 143 loading / unloading of line materials 144 transport of equipements 145 transporting of distribution transformer / metering set by using private vehicleload of one no.minimumup to 30 km 146 .transporting of distribution transformer / metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km 147 dismantling works 148 dismantling of 7.5m / 8.0m poles [ rcc / psc ] 149 dismantling of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles 150 dismantling stay set complete 151 dismantling of lt 1 ph x arm / lt / ht ti fitting 152 dismantling of lt / ht ti fitting 153 dismantling of lt 3 ph x arm 154 dismantlingof 3 [ 1 / 2 ] v` x arm 155 dismantlingof tapping channel and guarding x arm 156 dismantling of 11 kv strain disc / polymer disc with hardware 157 dismantling of 22 kv pin insulator with pin 158 dismantling of 22 kvstrain disc with hardware 159 dismantling of 33 kv pin insulator with pin 160 dismantling of 33 kvstrain disc with hardware 161 dismantlingof lt pin insulator with pin 162 dismantlingof lt shackle with hardware 163 dismantling of aluminium knob 164 dismantling of conductor7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm 165 dismantling of conductoracsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm 166 dismantling of conductoracsr 7 / 4.09 mm 167 single phase meter &3 phase meter 168 replacement ( releasing & fixing ) of single phase meter ( including transport charges ) 169 replacement ( releasing & fixing ) of three phase meter ( including transport charges ) 170 checking healthiness of agl.meter 171 checking healthiness of agl.meter1...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

33010999 relay test kit relay test kit for mrt wing , supply of relays , 0.6kva ups , relay test kit , 2kva servo stabilizer , pole pit for 9.0m and 9.14 m psc / rcc / all metal poles ( each pit ) 1.25 x 0.6 x 1.83 mtr , ordinary soil , semi rocky soil , heavy rocky soil where blasting / cheseling required [ specific approval should be obtained from concerned ee ] , stay pit , in ordinary soil [ 0.95 x 0.6 x 1.2m ] , semi rocky soil , stay pit in heavy rocky soil where blasting / cheseling reqiured [ specific approval should be obtained from concerned ee ] , erection of poles & stays ( including refilling of excavated earth ) , erection of 7.5m / 8.0m poles [ rcc / psc ] , erection of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , stay set , erection stay set complete , stay erection without rod and pit , replacement of stay rod only. ( including stay pit excavation & refilling & erection ) , replacement of guy shackle only in existing stay , erection of line materials , fixing of lt 1 ph x arm , fixing of lt / ht ti fitting , fixing of lt 3 ph x arm , fixing of 3 [ 1 / 2 ] v` x arm , fixing of4 [ 1 / 2 ] v` x arm , fixing of 5 v x arm , fixing of tapping channel / guarding x arm , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , erection of ab switch with pt insulator & jumpering complete , erection of centre rotating switch ab switch complete , fixing of ht pin insulator / strain disc , 11 kv pin insulator with pin , 11 kvstrain disc / polymer disc with hardware , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pinstrain disc / polymer discwith hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [ including transport of condutor from road side to work spot ] per run , upto 7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , acsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , acsr 7 / 4.09 mm , above 7 / 4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit ] , transformer structure earthing 10ft depth 3 nos of pipe throughtubes , dp earthing including all works [ double side earthing ] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [ including all materials ] . , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set ( 4 sets ) , mass concreting ( cement:sand:jelly supplied by the contractor ) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth 3 nos of pipe through earth tubes , erection of top channel , bed channel [ 2 nos channel ] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection ofhg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ ht side ] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangementdouble , painting of stru. complete excluding dt [ two coat of red oxide ] all metal parts ( excluding cost of paint ) . , painting of stru. complete excluding dt [ one coat alu paint, excluding cost of paint ) , colour washing of 2 numbers structure pole [ excluding cost of distember / snowsem ] , painting name of ss at seating channel including paint. , painting of dt alone [ excluding painting ] with red oxide and double coating of aluminium paint. , dt metering arrangement ( without materials ) , erection of distribution transformer / dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of rcc / psc poles , numbering of poles including cost of paint / loc [ black background and yellow letters ] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 ws.v. lamp / mercury lamp / led yard light fittingincluding wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl / 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection / dismantling of metering set 11 kv / 22 kv / 33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5 / 8 , all size angles / channel above 5 / 8 , slot holes in flat / angles / channel upto 3 / 4 , slot holes in flat / angles / channel above 3 / 4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt [ pin point ] location , set right the leaning pole in both ht & lt [ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches ofcoconut tree , clearing tree branches of neem, tamarind, countrytree etc., , releasing and erection 1 ph sc wire [ during conductor or support change ] , releasing and erection 3 ph sc wire [ during conductor or support change ] , destruction of pole concerting at site. , retrieving grill from detoriated pole [ grill separate from damaged pole ] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement : , cradle guarding including earthing and earth pit excavation [ railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr rcc / psc / metal pole [ per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles rcc / psc pole / metal pole [ per pole ] , unloading of psc / rcc / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer / metering set by using private vehicleload of one no.minimumup to 30 km , .transporting of distribution transformer / metering set by using private vehicleload of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [ rcc / psc ] , dismantling of 9.00m / 9.14m rcc / psc / rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt / ht ti fitting , dismantling of lt / ht ti fitting , dismantling of lt 3 ph x arm , dismantlingof 3 [ 1 / 2 ] v` x arm , dismantlingof tapping channel and guarding x arm , dismantling of 11 kv strain disc / polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kvstrain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kvstrain disc with hardware , dismantlingof lt pin insulator with pin , dismantlingof lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor7 / 2.59 mm acsr, 7 / 2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductoracsr 7 / 3.35mm & 7 / 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductoracsr 7 / 4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter...

Neyveli Lignite Corporation Limited - Tamil Nadu

32909623 providing ceramic insulated probe with pre amplifier s 61(is) pre amplifier s 61(s): electronic components fully encapsulated against dust and water jets. operating frequency : 500 khz. probe : type : rod rod dia. : 8 mm rod material : ss 316 ground tube : ss 316 insulation : ceramic housing : cast aluminum paint : siemens epoxy grey protection : ip 65 process connection : 2 asa 150# built in flange (od : 150mm, pcd : 110mm, hole : 18mmx4 nos, thickness : 15mm+/ 2mm, ff material ss316) operating pressure : 24 bar max.(+ve pressure) 400 mm hg ( ve pressure) temp : > 150 deg c. length : 150 mm rf – capacitance type level transmitter mlc –300 (is) accuracy : ± 2% of full scalerange indication : 0…….100% digital (2 1/2 digitdisplay) output : 1) 4……20 ma non isolated 2) 0……5v mainvoltage : 24 v dc±10% full insulated probe with preamplifier s11 (is) preamplifier s11 (is) : electronics component fully encapsulated against dust <(>&<)> water jets. operating frequency 33 khz probe dia : 12 mm material : ss 316 connection : flange material : ss 316 insulation : full ptfe probe housing : ex proof length : 465 mm nivolarm alc 541(is) mounting : suitable for cabinet mounting time delay : 0.5 sec 20 sec (adjustable) outputs : level alarm a) 1 no.dpdt relay rated 5a at 230 v ac for non inductive loads. functional alarm b) i) 1 no spdt relay rated 5a at 230 v ac for no inductive loads. ii) 7 segment led for operation code display indication : red led : for level alarm. green led : for normal alarm yellow led : for functional alarm. power supply : 24 v dc +/ 10%...

Southern Railway - Tamil Nadu

32780149 supply of aluminum paint spray gun with 1000 ml paint container, working air pressure up to 30psi. make:pilot,dewalt, eastman, ingersoll, crompton, ingco.aluminum paint spray gun with 1000 ml paint container, working air pressure up to 30psi. make:pilot,dewalt, eastman, ingersoll, crompton, ingco.,aluminum paint spray gun with 1000 ml paint container, working air pressure up to 30psi. make:pilot,dewalt, eastman, ingersoll, crompton, ingco....

Southern Railway - Tamil Nadu

32707022 supply of paint aluminiumpaint aluminium,paint aluminium for general purpose in dual container to is:2339/1963 (reaffirmed 2009) amdt. no.4 of april 2006 & icf/md/spec 052, issue status 2, rev.01 packed in 20 litres new and sound non returnable m.s.drums to is:2552/89 gr.b2....

Integral Coach Factory - Tamil Nadu

32461778 supply of aluminium paintaluminium paint,aluminium paint for general purpose brushing (in 4 litres dual container to specn.is:2339 2013 please visit icf vendor portal for downloading drawing http://vp.icf.gov.in/vendtendordetnew.php using key : 0622rohgzqk1445 furnishing tamil nadu 4757.00 litre...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

32425396 nctps –ii m ii circle – chp & fp dn foph – supply and erection of existing damaged / peeled insulation and its accessories in hfo re circulation lines from foph outer area to unit ii boiler 22 meter area & painting the hfo re circulation line by using hr 47 aluminum paint and devolution of retrieved materials to stores including all safety appliance, scaffolding arrangement, cost of consumables and t&p hire charges....

Southern Railway - Tamil Nadu

32378335 supply of aluminum paint spray gun with 1000 ml paint container, working air pressure up to 30psi.aluminum paint spray gun with 1000 ml paint container, working air pressure up to 30psi.,aluminum paint spray gun with 1000 ml paint container, working air pressure up to 30psi. make:pilot,dewalt, eastman, ingersoll,crompton....

Tamil Nadu Cooperative Sugar Federation Limited - Tamil Nadu

32322875 purchase of paints purchase of paints , red oxide primer , smoke grey paint , golden yellow paint , postal red paint , bus green paint , sky blue paint , p.o. red paint , aluminium paint with paste , hrac black paint , synthetic enamel white paint , azure blue , jada green , sky blue , golden yellow paint , smoke grey paint , acide alkali heat resistant white paint , thinner for the above...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

32273241 labour contracts for rdss hvds scheme with dts and ht / lt line in 11kv ettakkapatti feeder of33 / 11 kv ssvembakkottaiat ae / d / vembakkottai section in sivakasi division of virudhunagar edc under rdss scheme in thayalpatti ss i, iv, x & xii and subramaniyapuram ss ii, salvarpatti iii & viii 2 excavation of staypit4.5 to 5 depth by using jcb or manual 3 excavationofpolepitupto8 mtr psc poles by using jcb or manual 4 excavationofpolepitupto9.14 mtr pole by using jcb or manual 5 excavationofrsj polepitabove 36 by using jcb or manual 6 erection of 8 mtr psc poles by using jcb or maual 7 erection of 9 mtr psc poles by using jcb or maual 8 erection of rsjrail, fabricatedpolesabove 36 0 by using jcb or maual 9 erectionofstay set complete 10 fixing of 3.6v crossarmstaping ( all types ) / taping channelcrossarms / guarding crossarms 11 fixing of 4.6v crossarms ( all types ) / channelcrossarms / guarding crossarms 12 fixing of lt 3 phasecross arms 13 fixing of lt single phase cross arms 14 fixing of ht / lt tifittings 15 fixingofpin insulators with pin 11 kv 16 fixingof11 kvstrain disc. 17 fixingoflt pin insulator with pin 18 fixingoflt shackle 19 fixingofaluminium knob 20 earthingofpolewithpinincludingburyingloopingand binding 21 pavingofconductor, stringing, binding jumperingetc., completewith7 / 4.09acsrforbothht / ltlines without lc work. 22 pavingofconductor, stringing, binding jumperingetc., completewith7 / 3.35 mm acsrfor both ht / lt lines without lc work. 23 concreting of poles as per board standards ( 2*2*5 ) . the material such as sand, jelly, etc., have to be supplied by contractor including cement supplied by contractor ( cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges for placing transporting of sand, jally, from box and water curing etc, . complete as per field engineers instructions. 24 erectionofsingle pole transformerstructure completeinallrespects withwiring earthing, fixingofopentypefuseunits, ht / lt / lasandjumpering3 nos.earth pitswithtubs includingpaintingofmetal parts, structurepoles, fixingof topchannel seatingchannel, beltingangle ( except erection oftransformer ) 25 erectionof double pole transformerstructure completeinallrespects withwiring earthing, fixingofopentypefuseunits, ht / lt / lasandjumpering3 nos.earth pitswithtubs includingpaintingofmetal parts, structurepoles, fixingof topchannel seatingchannel, beltingangle ( except erection oftransformer ) 26 flat guarding arrangement 4wire 27 transportofmaterials / conductors andother materials from road side to site. 28 loading / unloadingofpolesupto8 mtr psc poles 29 loading / unloadingofpolesupto9 mtr psc poles & rcc square pole 30 loading / unloadingofpolesabove 36 0 rsj pole 31 transportingof8mt polesfromroadsite topolepitincluding loadingandunloading ofpoles by using jcb or manual 32 transportingof 9.0mtpoles& 9.0mt rcc square pole fromroadsite topolepitincluding loadingandunloading ofpoles by using jcb or manual 33 transporting ofpolesabove 36 0 rsj polefromroadsite topolepitincluding loadingandunloading ofpoles by using jcb or manual 34 loadingorunloadingoftransformer upto200 kvafor each 35 transporting ofdistribution transformer up to 20km 36 erectionofnewtransformerupto 200 kva 37 dismantling of distribution transformer upto 200kva 38 dismantling of 7 / 2.59sq.mm acsr with lc work 39 dismantling of 7.5 / 8 mt poles 40 dismantling of 3phase x arm 41 releasingofsingle phaseserviceand re fixing. 42 releasingof3 phaseserviceand ( upto 50 hp ) re fixing. 43 alteration ofbackclamp 44 alteration ofstayclamp 45 fixing of dt metering labour charges 46 provisionofdistributiontransformername board ( name ofthe22 / 11kv #, name of thess, capacity, danger board. ) 47 cutting of coconut leaves ( per tree ) 48 drilling of hole in channel only 3 / 4 & 1 per hole 49 cutting of channel 50 cutting of angle 51 painting of rsj pole including cost of red oxide and aluminium paint 52 painting of varm, ht / lt ti fitting , 3 ph and single ph xarm...

Tamil Nadu Generation And Distribution Corporation Limited - Tamil Nadu

32250067 elecy cedc / north / coimbatore works contract for execution of various works under rdss schmes in seeranaicken palayam sub division of s.n.palayam division excavation of pole pits / stay set: , for pole upto 8.00m length by using jcb / manual , for pole above 8.00m length by using jcb / manual , in hard soil ( common to all size of poles ) , in rocky area ( common to all size of poles ) by blasting / manual , excavation of stay pit of 4.5 to 5 depth using jcb / manual , excavation of stay pit in hard rock soil , excavation & back filling of stay pit per location hard rock requires blasting , excavation & back filling of stay pit per location hard rock without blasting , excavation & back filling of stay pit per location medium rock and dense medium rock requires blasting , erection of poles and accessories , erection of rcc, rec, psc poles upto 8.00m length by using crane / manual , erection of rcc, rec, psc poles above 8.00m length by using crane / manual , erection of metal supports above 9m / rsj / rail pole / tubular poles , erection of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. , erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. , erection of stay set complete in the rock area by blasting , replacement of stay rod only. ( including stay pit excavation & refilling & erection ) , replacement of guy shackle only in existing stay , fixing of line materials , v cross arm 3.5feet , v cross arm4.5 feet , v cross arm5.0 feet , fixing of lt s phase cross arm , fixing of lt 3 phase cross arm , fixing of ht / lt ti fitting , fixing of ht pin insulator with pin 11 kv , fixing of ht pin insulator with pin 22 kv , fixing of ht pin insulator with pin 33 kv , fixing of lt pin insulator , fixing of ht strain disc 11 kv , fixing of ht strain disc 22 kv , fixing of ht strain disc 33 kv , fixing of two tapping cross arm per cut point upto 33 kv line including fixing of discs, insulators and jumpering etc.. , set right of all sizes of leaning poles , fixing of shackle , fixing of aluminium knob , fixing of ht las ( 3 nos. ) , fixing of lt las ( 3 nos. ) , double channel x arm , guarding cross arm , tapping channel cross arm , fixing of open type fuse unit , providing of line spacers in lt lines 1 phase , providing of line spacers in lt lines 3 phase , fixing of lt capacitor , erection of centre rotating switch ab switch complete , set right of all sizes of leaning poles , resagging of lines for all sizes at cutpoint location per wire / span , intergrater dt metering arrangements / whole current meter , erection / dismantling metering set 11 kv / 22 kv , stringing of conductors: , paving and stringing of conductors of sizes upto 7 / 2.59 mm acsr or other equivalent conductor , paving and stringing of conductors ofabove7 / 2.59 mm acsr or other equivalent conductor upto 7 / 3.35mm acsr or other equivalent conductor , paving and stringing of conductors of one run of pvc cable line of all sizes with gi wire and reel insulator. , paving and stringing of conductors of7 / 4.09mm acsr or other equivalent conductor , paving and stringing of conductors of7 / 4.72 mm dog conductor or other equivalent conductor , releasing and reerection ( resagging ) of one run of all sizes of conductor , erection of distribution transformers: , erection of distribution transformer structure complete as per tneb standard including painting, feeders arrangrment, colour washing of rcc poles etc.. fixing of poles type to be unit ht / lt las and jumpering 3 nos earth pits with earth trough except erection of distribution transformer. ( double pole structure with 10 feet centre ) , erection of distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa. , ( i ) upto 25 kva distribution transformer / metering set. , ( ii ) above 25 kva to 100 kva , ( iii ) above 100 kva to 250 kva , ( iv ) 500 kva and above , ( v ) failed dt replacement below 100 kva , ( vi ) failed dt replacement 100 kva and above , erection of 11 kv single pole structure including erection of dt complete without centre support. , erection of 11 kv single pole structure including erection of dt complete with centre support . , erection of dp structure: , erection of dp structure with stay as per tneb standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., , ( i ) with 11 kv ab switch using all types of poles of size 9.14 m and above length , ( i ) with 22 / 33 kv ab switch using all types of poles of size 9.14 m and above length , erection of single pole dp with completeand with single earth , concreting works: , concreting with 1:4:8 mix using 40 mm jelly including curing ( material + labour ) , ( i ) mass concreting of poles , ( ii ) sleeveconcreting , ( iii ) stay concreting , earthing: , ( i ) earthing of poles with gi wires 4 or 6 swg by coil earthing , ( ii ) provision of spike including earthing arrangement , ( iii ) pipe earthing including excavation of earth pit and fixing earth pipe 3 m length , ( iv ) replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination , ( v ) replacement of corroded earth pipe , loading and unloading charges: , loading or unloading of distribution transformer , ( i ) upto 100 kva , ( ii ) above 100 kva and upto 500 kva , ( iii ) metering set of all ratios , loading or unloading of various sizes of poles , ( i ) rec, rcc, psc pole upto 8.00 m length , ( ii ) all rec, rcc pole above 8.00 m length , ( iii ) metal poles all sizes , loading of conductor , unloading of conductor , loading / unloading of iron & steel , loading / unloading of oil , loading / unloading of line materials , loading / unloading of 11 kv strain disc , loading / unloading of lt pin insulator shackle, guy shackle, lt pin, metal parts, ht pin etc., , loading / unloading of meters , ( i ) single phase meter , ( ii ) three phase meter , guarding arrangement , provision of guarding with two numbers earth pits excluding stay set erection , ( i ) flat guarding with earth pit , ( ii ) split neutral , transportation charges: , transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50 km , transportation of all type of poles by bullock cart or other vehicle ( for all sizes of poles including loading and unloading ) , ( i ) for a lead upto 5 km , ( ii ) above 5 km of lead of every km , transport of metal pole of all sizes by head loads in hill areas from road side to pole pit location , ( i ) upto 1 km , ( ii ) above 1 km per each km , transporting of conductors of all sizes from road side to pit locations upto one km of conductor , ( i ) transporting of distribution transformer / line materials from stores to office / site upto 10 km distance by engaging 1 ton capacity minidor ( lorry ) , ( ii ) above 10 km , dismantling charges , dismantling of rcc, rec, psc & metal pole of all sizes including the closing of the pit , for breaking the mass concrete of all supports , dismantling of line materials , dismantling of double channel x arm , dismantling of guarding cross arm , dismantling oftapping channel x arm , dismantling of 11kv pin with insulator , dismantling of 11kv composite disc with mp , dismantling of 22kv pin with insulator , dismantling of 22kv composite disc with mp , dismantling of 33 kv pininsulator , dismantling of 33 kv disc , dismantling of 5 v x arm , dismantling of 1372 mm ( 46 ) v x arm , dismantling of 1068 mm ( 36 ) v x arm , dismantling of h.t / l.t. t.i. fitting , dismantling of3ph x arm , dismantling of1ph x arm , dismantling of aluminium knob , dismantling of lt shackle with mp , dismantling of lt pin with insulator , dismantling of lt open type , dismantling of top channel , dismantling of belting channel , dismantling of bed channel , dismantling of metering set 11 kv / 22 kv / 33 kv , dismantling of dt below 200 kva , dismantling of dt 200 kva & above but below 500 kva , dismantling of dt 500 kva , dismantling of knob , dismantling of ht las ( 3 nos ) , dismantling of lt las ( 3 nos ) , dismantling of stay set complete , ( i ) including stay rod , ( ii ) without stay rod , dismantling of conductor ofupto 7 / 3.35 including transporting the conductors to the nearest road side and stocking in coils , dismantling of conductor ofabove 7 / 3.35 including transporting the conductors to the nearest road side and stocking in coils , dismantling of transformer structure materials complete set and transporting the same from the location to the road side , dismantling of cross arm clamps ti fitting hardwares, insulators etc., , painting: , painting of distribution transformer of all capacities ( paint to be supplied by the board ) including cleaning of dt , numbering of poles including base painting and with cost of paint , painting of iron poles up to 36 ft length with double coats including cost of paint , painting of iron poles up to 40 ft 200 / 100 length with double coats including cost of paint , painting of cement poles by distember coating including cost of distember , painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details ( items 1 to 6 brush to be owned by the contractor ) ( paint to be supplied by department ) , service connection details painting , miscellaneous works , fixing and dismantling of single phase meter , fixing and dismantling of three phase meter , releasing and erection 1 ph sc wire [ during conductor or support change ] , releasing and erection 3 ph sc wire [ during conductor or support change ] , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , re earthing of structure completely , provision of street light, switching arrangement including fixing of meter, wiring & service board etc., , fixing of street light , destruction of pole concreting at site , retrieving grill from deteriorated rcc pole , fixing of modem including accessories , cleaning of rmu , cleaning of ring fencing , knitting of chair including supply materials. , workshop charges: , manufacturing / altering of clamps , drilling of holes in the structure materials clamps etc., , ab switch or open type side arm stud, cutting and drilling holes , manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe , general: , numbering of poles including cost of paint , painting of iron poles up to 36 ft length with double coats including cost of paint , painting of iron poles up to 40 ft 200 / 100 length with double coats including cost of paint , removing weed in substation yard / office premises , bush clearance out side substation yard / office premises ( light ) , jungle clearance such as kattu karuvai in the various area without uprooting , jungle clearance such as kattu karuvai in the various area with uprooting , clearing of tree braches of coconut trees , clearing of tree braches of neem, tamarind, country wood etc , leveling of ground using bul dozer , clearing of branches / trees with jcb , fencing of distribution transformer structure at road side fabrication and erection. ( including all materials ) ...

Bharat Heavy Electricals Limited - Tamil Nadu

32201565 fabrication and supply of expansion bellows as per nit , spares expansion bellow fs rc expn. joint size: 1310x1310; sty.4 rt per rm upto & incl 63mm pl thick add joints of cs sheet / pl upto 4 mm / rm add joints of cs plate 5 to 10 mm / rm add joints of cs plate 12 to 20 mm / rm add joints for cs plate 21 25 mm / rm add joints for cs plate 26 32 mm / rm add joints for cs plate 33 36 mm / rm add joints for cs plate 37 40 mm / rm add joints for cs plate 41 50 mm / rm add joints for cs plate 51 56 mm / rm add joints for cs plate 57 70 mm / rm add joints for cs plate 71 100 mm / rm add joints for cs plate above 100 mm / rm add joints of as sheet / pl upto 4 mm / rm add joints of as plate 5 to 10 mm / rm add joints of as plate 12 to 20 mm / rm add joints for as plate 21 25 mm / rm add joints for as plate 26 32 mm / rm add joints for as plate 33 36 mm / rm add joints for as plate 37 40 mm / rm add joints for as plate 41 50 mm / rm add joints for as plate 51 56 mm / rm add joints for as plate 57 70 mm / rm add joints for as plate 71 100 mm / rm add joints for as pl above 100 mm / rm joints beam / channel upto 204 mm / joint joints beam / channel above204 304mm / joint joints beam / channel above304 450mm / joint joints of angles upto 75x75x8 joints of angles > 75x75x8 upto 100x100x12 joints of angles above 100x100x12 joints in beam / channel above 450 mm add joints of ss sheet / pl upto 4 mm / rm add joints of ss plate 5 to 10 mm / rm add joints of ss plate 12 to 20 mm / rm add joints of ss plate 21 to 40 mm / rm joints in cs hanger rods upto dia 25 mm / joint joints in cs hanger rods 26 50 mm / joint joints cs hanger rods 51mm&above / joint joints in as hanger rods upto dia25mm / joint joints in as hanger rods 26 50 mm / joint joints as hanger rods 51mm & above / joint joints ss hanger rods upto dia 25mm / joint joints in ss hanger rods 26 50 mm / joint joints ss hanger rods 51mm &above / joint furnace ht normalizing , tempering and stree relieving rate each cycle solution annealing local stress relieving of plate butt joints furnace ht of hanger items > 1 m ( no. of cycles not applicable ) labour cost for one coat of painting nitriding of component ( job wt ) electro galvanizing and chromotizing of threaded portions per kg of component wt. stellite welding synthetic enamel long alkyd to is 2932 red oxide primer to is:2074 / is:12744 / rust preventive oil ral 9002 primer paint inorganic ethyl zinc silicate primer epoxy finish paint epoxy zinc phosphate primer epoxy based polyamide cured tio2 / mio paint chlorinate rubber based zinc phosphate primer chlorinated finish paint heat resistant aluminium paint grade 2 / grade 1 aliphatic acrylic polyurethane epoxy polyamide cured finish paint epoxy glass flake paint moisture curing ethyl zinc silicate primer coat ( minimum 80% metallic zinc content ) 1 / 2hb epoxy zinc rich primer ( 80% zn dust pigment ) blast cleaning of jobs above 30 mt blast cleaning of jobs above 20 mt & up to 30 mt blast cleaning of jobs above 15 mt & up to 20 mt ) blast cleaning of jobs above 10 mt & up to 15 mt blast cleaning of jobs above 5 mt blast cleaning of ducts ( above 100 kg & up to 5 mt ) blast cleaning of jobs upto 50 kg blast cleaning of jobs above 50 kg blast cleaning of running metre items ( up to 100 kg ) blast cleaning of running metre items ( above 100 kg ) blast cleaning of jobs above 100kg to 5 mt ( other than ducts ) machining plain turning ( per kg of material removed ) deduction of dts ( 0 80 km ) deduction of dts ( 80 175 km ) deduction of dts ( 175 350 km ) non ferrous scrap non ferrous turnings & borings scrap cs / as sheets , plates & structurals ferrous tubes and pipe scrap ss scrap ( magnetic ) ss scrap ( non mgnt ) other than 310 / 310s ss scrap ( non mgnt ) 310 / 310s big size scrap ( as / cs ) turnings & borings scrap ( cs / as ) turnings & borings scrap ( ss mgnt ) turnings & borings scrap ( ss non mgnt ) non return consumables ( like ropes , etc ) => limited...

Integral Coach Factory - Tamil Nadu

32031163 supply of alu paint in dual containeralu paint in dual container,aluminium paint for general purpose brushing (in 4 litres dual container to specn.is:2339 2013. please visit icf vendor portal for downloading drawing http://vp.icf.gov.in/vendtendordetnew.php using key: 0622guvbblc1395 furnishing tamil nadu 563.00 litre...

Chennai Petroleum Corporation Limited - Tamil Nadu

31888309 painting works in oms i ii at cpcl manali refinery chennai 68 painting works in oms i ii at cpcl manali refinery chennai 68 , supply and application of paints as per cpcl painting systems. , primer / intermediate coat: , self priming epoxy paint (dft 100 micron) (application by brush). , polyamide cured hb epoxy mio paint (by brush) (dft 75 micron). , epoxy zinc phosphate primer (dft 30 microns). , finish paints: , heat resistant aluminium paint(dft 20 microns) (upto 250deg c) (application by brush). , acrylic polyeurethene paint (dft 35 micron) (application by brush). , high build coal tar epoxy paint (application by brush) (dft 100 micron per coat). , surface preparation: , hand tool cleaning to the requirement of st 2 / sspc sp 2without water washing. , letter stencilling: , stencilling of letters and numbers sizes upto and including 2 size , stencilling of letters and numbers sizes above 2 upto and including 4 size , stencilling of letters and numbers sizes above 4 upto and including 6 size => limited...

V O Chidambaranar Port Trust - Tamil Nadu

31867807 tender for procurement of painting materials for providing to port vehicles quotation called for reg brilliant white (in 1 ltr. container) 2 oxford blue (in 4 ltr. pack) 3 oxford blue (in i ltr. pack) aluminum paint (in i ltr. pack) aluminum paint (ln % ltr. pack) 6 turpentine oil (in 5 ltr pack) 7 turpentine oil (in 1 ltr. pack) 8 chassis red oxide (in 4 ltr. pack) chassis red oxide (in i ltr. pack) black board paint (ln 1 ltr. pack) 11 nc thinner (ln 1 ltr. pack) 12 opline green (in 4 ltr. pack) 13 opline green (in 1 ltrpack) 14 p.o. red(in 4 ltr pack) 15 p.o. red(jn1 ltr.pack) 16 golden yellow (in 4 ltr.pack) 17 black paint (in 4 ltr pack) 18 black paint (ln 1 ltr. pack)...

Southern Railway - Tamil Nadu

31832757 supply of aluminum paint spray gun with 1000 ml paint container, working air pressure up to 30psi.aluminum paint spray gun with 1000 ml paint container, working air pressure up to 30psi.,aluminum paint spray gun with 1000 ml paint container, working air pressure up to 30psi. make:pilot,dewalt, eastman, ingersoll,crompton....